TRANSSHIPMENT STATION AT LOUBI

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80T00246A032000320001-0
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
4
Document Creation Date: 
December 22, 2016
Document Release Date: 
February 12, 2010
Sequence Number: 
1
Case Number: 
Publication Date: 
January 8, 1957
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80T00246A032000320001-0.pdf133.7 KB
Body: 
Sanitized Copy Approved for Release 2010/02/12 : CIA-RDP80T00246AO32000320001-0 CENTRAL INTELLIGENCE AGENCY This material contains information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title 18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law. COUNTRY Czechoslovakia SUBJECT Transshipment Station at Loubi DATE DISTR. NO. PAGES REQUIREMENT NO. DATE OF INFO. PLACE DATE ACQ. 8 January 1957 X ARMY report on the transshipment station N 50-48, E 14-14), near Decin. X NAVY X A1R FBI jton distribution indicated by "X"; field distribution by AEC F -f Sanitized Copy Approved for Release 2010/02/12 : CIA-RDP80T00246AO32000320001-0 SECRET, Sanitized Copy Approved for Release 2010/02/12 CIA-RDP80T00246AO32000320001-0 Subject Iaubi transhipment station. The railroad transhipment center at loubi is the most important in Czechoslovakia. All cargo is transhipped at Icubi. Construction of this facility began about four years ago and is still in progress. location The loubi station is on the east bank of the Elbe and the installation commences in the south near the road bridge linking Decin with Podmokly (today known as Deci4 II). A kilometers long extends from this river bridge to the river valley and runs to the resident-al area of Iaubi. The pier is at right angles to the water level and rises six meters above the water level. This height is necessary since a pier has been under construction for several years (at a d??~ w s?E~e~aw~ point three kilometers called Dolni Grunt) rises five meters above the water level. Description Several railroad tracks connected to the Decin- Vychod railroad station serve the pier' 13 portal cranes are also lo- _g- ~~=ten V L ~ I Ln ,,,~ tt Sanitized Copy Approved for Release 2010/02/12 : CIA-RDP80T00246AO32000320001-0 Sanitized Copy Approved for Release 2010/02/12 : CIA-RDP80T00246AO32000320001-0 cated on the pier. Four were built in 1955 at the CKD plant in Prague - Vysocany ; ' they have a 25-ton maximum lift capacity. Four others built at the same plant can lift 15 tons ; they also are fairly new. The remaining five portal cranes are old, and are much smaller th n the iM- mentioned eight; theft five a-z+c-k have a five-ton lifting capability. 12 large warehouses and railroad buildings are in the transhipment area. The warehouses vary in size but two of them are 250 meters long (each) and they are situated by the railroad frfght tracks. loading ramps and loading platforms are on both sides of the railroad tracks. The whole area is enclosed by a bar eaire fence, two-meters high. The main entrance is at the southern most point of the port area near the river bridge, while another entrance is located at the northern part of the port area. -q- 25X1 Sanitized Copy Approved for Release 2010/02/12 : CIA-RDP80T00246AO32000320001-0 Sanitized Copy Approved for Release 2010/02/12 : CIA-RDP80T00246AO32000320001-0 Next 1 Page(s) In Document Denied Iq Sanitized Copy Approved for Release 2010/02/12 : CIA-RDP80T00246AO32000320001-0