POWER INSTALLATIONS CONSTRUCTION PROGRAM, 1954-1955
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A004100920010-4
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
February 2, 2010
Sequence Number:
10
Case Number:
Publication Date:
May 20, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 96.3 KB |
Body:
Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100920010-4
CENTRAL INTELLIGENCE AGENCY
INFORMATION REPORT
This Document contains information affecting the Na-
tional Defense of the United States, within the mean-
ing of Title 18, Sections 793 and 794, of the U.S. Code, as
amefiied. Its transmission or revelation of its contents
to or receipt by an unauthorized person is prohibited
by law. The reproduction of this form is prohibited.
SECRET/CONTROL - UeS.-,n'OFFICIALS.ONLY
REPORT
Power Installations Construction DATE DISTR. 20 May 1954
Program, 195i-1955
NO. OF PAGES
REQUIREMENT
25X1
25X1
REFERENCES
THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE.
THE APPRAISAL OF CONTENT IS TENTATIVE.
(FOR KEY SEE REVERSE)
1. The Power Installations Construction Program for 195+-55 includes the items listed
belowol These projects have no priority, and it is believed at the Energieprojek-
tiexuug;;Departme,at(w i,ich is responsible for the detailed planning and supervision
of the work) that only Trattendorf I, Zschornewitz andZittau will be partly in
operation by 31 December 1955. The remaining projects are expected to be incorporated
in the 1956 and 1957 program.
2, as Trattendorf I power station.
Installation of 1 x 25.MW back-pressure turbine
Installation of 1 x 50 MW turbine T.
Installation of 2 x 160 t/h boilers
Necessary tales, switches and transformers.
b. 'Zschornewitz power station.
Installation of 2 x 25 MW turbines
Installation of 4 x 160 t/h boilers
Necessary water pipes and water filters
Necessary cables, switchbbards,, and transformers.
c. Zittau power station extensions.
Installation of 2 x 25't/h boilers
Installation of J-`x 5 MW tapped turbine (bleeding. connection)
Installation of 1 x 2 MW back-pressure turbine (Gegendrizck)
Necessary switches
Extensions,to boiler and turbine houses.
SECRET/CONTROL - U.S. OFFICIALS ONLY
FBI AEC ORR EV x
(Note. Wo?hinaton Distributinn Indirnted By "X"; Field fl.+.4bution By "f"'
Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100920010-4
Sanitized Copy Approved for Release 2010/02/02 : CIA-RDP80-0081 OA004100920010-4
SECRET/CONTROL - U.S. OFFICIALS ONLY
d. Pirna power station.
Installation of 5 x 80 t/h boiler
Installation of 5 x 12.5 MW turbines
Construction of turbine house and foundations for turbines.
e. Karl-Marx-$tadt (Muellerstrasse) power station extensions.
Installation of 4 x 80 t/h boilers
Installation of 2 x 25 MW or 1 x 31.5 MW turbines
Necessary switches and extensions to boiler house
Necessary extensions to turbine house, once the type of turbine
has been decided.
f. Berzdorf power station.
Installation of 12 x 160 t/h boilers
Installation of 6 x 25 MW back pressure turbines
Installation of 6 x 50 MW turbines (J.
New construction of boiler and turbine houses.
It has been decided to alter or modify the' following, but no plans
.c:. have yet been drawn up!
Extensions to Dresden power station
Extensions to Dresden-Johannstadt power station
Extensions to Karl-Marx-Stadt old power station,
Generators for pump-fed power station Amalienhoehe?
1. Comment:) Isome'of the plans are very ambitious
(for example, Berzdorf) and.completion will drag on to 1956 - 1957, if not
later.
Comment: Possibly Amalienhof.