VP UNDERGROUND CABLE BETWEEN KARLSHORST AND JUETERBOG
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00810A002100610011-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
1
Document Creation Date:
December 20, 2016
Document Release Date:
September 14, 2006
Sequence Number:
11
Case Number:
Publication Date:
July 13, 2005
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80-00810A002100610011-8.pdf | 78.65 KB |
Body:
Approved For Release 2007/10/23: CIA-RDP80-0081 OA002100610011-8
id:.;11,, U31. J. J1. S.1S.1; Vli .(. & -LSJiY
CENTRAL INTELL1GENC'L AGENCY 25X1 REPORT
e `ORMATIO RE Y
COUNTRY East G - m
DATE DJSTR. 13 November 1953
SUBJECT VP Underground Gable tw n larlsharst and NO. OF PAGES 1
+ueterbog
25X1
PLACE
ACQUIRED
DATE OF
1NFO:
TIiIE COGDfd$WT CONT1INS I NFOd&IATlOl9 AFFECTIM THE NATIONAL DEFENSE
Or TH9 UGIT@fl 3TATS3. W_THIli TH? SISAVIND OF TITLR I0. SECTI0SS 793
AT-0fJ OF ITS C0NTGRYS TD OP. &p I1 4Pt BY AN U NADTHQ Z D nERSOH
is PI:CR10RTE0 DY LAT7 7144. REP2U_UCTIOR GSTNi3 FFOTVA 10 PRONIeITED.
~
:,i e. ~ s:AVYV 6 tYS
R3
DISTRIBUTION
_
` _
NO. or ENCLS.
(LISTED BELOW)
SUPPLEMENT TO
REPORT NO.
THIS IS UNEVALUATED INFORMATION
Berlin
In i4i rch l953j, Ferruneldebauamt 11 (TelecoixijunicC:'%, ons CC?Y1:3'Gruotjon Office) la
prepared plans for a 30- wire underground cabls with individual strands of 1a5-;art
diameter which was to be laid for the VP between KarL.shorst air] Jueterbog, The cable
was scheduled- to be constructed by the German postal system and the VFI Fer maeidekabeA.-
An,iagenbau in Berlin and was to be completed by 1.5 hpri3. i953. i ' was scheduled to
construct th cable between Zinna and Jueterhog o The cable was planned to run through
the soviet amplification offices in Koenigswusterhausen, Toepchin, 1k)erenbvrg, and
K=olzenhurg and was to end in barracks installations locr_tsd outside Jueterbogn
ent, Since the cable was planned predominax&ti< for Soviet occupied posts
Inc : r..g Wu nsd.orf. Sperenberg and Luekeuwa.lr a and was to end at the Soviet post in
Jueterbog, leading along KVP installations on Schnell'er Strasse in Berlin and in
Adiershof and along the post of the UP signal battalion in Niederlohme near
ISoeatigswusterhaussn outside Berlin, there is reason for believing that the cable was
primarily pLinnod for roqui.re..ents of the Soviet occupation power
IUAi:UN .3kr,RV_fCnnrzMCT_ ._4n w:
Approved For Release 2007/10/23: CIA-RDP80-0081 OA002100610011-8