ROAD BRIDGES OVER THE NEISSE RIVER AT MUSKAU AND GOERLITZ
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A005800350009-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 21, 2016
Document Release Date:
June 24, 2008
Sequence Number:
9
Case Number:
Publication Date:
March 17, 1955
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80-00810A005800350009-4.pdf | 105.62 KB |
Body:
Approved For Release 2008/06/24: CIA-RDP80-00810A005800350009-4
CENTRAL INTELLIGENCE AGENCY REPORT
INFORMATION REPORT CD NO.
COUN1RY Fast Germany
SUBJECT Road Bridges over the Neisse River
at Muakau and Gosrlits
PLACE
ACQUIRED
DATE OF
INFO.
DATE DISTR 17 March 1955
NO OF PAGES
NO. OF ENCLS.
LUSTED BELOW
SUPPLEMENT TO
REPORT
THIS IS UNEVALUATED INFORMATION
IS OM==" usORM1Ior st-teiM,xa RnnoU . RRrRxu
'MIS of Ton UXITOIR TOR OR*RIOB Of 1 fi ,s. O I04 OUI ci
#1Oi na. OF TOO U. S. COM. RS AORMRRO? ITS TMO~1NOIO
A700 OF ITS OORTRRTS p oe RRCUI-T my ill OOAOTMOOiiRR +RRSOR
If IIwrnirTRO ST LAW TOR RRpooOOODOR OF TWA ,oRO IS sROOIRITRO.
to i.ovember 1954, it was observed that the scaffolds re,uired for the 25X1
concreting of the road bridge ove? the Neisse River aT i'luskau were
30 percent completed. It appears that the bridge will have three spans
and two river piers. Concreting work on the Polish side of the rive,,
ha.d already been started. Construction work seemed to be executed
exclusively by Polish firms and Polish workers.
, serviceab::e road bridge was observed about 500 meters do-instrefm from t be
V-ilroad viaduct ovir the Neisse River at Goerlitz. 2
Comment. The destroyed road bridges over the Neisse River are
j hedu1.ed to be reconstructed by late 1955? 25X1
1:11 '-hese bridges, except the bridge at Frankfurt, Oders are being built
by the Poles. The bridge at '.uskau is being reconstruct d as a reinforced
concrete structure.
Comment. The official name of the road bridge over t%e 1"eisse River
,-.t Goerlitz is "Bruecke der Freundschaft" (Bridge of Friendship). The 25X1
bridge, a steel girder structure, was completed in December 1952.
ri NSStr1CAT10N 9FCRFT
STATE
25X1
.(
Approved For Release 2008/06/24: CIA-RDP80-00810A005800350009-4
Approved For Release 2008/06/24: CIA-RDP80-0081 OA005800350009-4
CLASSIFICATION
SECRET
CENTRAL INTELLIGENCE AGENCY REPORT
INFOWATION REPORT CD NO.
COUNTRY
SUBJECT
PLACE
ACQUIRED
DATE OF
INFO.
East Germany/ ~. ?nc?
Road Bridges over the Neisse River
at Muskau and Goerlitz
SUPPLEMENT TO
REPORT NO.
THIS DOCUMENT CONTAINS INFORMATION AFPECTINS THE NATIONAL DSFEIBI
OF THE UNITED STATES. WITHIN TNN MRANI" OF TITLM 16. SECTIONS 719
AND 714. OF THE U. S. COON. AS AMENDED. ITS TRANSMISSION 0R RITEL-
ATION OF ITS CONTENTS TO ON RECNIPT DT AN NNANTHORIZIID PERSON
IS PRONINITSD ST LAW TNN REPRODUCTION OF TIltS FORM IS PSOHINITID.
THIS IS UNEVALUATED INFORMATION
1. In November 1954, it was observed that the scaffolds reuired for the 25X1
concreting of the road b he Neisse River at Muskau were
80 percent completed. It at the bridge will have three spans
and two river piers. Con on the Polish side of the river
had already been started. onstruction work seemed to be executed
exclusively by Polish firms and Polish workers. 1
2. A serviceable road bridge was observed about 500 meters downstream from the
railroad viaduct over the Neisse River at Goerlitz. 2 25X1
1. F---]Comment. The destroyed road bridges ove are
scheduled to be reconstructed by late 1955. 25X1
All these bridges, except the bridge at Frank ------
by the Poles. The bridge at Muskau is being reconstructed as a reinforced
concrete structure.
2. 0 Comment. The official name of the road bridge over the Neisse River
at Goerlitz is "Bruecke der Freundschaft11 (Bridge of Friendship). The
bridge, a steel girder structure, was completed in December 1952. 25X1
x wAVr x MM
sWr
A MY AIR C Approved For
DATE DISTR. 17 March 1955
NO. OF PAGES 1 25X1
NO. OF ENCLS.
(LISTED BELOW)