GRAPHITE FACTORIES IN USSR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000700060411-7
Release Decision:
RIPPUB
Original Classification:
R
Document Page Count:
2
Document Creation Date:
December 22, 2016
Document Release Date:
October 5, 2011
Sequence Number:
411
Case Number:
Publication Date:
May 20, 1952
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80-00809A000700060411-7.pdf | 93.84 KB |
Body:
Sanitized Copy Approved for Release 2011/10/06 :CIA-RDP80-00809A000700060411-7
CLASSIFICATION S-E-C-R-E-T
CENTRAL IWT~ELLIGENCEAGENCY
INFORMATION FROM
FOREIGN DOCUMENTS OR RADIO ?ROADCASTS
COUNTRY USSR
SIIFi.!ECT Economic -Graphite Industry
HOW
PUBLISHED Semixeekly newspaper
WHERE
PUBLISHED Moscow
DATE
PUBLISHED
LANGUAGE
10 Aug 1951 - 1 Mar 1952
Russian
CD N0.
DATE OF
INFORMATION 1~j51- 1952
DATE DIST. ?~ May 1952
N0. OF PAGES 2
SUPPLEMENT TO
nu oocoYm coYtuu urou~noY unmY~ m unom ocnYn
or ?YC uuao rrYm nnu TIIY ~unu or unoYUC ~n u
r. r. c., n ?YO u. u ?YUem. m nuanuloY cY m nwunoY
0I In CoYVYO IY ~Yf Y~Y1lY 10 AY VYYY}YOYIIIO rtOOY R rYO~
Y1nRG Y1 uY. nrYCYYm011 or tY1C roYY Ir MOYIYIIiY.
THIS IS UNEVALUATED INFORMATION
Proagehlennost' Stroitel'nvkh Materialov.
GRAPHITE FACTORIES I$ USSR
TAYGA GRAPffiTE FACTORY UNDER CONSTRUCTION __ Moacov
aykh Materialov, 10 Aug 51 ~ Promyehlennost' Stroitel'-
Taygn GraphiteZFactory (director Str@phite) Trust (director, Borisov) and the
the plea for capital construction. Wi~othehhel s =~ n fine example in rating
personnel from other ante P engineers and technical
technical construction rprises, the trust has been able to complete the
short Plan for the main building of the Taygn Pnctory in a
period, and working drawings are now being PreP~'ed. A
handed by Shakay and Artsmonova, which was formed at the'coastrn~ctionfsit~iss
working on the technical plane and is assisting the builders in saving con-
aidersble quantltiee of metal by using supporting asbestos-elate parts and
other light structures, Construction brigades have been famed frog workers
of the Taygn factory and other nearby enterprises. The 6-month plan for con-
struction end installation work has been exceeded. The July 1951 plan vas
fulfilled 170 percent.
The main ;:gilding of the factory is to be completed end put into operation
2 months ahead of schedule, i.e., by 7 November.
CONSTRUCTION PROGRESSES __ Moscow, Pro~?shlenaoet' Stroitel'nykh Materialov,
31 Aug 51
Construction of the concentr~~:.ion plat pp the Tay Graphite Combine of
"Glavnemetrud" (Main Administration of Nonmetallic Ores Industry) is progress-
ing satisfnetorily. The construction estimates and plans for this project
were prepared by the "Chelysboblproyekt" (Chelyabinsk Oblast Planning) Trust,
with the active participation of the Kysht City parttiq nrgaaizntion age tht
Chelyabinsk Oblast Conmdttee of VKP(b). ~la would seem to indicate that the
new graphite factory is being built in Chelyabinsk Oblast, near I~ylahtym, and
not in Taygn, Kemerovo Oblast]
?I RIUUIIVIY
Sanitized Copy Approved for Release 2011/10/06 :CIA-RDP80-00809A000700060411-7
Sanitized Copy Approved for Release 2011/10/06 :CIA-RDP80-00809A000700060411-7
S-E-C-R-S-T
~~ ~ X11 ~ some of the aoa oraer enterprises of the "goYuzgrePit"
Oblast, supplied the asses ~8er coaativetion organizations of Ohelyabinsk
vary labor forces for this construction project.
HOtl&I~. PHOYIDBD FOA GRAPHITE AO$Y3Rg -- ~'ont9ehleanoet' 3troitel'nykh Mate-
rialov, 24 Oct 51
atrmati~om~ ~ int hen completed the 1951 plan for housing con-
Aa.aiditiaaal pat Into service 250 square meters of lining area.
eight-apartment building will be completed and ready for occu-
F~oY by 7 Novonher.
TAYGA SRAPffiTg FACTORY COIO'LBTED __ Pr'omyehlennoet' Stroitel'nykh Naterialov,
1 Nan 2
~~ uila7++g9of~the Te$~ ~~~ Coabine Duilt anti put into operation the
meahlaery. For the firsc~~t~ pLaat. The plant is equipped with ~~
used. Another.imo~atioa ie a~ mills for dry griadiyg of graphite are being
concentration of h~ls' productive flotation machine for the
graphite.
Yarkara of the pleat hate quickly mastered the use of the aev equipment.
reached~Zn Feb-math of operation, the Planned capaeity of the plant tae
ruerY 1952, labor productivity increased 30 percent over
.7aauary.
HRASIPOYARSK GRAPHITE FACTORY -O3CHANIZBS UNLOADING OPERATIONS -- Fromgahlenyoet'
Stroitel'nykh Naterialov, 1 Dec 51
_ The.Kraaaoyarak Graphite Factory recently began to use tao 8-153 rock-
ore irombrarglnea of~ithe~e freed in the coal industry for u~.oadipg.grsFhits
completely, thereby rndu Possible to aechaaizn unloading operations
one fifth of the cing ~e number of vcrYere employed is unloading to
Previooa number.
The Breanoyarak Graphite Factory succeeded in obta
of graphite ore earlier than usus7 ~~g its annual supply
KRASNOYARSK GRAPHPi'E FACTORY INSTALLS NBM EQUIPN6RP -
aykh Materialov, 16 Jan 52 " ~4ehlemost' Stroitel'-
The 8rsanoynrak Graphite Factory (director, 3. Zibitaker) has doge copsid-
ernble cork to improve Braphite.duat collection. A.dust chamber sae built early
1n 1951 and proved very eatlafaetory, filth the .help .of thin'+*~t.~i:
sumption of rev material per ton of ?.ilnished product wa r'edmced conaidarab3. n-
7
A second, improved type of duet chamber vas recently inetalied at the plant.
The collection of graphite duet hsa Smprovad working conditions and reduced
Production losses.