GHEORGHE GHEORGHIU DEJ STEEL MILL HUNEDOARA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A007200620011-5
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
4
Document Creation Date: 
December 21, 2016
Document Release Date: 
March 12, 2008
Sequence Number: 
11
Case Number: 
Publication Date: 
June 28, 1955
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A007200620011-5.pdf213.08 KB
Body: 
Approved For Release 2008/03/12 : CIA-RDP80-00810A007200620011-5 CENTRAL INTELLIGENCE AGENCY 25X1 This material contains information affecting the National Defense of the United States within the meaning of the Espionage Laws, Title 25X1 18, U.S.C. Secs. 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law. C-0-N.-F-I-D-E-N-T-I-A-L COUNTRY Rumania REPORTI SUBJECT Gheorghe Gheorghiu Dej Steel Mill, DATE DISTR. 28 June 1955 DATE OF INFO. DATE ACQUIRED REFERENCES This is UNEVALUATED Information NO. OF PAGES j . REQUIREMENT NO. RD 1. The Gheorghe Gheorghiu Dej Steel Mill is located north of the city of Hunedoara and is connected to the railroad station, which is east of the mill., by a standard gauge railroad line which is flanked by a Decauville track. The covered area of the mill is surrounded by a wall and covers an area of approximately 1,000 meters by 800. The plant is guarded by a company of special armed guards. They sleep in quarters outside the plant !25X1 although there is a guardhouse on the premises of the plant. 2. At present there is a labor force of 7,000 men, of whom 2,000 work in the blast furnaces. During the winter or whenever there is little demand for agricultural workers, an additional 500 to 1000 peasants are employed in the plant on a temporary basis. There are 300 workers employed in the offices. The wages of the workers vary from a minimum of 380 lei to a maximum of 1,000 lei per month in accordance with the fulfillment of their quotas and technical skill. There are three 8-hours work shifts daily. 3. The ore used by the plant comes exclusively from the Ghelar mines, located about ten kilometers southwest of the plant, and it is trans- ported by means of a Decauville railroad and funicular railroad. Every day scrap iron arrives at the plant, as well as old railroad cars, old artillery pieces, shell casings, and ammunition, which is exploded in a special department. ). The plant is exclusively a steel mill in that it produces only iron and steel in various shapes for mechanical construction plants and heavy in- dustry plants. No machines of any type are manufactured there. Most of the products are shipped to the Resita locomotive plant and to the 23 August plant. All the products are loaded on freight trains within the premises of the plant. 5. The plant is divided into five sections: blast furnaces, rolling mills, steel works, maintenance section and electric shops. A sixth section is under construction and almost completed. (Note: Washington distribution indicated by "X"; Field distribution by "#".i Approved For Release 2008/03/12 : CIA-RDP80-00810A007200620011-5 I~ FB AEC _._--L---- Approved For Release 2008/03/12 : CIA-RDP80-0081 OA007200620011-5 a. Blast furnaces s The ort_: arriving from Ghelar is brought directly to the burners by Decauvil.le cars where they are automatically unloaded at 24 different burners. Each burner is manned by two workers, one from above to handle the loading and unloading of the ure, and the other from below to take care of the fir. The burners are in continuous operation for 24 hours a day and are kept in cperation by both civilian workers and soldiers from labor detachments. The ore is then transported to the six blast furnaces which are 20 meters high and 8 meters in circumference at the base. Each blast furnace is manned by a squad of of 7 to 10 men. Only one of the furnaces is electric and it operates more efficiently and faster than the others. Of the other five furnaces., only four are in operation; the fifth one has been out of operation since 19539 allegedly as the result of sabotage. The electric blast furnace is the only new piece of equipment that has been added to the plant. It was put up in 1951"1952 by the Soviets, while the remaining installations were built by German engineers prior to 1.944. Each casting of the electric blast furnace varies from 60 to 80 tons in accordance with the quality of the ore,, while the casting of the other furnaces varies from 20 to 25 tons, b. The foundry is a large building measuring 50 by 30 meters and 20 meters high, where the casting is poured into conical moulds called shells which are removed when the casting has solified. The resulting blocks, which weigh from 2.5 tons to 3 tons, are then transported by overhead cranes directly to the steel works. c. The steel works are located in a building 300 by 120 meters, and 40 meters high.. There are five Siemens Martin furnaces which utilize both the pig iron from the blast furnaces as well as the scrap iron which is collected from all over Rumania. On the average, each furnace produces about 60 tons of steel every eight hours. d. Theiron or steel arrives at the rolling mills as soon as they are removed from the molds or else in slabs one-half meter thick on small. freight cars. The blocks are then placed inside "deep" furnaces from which they are immediately placed under one of the three rollers. Each block is rolled ten minutes, and according to the quality of the material and the skill of the workers, 40 to 60 blocks can be rolled during a period of eight hours. There are 1,500 workers in the rolling mills. e. The maintenance section is made up of two buildings; one 50 by 20 meters and and the other 70 by 30 meters. Repairs on equipment used by the plant are,,carried out in this section* f. Electric shop. This is a four-story building, approximately 30 by 20 meters, in which 80 workers are employed who keep all electrical in- stallations and the power plant in operation. The power plant utilizes a waterfall located near the plant and has a capacity of 5,000 kilowatts. The waterfall is also used for other needs of the plant. The power plant furnishes 3-phase alternating current at 380 volts for electrical machinery, 220 volts for the lighting system and 50 volts for hand tools. In August 1951 construction began on a thermoelectric plant. g. The sixth section of the Gheorghiu Dej plant will began operating during 1955. The purpose of the new section is to utilize the by-products from the casting of the iron ore and of the coke which can be used in other industries. Approved For Release 2008/03/12 : CIA-RDP80-0081 OA007200620011-5 Approved For Release 2008/03/12 : CIA-RDP80-0081 OA007200620011-5 Legend for attached sketch of the Gheorghe Gheorghiu. Dej Steel Plant. 1 - Main entrance (for workers and materials) 2 - Pbwer plant 3 - Burners 4 - Blast furnace No. 1 5 - Blast furnace No. 2 6 - Blast furnace No. 3 7 - Blast furnace No. 4 8 ?- Blast furnace No. 5 9 - Blast furnace No. 6 10 - Iron foundry 11 - Maintenance section 12 - Second entrance 13 - Maintenance section 14 - Electrical shops 15 - New section under construction 16 - Iron foundry 17 - Main office 18 - Entrance for administrative personnel 19 - Rolling mills 20 - Steel works 21.-y Thermoelectric plant under construction 22 - Hunedoara railroad station 23 - Railroad line leading to Ghelar mines Approved For Release 2008/03/12 : CIA-RDP80-0081 OA007200620011-5 Approved For Release 2008/03/12 : CIA-RDP80-0081 OA007200620011-5 Gheorghe Gheorghiu Dej Steel Mill, Hunedoara 25X1 25X1. Approved For Release 2008/03/12 : CIA-RDP80-0081 OA007200620011-5