NEW POWER DISTRIBUTION CONTROL STATIONS AT LITOMYSL
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A004101000010-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
February 1, 2010
Sequence Number:
10
Case Number:
Publication Date:
May 31, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80-00810A004101000010-4.pdf | 106.17 KB |
Body:
Sanitized Copy Approved for Release 2010/02/01 : CIA-RDP80-0081 OA004101000010-4
CENTRAL INTELLIGENCE AGENCY
INFORMATION REPORT
This Document contains Information affecting the Na-
tional Defense of the United States, within the mean-
ing of Title 18, Sections 793 and 794, of the U.S. Code, as
amended. Its transmission or revelation of Its contents
to or receipt by an unauthorized person is prohibited
by law. The reproduction of this form is prohibited.
SECRET/CONTROL.U.S.OFFICIALS ONLY
New Power Distribution Control
Stations at Litomysl
REPORT
DATE DISTR.
NO. OF PAGES
REQUIREMENT NO. RD
REFERENCES
THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE.
THE APPRAISAL OF CONTENT IS TENTATIVE.
(FOR KEY SEE REVERSE)
1. Two.new distribution--control centers are in one 2 -story rbilding,located 150 meters
east of the cemetery on the eastern edge of Litomysl. The area is enclosed in
the north and east by a wall 22 meters highs and in the south and west by a wire
fence,, 2 meters highs
2. The 35 kwh distribution-control station is divided into 10 cubicles, walled up
with "Kalorifit" (probably the trade-name of some insulating materials) and
covered with~,plaster. There is an oil transformer, 359000-'jvolt, which was supplied
by the CKD (Ceskomoravska-Kolben_Danek)Lin April 1953. Control equipment was
supplied by the Veltechna plant at Cakovice in May 1953. The 6-kwh.4distributton-
control station has 24 cubicles. Its equipment was supplied by CKD?-in April 1953.
Two oil transformers were supplied by Skoda-Lin July 1953.
3. The station employs six workers who are on duty in three shifts.
4. Current comes in over a 359000- colt line from the power plant at deska Trebova.
Officially it is said that the current will be distributed in the town of Litomyysl.
This is, however, improbable, for a power-line leads from the distribution station
to the village of Pohodli, some 6 km. away. Some 1500 meters east of this village
is a military unit and installations,, guarded by soldiers with purple lapels.
In this'unit there is supposed to be a W/T transmitter.
5.
Praha).,
the Electric Assembly. Works Elektromonta rli zavc
are now building one 100-kwh distributions-contr
center one for kwh and another one of unknown capacity. to"Fun
there have a special authorization from the central plant, giving
identification. a photogranh. grid an nni ni on from +.hn rAr1rsA rior~ari-mont.
SECRET/CONTROL.U0S. OFFICIALS ONLY
STATE X ARMY X
NAVY X AIR X1 FBI
(Note: Washington Distribution Indicated By "X'; Find Distribution by
31 May 195l1.
`- 25X1
r1r
25X1
Sanitized Copy Approved for Release 2010/02/01 : CIA-RDP80-0081 OA004101000010-4
Sanitized Copy Approved for Release 2010/02/01 : CIA-RDP80-00810A004101000010-4
SECRET/CONTROL-U.SOOFFICIALS ONLY
There are two distribution-control 25X1
stations an one under construct ono beside these there are two quite large
buildings, exact dimensions not known. Workers are not allowed to go from one
building to another without authorization.
Sketch of Distribution Station at Litonavsl.
Scale-1:500
2 tr nsfo ers
b-wh. distribution-control
station-24 cubicles
2
transformer,
35 kwh
1
b I 6 35-rh distri-
corridor
bution-control
offices station, 10
2 4 cubicles
T r-
3
ontrol
~quipmzent