PRODUCTION OF A-1 GUNNERY TRAINING SETS AT ZEISS JENA

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00810A001300500005-7
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
2
Document Creation Date: 
December 14, 2016
Document Release Date: 
February 5, 2002
Sequence Number: 
5
Case Number: 
Publication Date: 
June 11, 1953
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00810A001300500005-7.pdf120.38 KB
Body: 
CLASSIFICATION S,-TFt T CON'TROL-- UX4 FTCIALS ONLY Approved For Release 206 ':C jfi ' Wb810A001300500005-7 CENTRAL INTEL H I i`~ REPORT NO. INFORMATION .S P IRT I ' CD NO COUNTRY SUBJECT PLACE ACQUIRED DA 7 E OF INFO. I< "Y!U DOCO V T CgHTA3 S ICIry~sRn~,:an :a?V C1DiG am nw.x,sc a.r ,-+.~..?.._- ti T"I9 1111W99D sA es rnTNIC TNA BJC T8 * Of ME MPI*r`A85 ALT BU .,A, C.. 31 AND 92. AS sU C.&11V) iTS TRANSAIM10b+ OP TtIn &SV. tATIOR OR 4T7 OOF.TCNTS IN AI T UMBER TO AN UNAUT(ORIZTD P&CC T 'S SRO Fist Ge corny Production of A-i Gunnery 'fi'rs fining Sets nt Zei ss Jam 25X1X 25X1A 25X1A DATE DISTR. 13. 11; NO. OF PAGES 2 NO. OF ENCLS SUPPLEMENT TO REPORT NO.. THIS IS UNEVALUATED 11,M] NATION the Jeri. Zeian F2. nt ad filled 11 production mid-December 19152 quota of 67 A-1 training sots., The assenbly and to delivery was con- siderably accelerated during the last weeks. Radmirov (fnu), chief of the Soviet acceptance commission had repeatedly urged that the delivery of these sate be accelerated, pointing to delays and careless work on the mart' of the plant administration. ?,'orkmon and also engineers had ot- ously sabotaged the production of the A-l set, but at last tie de. livery date fixed by the Soviets was met. Sets which had been checked out in the evening, often did not function the next dat.l. 2., On 22 January 1953, the Soviet pilots arrived with a defective A-1 se'. from Cottbus to have it repaired at the Suedwoik of the Jena Zeiss Plsf:.1 It was one of the first sets delivered in 1949. On 19 January, an eng:i*.eer, also several technics ns and an interpreter went to repair en A-1 set at Grossenhain airfield, 25X1A The 1953 production quota of 135 A?-1 pilot training sets was forwarded ~:o the Zeiss Plant in February. Preparatory work for this production bad tilready been started Lit the Suedwerk. .1ccording to the production plan, the first set was to be delivered in June 1953. Sourer believed that, owing to di;-fi cu?ties in the ococuremen't of materie1s,this target date would not be riet) One set of the 1952 series remained as a model at tivrplant? pr .+aced, some sad been sur,jected to ':eav., Strains for :rat few of th ^ had fni?ed or become Oefrr,ttZO.. the production of these precision instruments. Of the a pro .mfite y f ets dm? rov, Timonin ?fnu, and Sir:akov (fnu). the three leading Soviet offs eers of Px- an insngction corir.isslon which checked the A--1 sets :gin l952.. paid t. f"inaL visit to Director Hugo Schrade after the last sets of 1952 had bes n t h; %ci trap In a speech, Major l.a6zi ov praised the work accomplished by Dr.Schrada his staff, and the entire personnel of the Zeiss Plant pointing out theft, xh spite of all the difficulties experienced in the supply of materials, c, otas Approved For Release 2002/07/15 : CIA-RDP80-0081OA001300500005-7 Approved For Release 2002/07/15 : CIA-RDP80-00810A001300500005-7 S7C7'T/CONT?'OI? - LT,S C T'ICJ.PIS ONLY 25X1A i~ C ent The 1952 and 1953 prcduction quotas were previo*sly repor ed. . According.; to rrevious inffr- ration, rigid work conditions and the difficulties in the sups of materiels causo i the delays in 1952. 2. aento The defective set fron Cottbus was proLaIly used Tor a trainini of the 1st VFL regiment which had Soviet instncc- torn. Air units stationed at Grossenhain included one fighter division headquarters and two fighter regiments. S?XR7T/COi?1TTRCI. - U .OT1 iCItLS OILY Approved For Release 2002/07/15: CIA-RDP80-00810A001300500005-7