DESIGN NEW EXCAVATORS, BULLDOZERS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000700060216-4
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
4
Document Creation Date: 
December 22, 2016
Document Release Date: 
October 5, 2011
Sequence Number: 
216
Case Number: 
Publication Date: 
May 2, 1952
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000700060216-4.pdf194.35 KB
Body: 
Sanitized Copy Approved for Release 2011/10/06: CIA-RDP80-00809A000700060216-4 CLASSIFICATION CONFIDENTIAL CENTRAL INTELLIGENCE IGENCE AGENCY INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS SUBJECT Economic; Technological - Earth-moving-machine HOW industry PUBLISHED Daily, thrice-weekly newspapers WHERE PUBLISHED' USSR DATE PUBLISHED J. Nov 1951 - 15 Feb 1952 LANGUAGE Russian rxlt COCUxaxr coxrAna Woa.Allxx AOCCLxa 1xx MACOxal xlgxaa or rxa uxino atttta nrxu rxa lIng,. or unoxan All ao Ac.. n Axo aa. Aa mxarx. ,ra raaunauox or rxa rtnunoA 01 In oxrax. I AM Wxaax ro A. ux IInar gbOx a rxo xumo w 1A1. nnoournox or rxu r ORI axx noxuittx. SOURCE Ne?.rsparers as indicated. CD NO. DATE OF DATE DIST. -7-4411952 SUPPLEMENT TO REPORT NO. THIS IS UNEVALUATED INFORMATION DESIGN NEW EXCAVATORS BULLDOZERS USE OF INTERCHANGEABLE PARTS CUTS LABOR CONSUMPTION -- Moscow, Moskovskaya Pravda, 23 .;an 52 The Dmitrov Excavator Plant, whose products are used throughout the coun- try for reclaiming bogs, extracting peat, laying cables, and other purposes, has been steadily increasing its production volume, while improving the design of its p:educts and the technology of their manufacture. The 1951 plan was met on 3 December. Ten mu t'_p1e-bucket excavators were made of saved metal, 700,000 rubles wereesaved.sthrough reducing production costs below the plan, and over 500,000 plan profits were realized. The plant puts out five types of excavators, each one of which consists of 800-900 original parts. These parts must be turned out in small groups, which means that much time be out in tooling up. Thus, one of the most important problems confronting the plant is unification of design jesigaing interchange- able parte7. A great deal has already been done in the way of unification: 40 percent of the pats going into the ET-352 excavator, for example, are now in- terchangeable with those of the ET-251. The number of these parts turned over to the machine shop can now be doubled, and labor consumption in building a new machine has been cut nearly 15 percent. Another problem to which the plant is devoting considerable a.tention is rate that the durability of parts and simplifying the da:jign of sepa- -mplification of crawler units has reduced 21 times the metal re- quired for their manufacture. Designers are now planning to reduce the number of gears and shafts in gear trains, a measure which should cut labor consump- tion it their manufacture 25-30 perr-nt. Certain changes in design have greatly aped up production. Separate units were designed so that each unit could be assembled in parallel progression; the .excavator would then be assembled from these units. This procedure reduced the assembly time for the excavators from 8 days to 8 hours. STATE 4NAYY ARMY tL AIR LI Sanitized Copy Approved for Release 2011/10/06: CIA-RDP80-00809A000700060216-4 Sanitized Copy Approved for Release 2011/10/06: CIA-RDP80-00809A000700060216-4 The closed technologic,_; cycle was established for the machining of parts. Under this system, a single group of machinists handles only one type of part: one group machines housings; a second group machines gears and pinions; a third, shafts and axles; and so forth. This form of specialization makes it easier to supervise production and to plan and carry out the supply of material and tools to the machinists themselves become more proficient and more produc- tive. High-speed methods are being pushed, and one half the lathes and milling machines are now operated under high-speed methods. Automatic and semiauto- matic welding and cutting are applied. A new, heavy hydraulic press has been installed in the forge shop. Mold- ing machines from the Moscow Krasnaya Presnya Plant have been set up in *'Le fu..i dry. Work is now going on which should result in increasing the guaranteed service limits of the excavator 12 times. It is also planned to render them adaptable to loading-machine rigs so that they can be utilized in the winter months when the excavators would be idle otherwise. -- P. Shinkarenko, direc- tor, Daitrov Excavator Plant NEW MACHINE TO BE USED FOR IRRIGATION WORK -- Moscow, Izvestiya, 1 Nov 51 The Kiev Krasnyy Ekskavator Plant has put out the first of a group of new excavators designed for use in irrigation and reclamation work. WILL PUT OUT NEW MODEL IN FIRST QUARTER __ Moscow, Moskovskiy Stroitel', 27 Nov 51 The Kovrov Excavator P:ant has developed a new excavator, the E-507. This model is actually a modernized version of the E-505. The bucket capacity of the new machine has been increased from 0.5 to 0.75 cubic meters, while the machine's over-all weight has been increased only 2 tons. It can be rigged as a trench hoe or hoisting crane. The durability of many parts of the new ma- chine has been increased. Builders will get the first E-507 excavators in the first quarter of 1952. Leningradskaya Pravda, 8 Jan 52 The Kovrov Excavator Plant, which regularly has been meeting order from the great