BERLIN TECHNICAL BUREAU (BTB) ORDERS TO BE COMPLETED PRIOR TO ITE RETURN TO GERMAN MANAGEMENT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A002500920001-5
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
4
Document Creation Date:
December 27, 2016
Document Release Date:
May 7, 2013
Sequence Number:
1
Case Number:
Publication Date:
October 19, 1953
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80-00810A002500920001-5.pdf | 191.02 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2013/05/07: CIA-RDP80-00810A002500920001-5
(::01)NTRY
SUBJECT
PLACE
ACQUIRED
DATE OF
fNFO.
;11,`SSIFiCATIONSF,CRET
SECUN1T/ INFORMATION
CENTRAL INTELLIGENCE AGENCY REPORT
N FOR MAT iON REPORT
EEst Germamv
Berlin Technical Bureau (BTB) Orders to be
Completed Prior to Its Return to German
Banagement
T4ii:53 Met:huh-I' CORV;itt 5 %Usk's:tumor! AFCELI1Ni5 THE NATten`l. DIECErLE,a
7?11 ROMPS STATEE. 114 TMIXAMINA OP TITLE IS. SISOTIONS 793
435 194. OP rrz. s. :109Z.A RDINDED, ITS TRANSMISSION OR EMIL.
tmt, iT% CONTENT: TO 03 RECEIV. AC IINALOTIOZZP.O PERSON
*OVISITTO 0.41.1 TdE RRPRODLCTIO2 OP THIS CORM IS PHONIOITRO.
MEIMMAM1111
CD
50X1 -HUM
DATE DISTR, 1.9 Oetob3r 1953
NO. OF PAGES 2
NO. OF ENCLS.
IUSTED BELOW)
SUPPLEMENT TO 50X1 -HUM
REPORT NO
THIS !S UNEVALUATED INFORMATION
50X1 -HUM
The change in the rriorities of Berliner Technisches Buero (BTB) announced by
its director Smolikev (Thu) in late July 19..53 'was caused by the aussian
7lan to transfer all remaining SAC's to Geman possecsion at the beginning
1!".'54. It is now obvious that Smolikov must have been arprised in advance
of this Tan, Which was mFde public several weeks later. Also as a consequence
of the transfer plan., Smolikov cancelled his leave to Russia,w'eich he hs had
rianned for some time, On 25 August 19535molikov eosin gave strict orders
that only the projects listed below are to be worked on and to be completed in
the fourth quarter 3_953; no other work is to be carried out,and no other order
is to be accepted, The projects on the ultimate priority list to be completed
before the transfer of the LAO 's into Gorman possession are as...follows:
reject lA11 bevelorment
of strain in autonobile par
bo :reject 2/5M - Develosment
and temperature in motors,
shaft rotation movement0
of a universal stand for the investigation
ts.
of instruments for the measurins: of pressure
including an instrument for measuring carbon.
c Iroject 3/61: - Development of a single-cylinder universal tect stand with
temrerature control installation. Smolikov specified that rart nD" of
this project, concerning the construction of the temperature control
installation, could be drorped if the construction could not be
completed by the end of 1953.
do Troject 5/31: - Development of test stands for Otto, Diesel and gasoline
motors. The following parts of this project were declared urgent and
are to be ccmpleted by the end of 1951?
A, Ts stand for 200 HP Otto motoro
B, TLst stand for 200 HP :iieeel motor.
C, Test stand for 200 HP gasoline motoro
sEcRET
CLISSIFICATION
Fain -I:--1
PV4.-
RISRB
DISTRIBUTION
012;.. j FBI
ORR Pv 70SIri?
50X1 -HUM
Declassified in Part - Sanitized Copy Approved for Release 2013/05/07: CIA-RDP80-00810A002500920001-5
50X1 -HUM
Declassified in Part - Sanitized Copy Approved for Release 2013/05/07: CIA-RDP80-00810A002500920001-5
Declassified in Part - Sanitized Copy Approved for Release 2013/05/07: CIA-RDP80-00810A002500920001-5
Declassified in Part - Sanitized Copy Approved for Release 2013/05/07: CIA-RDP80-00810A002500920001-5
- 2
50X1-HUM
Froject 34/37M - Development of an installation for instantaneous teelrerature
measurement in the cyJinder of a combustion motor.
f, Iroject .35/29M Develorment of an installation for the determinatjon ef
instantaneous temperatures in rapid succession in the cylinuer of a
combustion motor0
co rroject V3311: - Development of a stand for the determination of Air
consumption by a motor.
2. In order to be able to ce:nplete the above-menticned projects by the end of
1253, two rurchasers from BTB have been assigned to visit all delivery firols and
make sere that all needed materials are delivered on schedule. In adoition,
Dr, Rudolf (fnu)jof USIG headquarters in Berlin-.eissensee)and aerpchen (flu).
of the Surply Department of Etta Transmasch Readauarters, Leipzig, have been
relieved by U513 from their present dutiesdand have been assigned the enclesive
job of visiting the delivery firms of the technical-scientific offices (Buerec)
of ;ALID'sland of attempting to shorten the.. terms of delivery of materials to the
offices(
3. rt "A" of project 2/5M concerns the measurement of temperature with the aid
of spectral lines in oreer to carry out this part, BTD bean in early 1()53 the
develorment of a srectrocraphs after the Zeiss firm in Jena had declinedsbecauee
of a lack of adequate material; to construct a spectrograph for BTB. The
device, which is about two meters long and 83 centimeters high, has now been
completed at 13Th and is in the process of being adjusted. It be used in
conjunction with a photometer (Lchnellphotometer) and a projection devices
both delivered by Zeiss Jena, for the evaluation of spectral. liner. Two more
spectrorraphs have been built at DTD; they will also be used for tenircratt.re
measurement with sTectral lines in projects 3107M ane 15/209t.0
4. In August 19%0 crankshaft test stand for. torsional and deflectional vibrations
(Kurbelwellenrruefstand fuer Torsions-und Diegeschwingung) arrived from
Dchopper, Leipzig2 This stand, Which is to be used for project 1/4M, is now
being mounted,
5. .ith the increased emphasis placed on carrying out the above-mentioned procct:7
and in view of the increased efforts to obtain on schedule all rartc and mater-
ials needed, it is believed that the projects will be completed by the end of
1953. The personnel of DTD also believe that they will continue to work for
the Russians after the transfer of SAG Transmasch to German possession.
This belief is based mainly on the fact that other technical oftices of the nAC,c
which were transferred to German rossessiol in 1952.;have ccntinued to work for '
the aussianc. The Ghennitz scientific-technical office of .-.AG Avtovelo, fo."
exam-le, continued to carry out aussian orders after it was transferreci to tae
people's7owned industry Among the orders now being carried out by this office
for the aussians is the development of a tort stand for as turbines,
Sc La
Declassified in Part - Sanitized Copy Approved for Release 2013/05/07 : CIA-RDP80-00810A002500920001-5
50X1 -HUM
Declassified in Part - Sanitized Copy Approved for Release 2013/05/07: CIA-RDP80-00810A002500920001-5
Declassified in Part - Sanitized Copy Approved for Release 2013/05/07: CIA-RDP80-00810A002500920001-5