PROJECTED CONSTRUCTION OF RAILROAD LINES IN THE BYDGOSZCZ-TCZEW-GDANSK AREA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A001500360005-1
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 16, 2016
Document Release Date: 
May 2, 2005
Sequence Number: 
5
Case Number: 
Publication Date: 
July 2, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A001500360005-1.pdf113.5 KB
Body: 
Approved For Release 2005/06/06 : CIA-RDP80-0081OA001500360005-1 CENTRAL INTELLIGENCE AGENCY INFORMATION REPORT SECR 1] This Document contains information affecting the Na- tional Defense of the United States, within the mean- ing of Title 18, Sections 793 and 794, of the U.S. Code, as amended. Its transmission or revelation of its contents to or receipt by an unauthorized person Is prohibited by law. The reproduction of this fora is prohibited. 25X1 25X1 REPORT NO. DATE DISTR. NO. OF PAGES REQUIREMENT NO. REFERENCES SUBJECT Projected Construction of Railroad Lines in the Bydgoszcz??Tczew-GTd&nsk Area 25X1 THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE. THE APPRAISAL OF CONTENT IS TENTATIVE. (FOR KEY SEE REVERSE) 2 ;July 1953 2 25X1 25X1 1. A conference was held at the Ministry of Railways in September 1952 with the aim of: a. Establishing the possiblitieez of proving operations; the main object being to accelerate the new extensi.orts demanded in addition to those scheduled under the Six-,Year Plan. b. Stepping up the development of the one -usl.it system (sic) - in force on the line We jheerowo Tczew'-MalbO:rk a (Ma:rienburg - Q 55/D 79) c. Working this system with other sectors,:n.bove all with the central and Silesian regions via Torun, Bydgoszcz.,. and Malbork. The development of the_one*unit system foresees the Wejherowo, Tezew, and Malbork railway junctions as gateways to the ports of Gdynia and Gdansk (Danzig). These gateways will be serviced by Bydgoszcz and Torun junctions for Silesian traffic. a. Two additional cracks will be laid from Bydgoszcz junction. on the existing main Bydgoszcz-Tczew line. b. The construction of a line between Bydgoszcz and Starogard is foreseen, which will extend from Starogard via Koscierzyna-Kartuzy as far as We jherowo. This reserve line is mainly. destined for traffic of slow goods and coal trains to Gdynia. The main Bydgoszcz-Tczew line will connect with the reserve line at Kartuzy following the modernization and widening of the Tczev-Kartuzy sec.tor. This will relieve theaoad oft-the Tczew=Gdansk- Gdynia sector. 25X1 (Note: Washington Distribution Indicated by, "X"; Field Distribution by "#".) Approved For Release 2005/06/06 : CIA-RDP80-0081OA001500360005-1 Approved For Release 2005/06/062UA1RDP80-00810A001500360005-1 25X1 SECRET c. Parallel with these construction tasks, repair and modernization of the Torun-Malbork line is foreseen. Above all., Malbork is destined to be a junction for traffic connecting the Gdansk and Gdynia ports with the central regions of Warsaw and Lublin. d. The exclusive utilization to which the Malbork-Tczew sector is subjected causes overloading to an inadmissable extent along the main TTezew-Gdansk- Gdynia line. For this reason it has been decided to construct--- line northwards from Malbork u to where it would intersect another line connecting Elblag (Elbing) directly irith':Gdan kmvi.a Navy Dwor. The projected expansion of the Elblag junction is more for strategic reasons, it being the first junction of the line Kaliningrad-Elblag, westwards. e. It was also decided to put into operation a direct line between Tezew and Skarszewy, without passing a section of the main line or even Starogard. The marshalling yards of Wejherowo, Tczew, Zajaczkowo and, in the Gdansk area itself, the Na Zaspie (Saspe), Trojan, and 'iaski (Sanslweg):ya t.will be,greatly:? extended or even rebuilt in order to increase the use of the ports of Gdynia and Gdansk. 25X1 SECRET Approved For Release 2005/06/06 : CIA-RDP80-0081OA001500360005-1