NEW OIL INSTALLATIONS IN RUMANIA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A001700310010-8
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 14, 2016
Document Release Date: 
July 9, 2002
Sequence Number: 
10
Case Number: 
Publication Date: 
July 17, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A001700310010-8.pdf123.15 KB
Body: 
Approved For Release 2002/07/29 : CIA-RDP80-0081OA001700310010-8 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT SECRET SECURITY INFORMAT;ON COUNTRY Rumania SUBJECT New Oil Installations in Rumania 25X1 souRFE, This Document contains Information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person is prohibited by law. The reproduction of this form Is prohibited. REPORT NO. DATE DISTR. NO. OF PAGES REQUIREMENT NO. REFERENCES THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE, THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR REV SE/ REVERSE) 25X1 25X1 le A fairly larg@ oil r@fin@ry was und@r construction in early 1952 at a site located :JOO m@t@re east of th@ lun@r mill opposite the railway station of On@eti. Work group@ of the O@neral Der@atorate of the Labor 8@rvie@ (DO - Oireetia O@ rala a Oeiciului XmDii) were aeonetruoting d@rrioke and drilling for oil on a site located appra xiat@ly six k to@tes a @outhwoet of Oneeti on both sides of the road to Filipeeti, 25X1 new oil walla were drilled in the village of Moinesti where urous priIat@ houses had been requisitioned and peasants evicted from their property and fields. At that tine the Rumanian government paid 0000 now leJ. for @ ,,quarter h@ataro of nationalie@d property. 4. Twonty new oil wells were drilled in glanicul Moldov@i during early 1952, Thus# the total number of oil wells in that region is 30, 25X1 5e a project which called for oil drills in the region of Targu ona. The project also Deli;@d for the construction of a railroad to link Tarsu Ocna with Fil pesti and Casing 6. The Valea Osului oarman@eti oil refinery produced a daily output of 3#000 tons of refined oil products, The products were shipped daily in railroad tank oars, The refinery was supplied with raw oil by four pipes buried 1.50 meters underground. These pipes were 10#12# 15 and 22 centimeters in diskmeter. They could be seen at the Trotus River railroad bridge to which they were attached. STATE ARMY $ NAVY #1 AIR L g FBI 25X1 17 July 1953 2 (Nate, WmhIn/ten DINrIbutI pl tEfy@ PF 9rR!A d31ig-~db2/b7/ J?.I CIA-RDP80-0081 OA001700310010-8 23 25 Approved For Rele a 2002107129: CIA-P80-00810A0017003110-8 Showing new oil installations in the Onesti region. 1. Onesti railway station 2. Lumber mill 3 Oil rafinery under construction 4.? Area where derricks were erected SHAT 4560 - ADJUD G.S.,G.S. No. 441.7 Scalar 1/100,000 Scale of the sketch: 1/25,000 Approved,,For Release 2002/07/29 : CIA-RDP80-0081OA001700310010-8 X LO N