SURVEYS FIVE-YEAR PLAN CONSTRUCTION PROJECTS
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00809A000600400782-9
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
1
Document Creation Date:
December 22, 2016
Document Release Date:
August 25, 2011
Sequence Number:
782
Case Number:
Publication Date:
August 17, 1951
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80-00809A000600400782-9.pdf | 64.53 KB |
Body:
Sanitized Copy Approved for Release 2011/08/25: CIA-RDP80-00809A000600400782-9
I
CONFIDENTIAL
CENTRAL INTELLIGENCE AGENCY
INFORMATION FROM
FOREIGN DOCUMENTS OR RADIO BROADCASTS
COUNTRY Rumania
SUBJECT Economic - Plan, general construction
HOW
PUBLISHED Semimonthly newspaper
WHERE
PUBLISHED Bucharest
DATE
PUBLISHED
LANGUAGE
THIS DOCUMENT CONTAINS INFORMATION AFFECTING TAR NATIONAL DEFENSE
OF THE UNITED STATES WITHIN THE MEANING OF ESPIONAGE ACT SO
U. G. C .. SI AND SEAS AMENDED. ITS TRANSMISSION OR THE REVELATION
OF ITS CONTENTS IN ANY MANNER TO AN UNAUTHORISED PERSON IS PRO.
HISITED BY LAW. REPRODUCTION OF THIS FORM IS PROHIBITED -
Roumanie Nouvelle.
REPORT
CD NO.
DATE OF
DATE DIST. 17 Aug 1951
NO. OF PAGES 1
SUPPLEMENT TO
REPORT NO.
SURVEYS FIVE-YEAR PLAIN CONSTRUCTION PROJECTS
The First Rumanian Five-Year Plan (1951 - 1955) will require an outlay of
1,330,000,000,000 lei, of which 520 billion are allocated for construction pur-
poses. The Danube-Black Sea Canal will be completed. Two new ports will be
built at Cernavoda and Midia, respectively. The most ambitious project of the
entire Five-Year Plan electrification program is the "Vladimir Ilich Lenin"
Hydroelectric Power Plant at Bicaz. Other hydroelectric power projects are
those at: Dragan-Remeti, Gureni, Sadu, Moroeni. Thermal power plants are planned
for Petrosani, Doicesti, Filipesti, Sangiorgiu, Valisoara, Comanesti, Sarmasag,
Ovidiu. These will provide power for the many factories of the new "Sovrom.
Metals" Combine, machine-tool plants, the Campina-Villa Stalin railroad line, and
the cellulose combine on the Danube delta. This cellulose plant will utilize
reeds as raw material.
The machine-`.ool plants will make it possible to equip 11 new spinning-mills,
1. :;;w :sex-r.'t+, :?tablishments, twc w c..processing plants. an artificial
silk facT.or,y, sto ian3 :' ~ctory. :i sh,e factory which vi. ,.1 have an annual output
of .: :.'.,COO pairs of footwear, as well as varioui sugar, starch, glucose, and
canni.cg factories.
In the cultural sector the following are planned: the large University
Center at Bucharest, the "Casa Scanteia" Press, the movie studio at Buftea (where
18 long films, 490 newsreels, and 18 shorts will be turned out during the 5-year
period), the radio-center, the national theater and the opera house at Bucharest,
as well as the provincial theaters at Constanta, Botosani, Galati, Satu-Mare,
and Piatra-Neamt.
Workers' housing projects will cost 43 billion lei. Residences covering
2,800,000 square meters will be erected at Resita, Hunedoara, Baia-Mare, Petro-
sani, Valea Prahovei, Bucharest, and elsewhere.