construction projects ahead of time, shipped out an early consign- ment of excavators in the first week of 1952. The excavators which the plant put out in 1952 differ markedly from those it produced in 1951. The carriage has been modernized and the welded bucket replaced .ith a cast one. Important gears, which formerly quickly wore out, are now subjected to high-frequency heat treatment. SEND CANAL BUILDERS EXCAVATORS -- Stalinabad, Kommunist Tadzhikstana, 21 Dec 51 Over 50 industrial enterprises of the Donbass are contributing products to the great construction projects. Outstanding among them is the Novo-Kramatorsk Plant imeni Stalin, which has sent dozens of 3-cubic-meter excavators. Sanitized Copy Approved for Release 2011/10/06: CIA-RDP80-00809A000700060216-4 Sanitized Copy Approved for Release 2011/10/06: CIA-RDP80-00809A000700060216-4 COMPLETE GIANT MODEL FOR MINERS -- Tashkent, Pravda Vostoka, 21 Dec 51 The Novo-Kramstorsk Plant imeni Stalin has c li d it en vator has a yearly productivity of 4,500,000 cubic metersosl mines, the exca- e cubic-meter-capacity excavator. It consists of 588,000 partssandcis powered by 44 electric motors. Designed for operation in o it Vil'nyus, Sovetskaya Litre, 2 Feb 52 The last carload of parts of the recently completed 15-cubic-meter-capac- ity excavator today left to Novo-Kramatorsk Plant imeni Stalin on its way to an open-pit mine in Siber , It took over 100 flat cars to move the excavator. ASSEMBLE SIXTH WALKING EXCAVATOR -- Moscow, Pravda, 31 Dec 51 The Sverdlovsk Uralmash Plant has assembled its sixth heavy walking exca- vator fdragline7 and is working on a seventh. Both the sixth and seventh ma- chines will have 14-cubic-meter buckets and 75-meter booms. SERIES-PRODUCE MODERNIZED MODEL -- Kishinev, Sovetskaya Moldaviya, 4 Jan 52 The Kostroma Rabochiy Metalli.st Plant has established series production of a modernized excavator. The machine's weight has been reduced 4 tons, and the control of the traversing element has been improved. START WORK '1N PARTS -- Moscow, Pravda, 5 Jan 52 The Tashkent Ex,a ator Plant has begun work on the parts for a new exca- vator designed for irrigation work. SINGLE MOTOR RUNS NEW TR'''K SHOVEL -- Tallin, Sovetskaya Estoniya, 12 Jan 52 The Leningrad Excavator Plant has completed tests on the new E-258 truck- mounted excavator, which it developed in collaboration with the Leningrad Af- filiate of the All-Union Scientific Research Institute of Construction and Road-Machine Building. The motor providing the motive power also runs the dig- ging unit. The E-258 will be series-produced. TURN OUT EXCAVATOR UNITS -- Moscow, Komsomol'skaya Pravda, 15 Feb 52 The Petrozavodsk Plant imeni Molotov, which produces metal structures for the great construction projects and for general industrial use, also turns out floor plates for the ESh-4/40 excavator and cabs for the ESh-l excavator. PUT OUT ABOVE-PLAN BULLDOZERS -- Kiev, Pravda Ukrainy, 1 Jan 52 The Kharkov Road-Machinery Plant met the 1951 plan for production of 'items for the great construction projects in its entire range of products on 21 December. The plant has completed several above-plan bulldozers and other items. Sanitized Copy Approved for Release 2011/10/06: CIA-RDP80-00809A000700060216-4 Sanitized Copy Approved for Release 2011/10/06: CIA-RDP80-00809A000700060216-4 SHIP BULLDOZERS TO GES BUILDERS -- Leningradskaya Pravda, 8 Jan 52 The Chelyabinsk Road-Machinery Plant imeni Kolyushchenko today shipped five bulldozers to the builders of the Kuybyshev GER. Some of the machines built in the first days of 1952 were shipped to the Stalingrad GLIB site. Moscow, Izvestiya, 9 Jan 52 Acting on the suggestions of workers at the construction prcjects, the Chelyabinsk Plant imeni Kolqushchenko has made some improvements on the shock absorbers and transverse blade supports of its scrapers. S. M. Trarasov, the plant's chief engineer, has developed an improved bulldozer which is 910 kilograms lighter than the older model, is sturdier, and easier to operate. DESIGN PNEUMATIC SHOVEL LOADER -- Riga, Sovetskaya Latviya, 3 Feb 52 A pneumatic-powered combination shovel and loader designed at the Riga Turbine-Machinery Plant will be used in the construction of tunnels, digging up earth, and loading it into cars. It will weigh 4J tons and will have a productivity of 50 cubic meters of earth per hour. The plant has already begun work on the machine's pneumatic motor and un- dercarriage. SEND EQUIPMENT TO CANAL, GES BUILDERS -- Moscow, Pravda, 13 Feb 52 The Bryansk Road-Machinery Plant has fulfilled many orders for the great construction projects this year, shipping two self-propelled multiple-bucket loading machines to the site of tr- Main Turkmen Canal and an asphalt mixer and a heavy grader to the Kakhovka GES site. Among the above-plan items which the plant put out in 1951 were 10 medium and 20 heavy graders, 11 asphalt mixers, 6 self-propelled bucket loaders, and 103 bitumen pumps. The grader elevator which the plant produces has a productivity of 600 cu- bic meters of earth per hour. SEND DUMP CARS TO KUYBYSHEV -- Ashkhabad, Turkmenskaya Iskra, 15 Feb 52 The Kaliningrad Railroad-Car-Building Plant has sent a consignment of 50- ton self-unloading dump cars to the builders of the Kuybyshev GES. -4- CONFIDENTIAL Sanitized Copy Approved for Release 2011/10/06: CIA-RDP80-00809A000700060216-4