GENERAL MILITARY INFORMATION

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A002100620002-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 16, 2016
Document Release Date: 
June 13, 2005
Sequence Number: 
2
Case Number: 
Publication Date: 
July 20, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A002100620002-8.pdf120.83 KB
Body: 
Approw4a#6&46 CC*TRY..,_._ 25X1 TOPIC General Irilitary Information 25X1 EVALUATION CWE OF CONTENT DATE OBTAINE? REFERENCES ..._. -DATE PREPARED 2 PAGES _._ENCLOSURES (NO. & TYPE) REMARKS 25X1 PLACE OBTAINED, 25X1 25X1 20 July 1953 25X1 25X1 infantry unit under the command of Colonel 25X1 n onareul left the Adolf Hitler Kaserne and moved to the F ritzsch Kaserne in Schwerin. Major Polavsz (fnu ; who arrived from Hungary ' _ 25X1 bel onged to this unit? 25X1 2. the co nstruction of the ?aarrae s ins a ono in c wer n- uc olz which had b een planned for 1953 was postponedo1 - 25X1 3 1 1 2 infantry units which came om the area of Le ipzig were. 25X1 qua rtered a Hagenow airfield 2 Li the I 25X1 fie 40 The ld bakery at Hagenow airfie was comp eted, construction of a large boiler house w)..ich was schedule d to be equipped wit h 2 ilers each with a heating area of 48 square meter s started on 25X1 `yhe boiler house was to be completed 1 25X1 5.1 Ithe host-ital in the Priem. forest . 25X1 ieut enant Col onel Griponov (fnu) was chief physician. Major Nikelasky (fnu) was also ass bil Add sto igned to the hospital. itional permanent structures each 19 by 44 m and schedule re houses were planned to be erected by Soviet soldiers i d to serve as n Forest Section 25X1 f the Nleurzuehl Forest near Klein Warin until 'mid-Aug ust,, Pauunion War in and the Grevesrriehlen branch laid normal a e tracks alone two cle arings from the Ne muehl forest station 25X1 25X1 Prisoners from the Buetzow penitantiary were empl oyed on this work, 25X1 7,1 rojects simi lar to thoae in e in War in were under way in the area of Vogelsang in the E berswalde Kreisr 3 CLASSIFICATION SEC Approved For Release 2005/06/30 : CIA-RDP80-0081OA002100620002-8 -REPORT NO. P16 25X1 Approved For Release 2005/06/30 : CIA-RDP80-0081OA002100620002-8 SEC13.~r 25X1 25X1 25X1 25X1 25X1 25X1 ~~omr ent . the 940th AAA Bn of the 94th Gds PfLz Rifle Div in Sc wer In The battalion was believed to have been stationed at the Adol Hitler serve. A transfer to the Fritsch Kaserne appears possible because AAA had since some tire been observed at the. installation and the date of n all probability 25X1 does not coincide with the date of the transfer. Colonel Pononareus (fnu) had been re rted s comrmandi officer 25X1 of the aforementioned unit 25X1 I polonel Golowanov (fnu) was battalion comman er. 25X1 2.1 mment m These units were possibly to perform special exercises. 25X1 3 Corarrtn the unidentified 25X1 engineer battalion of the IX Mtz Rifle Cor s trans errs rom Goerries to Priemerwald to construct a care 25X1 25X1 The construction project in the area o oge a of the barracks installations northwest of Vogelsang which is known from previous reports. SECRET 25X1 Approved For Release 2005/06/30 : C1A-RDP80-0081OA002100620002-8