AIRFIELDS NEAR ALLENSTEIN

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A006000550011-6
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 21, 2016
Sequence Number: 
11
Case Number: 
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A006000550011-6.pdf96.67 KB
Body: 
Approved For Release 2008/04/14: CIA-RDP80-0081 OA006000550011-6 CLASSIFICATION1 COUNTRY Pot TOPIC_ Airfields near Allensteia. EVALUATION__.~ DATE OF CONTENT LACE OBTAINED I DATE OBTAINED REFERENCES PAGES 2 ENCLOSURES (NO. & TYPE) REMARKS ,,.REPORT -DATE PREPARED 26 January 1955 This is UNEVALUATED Information 1. In July 1954, the airfield west-southwest of Allenstein (53?47tN/20?29'E) had a.sodded landing field. Two or 3 small, former German, hangars were available. No construction work was seen being done at the field prior to July 1954. On weekends, the field was used by the Liga Lotnicza, the Polish spouting fly&ng association, on weekdays the field was used as training 25X1 grounds by Polish military personnel stationed ij Allenstein. A few biplanes and gl.idara were parked in the hangars9 2. The airfield nselt 37+N/20?2l1E) was a former German installation an8 th a concrete runway. The field had not been used o#tr he war and was unoccupied and unguarded. In early 1953 signboard posted around the field indicating that the area was a mi $ttN - {rvation and off limits. Roads leading to the field were blocked by barbed-wire fences. Prior to the summer o5 1953, there were no indications for reconstruction work at the field. 3. According to construction w an airfield was under construction near MarcinkowO r 42tN/20?40tE). In July 1954, construction world on for 2 or 3 years was not yet completed. Many farmers living southea~t of Allenstein had to supply horses and wagons for construction work. 4. In 1952 and 1953 construction work was under way on the airfield near Wormditt (54?07tN/20?08'E)0 Fifteen to 20 trucks were dispatched daily to the construction site from the branch agency of the State Motor Traffic Enterprises (PKS) at Wormditt. Farmers from Guttstadt (53?59TN/20?24tE) along,, with their horses and wagons were also employed for the work at the field. Personnel of the PKS branch agency in A1l,enstein were inolin1d to leave their jobs and work at the field because of better pay there. L_JComment- The information on the Allenstei 4VmkW25X1 1. CLASSIFICATION CONFIDENTIA 25X1 M,CITfl,o?T,r)rl, Approved For Release 2008/04/14: CIA-RDP80-0081 OA006000550011-6 Approved For Release 2008/04/14: CIA-RDP80-0081 OA006000550011-6 credible. The tiltil fiat ~# W~ go worm of loin !r&*M of Soldiers, prev1eft1 , "~ .LWrOSt`'~ was reported previously. ___L_Comment. The information that the former German airfield at Grieel.ienen was not utilized until 1952 was received previously* The field had two runways, eac about 1,100 meters long. Comment. The construction of an airfield near Marcinkowo was reported previously. , Contrary to referenced report, the present report indicates that construction work had already been started 2 to 3 years before. Comment. The information is believed credible. 25X1 25X1 Approved For Release 2008/04/14: CIA-RDP80-0081 OA006000550011-6