MISCELLANEOUS POLISH HIGHWAY AND RAILDROAD DATA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A032000670001-2
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
11
Document Creation Date: 
December 22, 2016
Document Release Date: 
March 18, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
January 22, 1957
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A032000670001-2.pdf326.01 KB
Body: 
Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246A032000670001-2 INFORMATION REPORT INFORMATION REPORT CENTRAL INTELLIGENCE AGENCY r This material contains information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title 18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law. F-?ROCEE a NG C OPY CONF:IDEN'T'7'Ar, SUBJECT Miscellaneous Polish Highway and DATE DISTR. 22 January 1957 25X1 Railroad Data NO. PAGES REQUIREMENT NO. RD DATE OF INFO. PLACE & DATE ACQ. ARMY review completed. STATE X ARMY NAVY AIR FBI AEC 0 I N FORMATION REPORT I N FORMATION REPORT Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246A032000670001-2 Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246A032000670001-2 Enclosure A CONIFI DF-NTIAL THIS IS UNEVALUATED, ADVANCE INFORMATION MISCELLANEOUS POLISH HIGHWAY AND RAILROAD DATA I--- -E-- Summary: data on the construction and condition of miscellaneous Polish highways and railroad lines. Hi iway:.described include the WARSAW-LODZ, LODZ-WROCLAW (BRESLAU) and JEt NIA GCItA- BOGAT!NIA routes: these or rtions of them are sketched in Annexes A through D. Ia special Soviet train making scheduled runs on the WROCLAW-TERESPOL line. THIS IS UNEVALUATED, ADVANCE INFORMATION CON FlDCNTII-L Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246A032000670001-2 Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246A032000670001-2 LONFIOENTIAL MISCELLANEOUS POLISH HIGHWAY AND RAILROAD DATA 1. Highways a. Maps since 1952 or 1953, it had been possible to obtain road maps of Poland giving road surfaces, conditions, approximate widths9 and classes of roads (first, second, or third) at ordinary bookstores. obtained such a map at a bookstore in WARSAW. These maps were published by the Polski Zwiazek Motorowy (Polish Motor:jbion) and were available without restric- tion to everyone. b. Existing Highways (1) WARSAW-LODZ (see Annex A) (considered as firs -c ass , was about 10 to 12 m wide and was partly of stone-brick and partly of asphalt surfacing. The countryside was generally flat, and no steep 25X1 grades or sharp turns in the road. (2) LODZ-WROCLAW (see Annexes B and C) 25X1 The highway from LODZ to PABIANICE was in good condition, had an asphalt surface, had no holes and was approximately 10 to 12 m wide. A two-track electric trolley line ran adjacent to the road on the northwest side. The section from PABIANICE to SIERADZ was an excellent road which had been constructed in about 1934 and which had since held up very well. Polish roads were constructed to last longer and with less upkeep 25X1 than German roads, as evidenced by the poor condition of roads in new Poland (the former German territories); such Polish constructed roads as this PABIANICE- SIERADZ route had held up in spite of the heavy use and neglect of the WW II years. (Both the Soviet and German armies ran heavy tanks over this road without apparent damage to it.) This section was a concrete read about 10 to 12 m wide, The highway from SIERADZ to WROCLAW was about 10 m wide, was of asphalt and stone- brick surfacing and was in fair condition. From SIERADZ to about KEPNO there were dirt shoulders about one meter wide on both sides of the read. The entire road from LODZ to WROCLAW was generally in flat terrain, and no 25X1 steep grades or sharp turns. (3) JELENIA GORA-ZGORZELEC-BOGATYNIA (see Annex D) The section from JELENIA G(RA to ZGCRZELEC was a good road 10 to 12 m 25X1 wide with asphalt and stone-brick surfaces. The road was winding with some medium grades, particularly near JELENIA GCRA. A few kilometers east of ZGORZELEC there was a border guard check point, at which all vehicles were stopped and CONFIDENTIAL Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246A032000670001-2 Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246AO32000670001-2 CON FI D E NTI4L 3 passengers' documents were checked for authorization to enter the border area. The section from ZGORZEIEC to BOGATYNIA was little-traveled and in poor condi- tim. The initial 10 to 20 km was in fair condition and was about 10 m wide, with asphalt or stone-brick surfacing. The remainder of the road to BOGATYNIA was narrower (about eight meters), had many holes and was in very poor condition. Very narrow sections existed in several of the small villages. 