Approved For Release 2009/03/04: CIA-RDP80-0081 OA001200100004-3
CENTRAL INTELLIGENCE AGENCY
INFORMATION REPORT
This Document contains Information atgcting the Na-
tional Defense of the United States, within the mean-
ing of Title 18, Sections 793 and 794, of the U.S. Code. as
amended. Its transmission or revelation of its contents
to or receipt by an unauthorized person is prohibited
by law. The reproduction of this form is prohibited.
SECRET/CONT tOL -. U.S. OFFICIALS ONLY
SECURITY INFORMATION
COUNTRY Rumania
SUBJECT Construction Trust No. 2
DATE OF INFO.
PLACE ACQUIRED
This is UNEVALUATED Information
REPORT
DATE DISTR.
NO. OF PAGES
REQUIREMENT NO. RD
REFERENCES
THE SOURCE EVALUATIONS IN THIS REPORT ARE DEFINITIVE.
THE APPRAISAL OF CONTENT IS TENTATIVE.
(FOR KEY SEE REVERSE)
General
1, A general reorganization in the Ministry of Constructions took place at the
end of 1951 and the beginning of 1952. All construction enterprises, which
had previously been designated by M and a number, were combined into four
large regional groups and named "Trusts".
25X1
2. Trust 2 is the combination of M 2 (Bucharest), M 6 (Craiova), and m 8 (Galati),
Trust 2 operates in Moldavia, but its office is at Calea Beldiman No. 1,
Bucharest. In March 1952 Trust 2 employed 25 engineers, 5,000 workers and
clerks, and 5,000 men in labor battalions.
3. Organizations and factories must supply funds for work done by Trust 2. In
many instances funds are exhausted before work is completed, because Trust 2
does principally civilian construction, and military work receives priority.
In 1951 Trust 2 did not complete more than 20 per cent (?) of planned work.
4. Many technicians and workers have left their trades, thus contributing to
delays in work. Work norms are not high now, and the average worker may
expect to earn bonuses over the very low regular rates of pay.
Construction accomplished by Trust 2 in_1951
5, Tabacaria Nationala tanning works:
a. Building 13, a three-story structure 18 x 120 meters. Concrete tanks,
8 x 4.5 x 3.6 meters for the preliminary tanning process were built into
the ground floor, and provided with hot and cold water through the fact-
ory's central heating system. The building is heated by air passing
through one-half inch pipes Immersedd in water jackets which are warmed
by a one-half horsepower E. G, (Czech) electric motor. Each such in-
stal.Latiorn can produce 30,000 calories. This system is generally used.
SECRET/CONTROL - U . S . OFFICIALS ONLY
25X1
25X1
STATE B ARMY g _ IIAVY iR ~~ FBI AEC s IORR
7C
(Note. WasUsglten Disiributl.n Wk-+i.d by "X"; F!.l+i Diaa,Pixudon by "v'
7 May 1953
2
Approved For Release 2009/03/04: CIA-RDP80-0081 OA001200100004-3
Approved For Release 2009/03/04: CIA-RDP80-00810A001200100004-3
SFCR/CTROL - U . S .OFFICIALS ONLY
instead of radiators because Rumanian cast iron. is too fragile and very
poor- in, quality. Although the building had been completed at the end of
1951, there was ino indication at that time that it would be used in the
immediate futureo
b. Building 12, a four-story structure,is similar to Building 13. The ground
floor has 16 large vats for the second tanning process. Sixteen Soviet-
made 10 h.p. motors supply power. The next floor has a hot air installation
which dries skins for 48 hours after processing. A. Czech spray-dyeing in-
stallation is on the floor above.
c.. Hall 16 has 60 concrete tanks 3 x 3.5 x 2.5. These are also used in the
first tanning process, and each tank holds 100 &ins.
6. Sovromtransport garage at Colentina. The building can hold 150 trucks, but no
equipment had been installed by the end of 1951.
7, A garage for the Ministry of the Interior, address unknown. The building, a
concrete structure, can hold 120 trucks,
8. School of Agriculture on Soseaua Baneasa, A series of buildings were ordered
in 1951 at a total investment of 400,000,000 lei (before stabilization), and
the work is to be spread out over a period of five years. One small building
and a lecture hall were completed by the end of 1951.
9, Filantropia hospital. The basement and ground floor of a five-story annex was
completed by the end of the year, at which time work was halted for lack of
funds.- Twenty-eight small rooms, 3 x 3.5 meters, are on the ground floor,*and
the partitions are covered with 8 mm lead sheeting. Each room has a single
small window, 30 x 30 cm., of special glass containing ground lead. X-ray
apparatus, received in boxes marked with USSR and Czechoslovakia, were installed
at the end of the year,
10. Trust 2 workshops on the site of the former Prager factory. Four buildings
20 x 60 meters were completed in 1952 and Soviet lathes and machinery installed.
These buildings are workshops in which building materials will be prefabricated.
11. Cement factory at Cernavoda. Several new factory halls were completed.
12, Army storage tanks near Iasi and Craiova. These underground gasoline storage
tanks, approximately 50 to 55 x 20 to 25 meters, are built of reinforced
concrete,
13. Former Copaceni royal estate. Buildings capable of quartering five regiments
were completed by the end of the year,
14. Work in the Resita factory has been continuous since early 1948,
lies
15. Galvanized sheet iron is imported from Germany (Soviet Zone and Czechoslovakia,
although small quantities are produced at the Resita and Titan works. The
shortage of galvanized iron is occasioned principally by the use of this
material to replace galvanized zinc, which is not available at all,
16. Tin is imported from the USSR, but it is always in short supply,
17. The former Malaxa works furnish insufficient quantities of water pipes and
faucets.
18. Migea Lour the manna in director of Trust 2, is
a Party member,