STATE CONSTRUCTION ENTERPRISE
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A003300510009-0
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
January 8, 2010
Sequence Number:
9
Case Number:
Publication Date:
January 13, 1954
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 156.28 KB |
Body:
Sanitized Copy Approved for Release 2010/01/08: CIA-RDP80-0081OA003300510009-0
CENTRAL. INTELLIGENCE AGENCY
INFORMATION REPORT
This Document contains information affecting the Na-
tional Defense of the United States, within the mean-
ing of Title 18, Sections 793 and 794, of the U.S. Code, as
amended. Its transmission or revelation of its contents
to or receipt by an unauthorized person is prohibited
by law. The reproduction of this form is prohibited.
SECRET/CONTROL - U.S e OFFICIALS ONLY
COUNTRY Bulgaria
SUBJECT State Coratruotion Enterprise
DATE OF INFO.
PLACE ACQUIRED
REPORT
DATE DISTR.
NO. OF PAGES
REQUIREMENT
REFERENCES
25X1
THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE.
THE APPRAISAL OP CONTENT IS TENTATIVE.
(FOR KEY SEE REVERSE)
25X1
1. The headquarters of the Durzhavno Stroitelno Obedinenie (State Construction Enter-
prise)9 subordinate to the Ministry of Construction, is located at Sofia. The
mission of this agency is to provide for the construction of public buildings,
schools, hospitals, etc. Bach political-administrative subdivision of the country
(b-tg) has a directorate.
Burgas Directorate
2. The okrug directorate of the State Construction Enterprie.e in Burgas is located
at Noe 14 Atanas Slavov Street. It employs approximately 100 persons, including
technical directors and workers. The number of workers subordinate to the okrug
directorate veries according to the season; in the season of greatest actirity
(summer-autumn) a maximum of 400 to 500 workers are employed.
3, Construction materials are furnished by the "Predpriatie Durzhavni Dostavki"
(State Supply Agency) with headquarters in Sofia and directorates in each okrug
center. The headquarters of the Burgas Directory are at No. 140 IX September Street.
This organization assigns materials only upon authorization of the Central
Directorate at Sofia.
14. ..Work carried out by the Burgas unit in the period 1919 to June 1953 has been
as follows s
a. Houses for workers. in the zone north of the Georgi Dimitrov Quarter of Burgas;
a development consisting of 25 or 30 two-story buildings, with four apartments
per building;
b. A polyclinic near the State Hospital in the zone east of the city of Burgas6
c. A skin and venereal diseases department in the Aytos Hospital;
d. The dompletion,in 19S3, of a gymnasivm'(school) at Karnobat;
SECRET/CONTROL - U.S. OFFICIALS ONLY
STATE IX IARMY X NAVY IX IAIR X J FBI AEC
1.3 January 1954
2
Sanitized Copy Approved for Release 2010/01/08: CIA-RDP80-0081OA003300510009-0
Sanitized Copy Approved for Release 2010/01/08: CIA-RDP80-0081OA003300510009-0
SECRET/CONTROL - U.S. OFFICIALS ONLY
e. New buildings for a soap factory located 500-600 meters northwest of the
Burgas railroad station;
f. A new factory for the production of electrical materials, known as "Kabelna
Fabrika Vasil Kolarov," located in the northwest outskirts of Burgas, approxi-
mately 2,9500 meters from the city center and about 500 meters from the railroad
station, this work was started in 1950 and completed at the end of 1952;
g. Enlargement of the old electric light bulb factory, formerly known as the
"Belfa Factory8" of Sliven; this work was completed in 1952;
h. An unknown iixamber of civilian houses at Sliven;
i. Grain silos, capacity 1,000-1,504 tons, at the Chernograd railroad station
leted
k
was comp
(locality about midway between Aytos and Karnobat); this wor
in 1952
Grain silos, capacity 2,500 tons, located 15 to 20 kilometers west of Karnobat;
this work was completed in 1952;
k. Two grain storeho.a.ses, capacity not known but stated to be greater than 2,000
the
mill i
n
tons each, constructed in the vicinity of the city flour
industrial area two or three kilometers northwest of the city center of Burga,,,
this work was completed in 1952;
A grain storehouse,, pacity appr^o cimately 2,000 tons, in the railroad Statio;
enolosur^e at, Aybos; this installation was completed in 1952;
m. A grain storehouse, rapacity approximately 2,000 tons, near the railroad
station at Kar?nohat; this installation was completed in 19523
n. A coal depot, constructed In 1951 in the western outskirts of Burgas about
1,500 meters from the city center; this depot is a wood-and-tile covered Shed
about I.0 by 12 meters in size, supported by masonry column;; it has a spur
line connected with the port railroad line; and
o. Work on a large new hospital at Karnobat was started in 19503 an estimated
500,000,000 leva (old currency).was appropriated for the completion of the
project, but work was suspended in 1950, allegedly for economic reasons.
SECRET/CONTROL - U.S. OFFICIALS ONLY
Sanitized Copy Approved for Release 2010/01/08: CIA-RDP80-0081OA003300510009-0