2, Railroads WARSAW-IAWICZ-ZGIERZ-LODZ. - - - - Had two or more ,tracks WARSAW-SKIERNIEWICE-KOIIJSZKI-LODZ,- Had at least two tracks. LODZ-WROCLAW- - - - - - - - - - - Had at least two tracks, WROCLAW-DZIERZONIOW- - - - - - - - Number of tracks was unknown There van-only one train per day WROCLAW-JEIENIA GORA- - - - - - - - Had at least two tracksa~ one train er day there vas onl WARSAW-RADOM-KRAKOW, - - - - - - - Had at least two tracks throughout. KRAKOW-ZAKOPANE- - - - - - - - - - Number of tracks was unknown WARSAW-SKIERNIEWICE-KOIITSZKI-PIOTRKCV TRYB-RADOMSKO-CZESTOCHOWA-KATCWICE,,- Had at least two tracks throughout. WARSAW-NASIEISK-GDANSK- - - - - - - Had at least two tracks throughout. GDANSK-GDYNIA-PUCK WIK WIES- JASTARNIA- - - - - - - - - - - - - Number of tracks was unknown CONFI DENTIAL Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246AO32000670001-2 Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246AO32000670001-2 CON Ft DENTIA L 4 WROCLAW-ZIELONA GORA, - - - - - - Had at least two tracks throughout WARSAW-MALKINA-LAPY-BIALYSTOK,- - - Had at, least two tracks throughout. GDANSK-KOSZALIN, - - - - - - - - - H.d at least two tracks throughout. WARSAW-KUTNO-KONIN-POZNAN, - - - - Had at lestst two tracks throughout. Poland were of standard Western gauge, transloading of coal took place at the Polish-Soviet order at TERESPOL. Polish trains would be run onto a track which was suffi- ciently elevated to permit dumping the coal into Soviet coal cars located on an adjacent lower track of wider gauge. b. Lines Under Construction (1) Possible Special Line for Soviet Trains saw the construction of a concrete overpass approximately five kilo- meters east of SKIERNIEWICE. The overpass intersected the LODZ-WARSAW line at an angle running due east, the overpass was for a special route for Soviet trains from the Soviet Union to East BERLIN which would bypass WARSAW to the south. (2) In WARSAW The portion of the railroad from the intersection of Al. Morchlewakiego and Al. Jerozolimski was underground. c. Soviet Special Train the Soviets ran a special passenger train each da from LEGNICE (commonly known as the place of location of "many Soviet troops) through WROCLAW-POZNAN-WARSAW-TERESPOL and possibly further. Poles were not permitted to travel on this train except in two cars which were attached to the and of the train. This was a sore point because people often complained that when they were travelliitig on this train9 the two cars for Poles were very crowded: whereas the Soviet cars were practically empty. the following lines were electrifieds GDANSK (DANZIG)-GDYNIA. CON FI DENTIAL Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246AO32000670001-2 Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246AO32000670001-2 CONFIDENTIAL 5 WARSAW-SKIERNIEWI CE-(ADZ, the route WARSAW-SKIERNIEWICE-PIOTRKOW TRYB (bypassing LODZ)-CZESTOCHOWA had been electri- fied and that the CZESTOCH WA-KAT MICE route was currently undergoing electrifi- cation. le I Comments Requirements-, Emphasis should be placed on the followings (1) Roads (give width, surface and conditions of both roadbed and shoulders and describe any new or planned construction. the Poles are planning a new circular road from ZERAN around the central (2) Railroads (give gauge, number of tracks, extend of electrification and the alignment of new or proposed construction), CONFI DENTIAL Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246AO32000670001-2 . Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246AO32000670001-2 CONJA DENTIAL 6 Annex A (Sketch of Section of the WARSAW-LODZ Highway 25X1 CON FI DENiTIAL Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246AO32000670001-2 Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246AO32000670001-2 CO NFI DEN T IAL CON FI DENTI A L 7 Annex B Sketch of LODZ-PABIANICE Section of the LODZ-WROCLAW Hi?hweav Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246AO32000670001-2 Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246AO32000670001-2 C,OWF1 JEN'riA L a apex C Sketch of Section of LODZ-PABIANICE N C~dEN TfP~L Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246AO32000670001-2 Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246A032000670001-2 CONFIDENTI A L 9 Annex D G8RLITZ Sketch of JELENIA GOR& BOGA- TINIA Hiabwav ICI L n0LA N'a U ZAWIDai 0 - V ~~( BUJNBERG Miis single tracked Point) Germany and Poland. No one is allowed to enter or get off the y l ~/ rain while it is in UFO d Ect-ios ~ ~_ Asphalt and Stone Brick Highway COJFIDEO IAL Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246A032000670001-2 Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246AO32000670001-2 Sanitized Copy Approved for Release 2010/03/18: CIA-RDP80T00246AO32000670001-2