POWER INSTALLATIONS CONSTRUCTION PROGRAM, 1954-1955

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A004100920010-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
February 2, 2010
Sequence Number: 
10
Case Number: 
Publication Date: 
May 20, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A004100920010-4.pdf96.3 KB
Body: 
Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100920010-4 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT This Document contains information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.S. Code, as amefiied. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form is prohibited. SECRET/CONTROL - UeS.-,n'OFFICIALS.ONLY REPORT Power Installations Construction DATE DISTR. 20 May 1954 Program, 195i-1955 NO. OF PAGES REQUIREMENT 25X1 25X1 REFERENCES THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) 1. The Power Installations Construction Program for 195+-55 includes the items listed belowol These projects have no priority, and it is believed at the Energieprojek- tiexuug;;Departme,at(w i,ich is responsible for the detailed planning and supervision of the work) that only Trattendorf I, Zschornewitz andZittau will be partly in operation by 31 December 1955. The remaining projects are expected to be incorporated in the 1956 and 1957 program. 2, as Trattendorf I power station. Installation of 1 x 25.MW back-pressure turbine Installation of 1 x 50 MW turbine T. Installation of 2 x 160 t/h boilers Necessary tales, switches and transformers. b. 'Zschornewitz power station. Installation of 2 x 25 MW turbines Installation of 4 x 160 t/h boilers Necessary water pipes and water filters Necessary cables, switchbbards,, and transformers. c. Zittau power station extensions. Installation of 2 x 25't/h boilers Installation of J-`x 5 MW tapped turbine (bleeding. connection) Installation of 1 x 2 MW back-pressure turbine (Gegendrizck) Necessary switches Extensions,to boiler and turbine houses. SECRET/CONTROL - U.S. OFFICIALS ONLY FBI AEC ORR EV x (Note. Wo?hinaton Distributinn Indirnted By "X"; Field fl.+.4bution By "f"' Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100920010-4 Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100920010-4 SECRET/CONTROL - U.S. OFFICIALS ONLY d. Pirna power station. Installation of 5 x 80 t/h boiler Installation of 5 x 12.5 MW turbines Construction of turbine house and foundations for turbines. e. Karl-Marx-$tadt (Muellerstrasse) power station extensions. Installation of 4 x 80 t/h boilers Installation of 2 x 25 MW or 1 x 31.5 MW turbines Necessary switches and extensions to boiler house Necessary extensions to turbine house, once the type of turbine has been decided. f. Berzdorf power station. Installation of 12 x 160 t/h boilers Installation of 6 x 25 MW back pressure turbines Installation of 6 x 50 MW turbines (J. New construction of boiler and turbine houses. It has been decided to alter or modify the' following, but no plans .c:. have yet been drawn up! Extensions to Dresden power station Extensions to Dresden-Johannstadt power station Extensions to Karl-Marx-Stadt old power station, Generators for pump-fed power station Amalienhoehe? 1. Comment:) Isome'of the plans are very ambitious (for example, Berzdorf) and.completion will drag on to 1956 - 1957, if not later. Comment: Possibly Amalienhof. SECRET/CONTROL - U.S. OFFICIALS ONLY 25X1 25X1 Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100920010-4