THE GIURGIU-RUSE BRIDGE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A004301050005-3
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 19, 2016
Document Release Date: 
August 29, 2005
Sequence Number: 
5
Case Number: 
Publication Date: 
June 17, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A004301050005-3.pdf82.81 KB
Body: 
Approved For Release 2005/11/23 : CIA-RDP80-0081OA004301050005-3 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT COUNTRY Bulgaria SUBJECT The Giurgiu-Ruse Bridge 25X1 DATE OF INFO. 25X1 This Document contains information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. REPORT NO. DATE DISTR. NO. OF PAGES REQUIREMENT NO. REFERENCES 17 June 1954 1. Construction of the (iurgiu Ruse Bridge across the Danube is proceeding from both the Bulgarian and Rumanian banks of the river. The bridge is being con- structed east of Ruse at the east exit of the railroad bridge at Ruse and goes to the terminal point of the rail line,leading from Giurgiu along the Danubels bank. It leads precisely to the point where the ferries which transported the railroad care tied up until recently. 2. The bridge is of multiple level construction or "Kaeeetten" iron type. The lower level carries a double-track railway line and above that is a motor vehicle road eight meters in width. The length of the bridge, from shore piling to shore piling is 1,210 meters. In addition to the two shore pilings the bridge also has three base pilings. 3. The arch construction between the shore pilings and the outer base pilings has already been erected. (The arches on the Rumanian aide are supplied by the Resita factory of the Soviet-Rumanian Metal V1orks and those on the Bulgarian side are supplied by Soviet and Hungarian bridge. building firms0) The assembly and riveting of these parts is nearly completed. 4. From the Bulgarian side, twin tracks lead from the Ruse railroad station on two embankments to the site of the work. This means that these tracks will mark the position of the ultimate rail line. The ]a ying of the highway running east from'Ruse in the direction of the bridgehead on the Bulgarian side is also under way. This highway will first be built with an embankment and from the embankment there will be., over the row of tracks of the Ruse Railroad station, a highway bridge of reinforced concrete construction approximately six meters above the rails on the bridge at the bridgehead. SECRET. 25X1 25X1'.! 25X1 25X1 (Note: Washington Distribution Indicated By "X"; Field Distribution By " ".) Approved For Release 200/1 #/23 : CIA-RDP80-0081 OA004301050005-3 Approved For Release 2005/11/23 : CIA-RDP80-0081OA004301050005-3 SECRET) Approximately 80 Soviet specialists have helped in the construction of the bridge on the Bulgarian side. These specialists were., however, called away suddenly and unexpectedly in late autumn of 1953 in order to work on another Danube bridge. On the Rumanian side near the bridge site., a freight station is being built and between the rail lines of Giurgiu, as well as between the now completed freight station, a second set of twin tracks is being laid. 25X1 25X1 25X1 Approved For Release 2005/11/23 : CIA-RDP80-0081OA004301050005-3