ECONOMIC - INDUSTRIAL MACHINERY

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600240091-4
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
July 7, 2011
Sequence Number: 
91
Case Number: 
Publication Date: 
July 7, 1949
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600240091-4.pdf206.18 KB
Body: 
Sanitized Copy Approved for Release 2011/07/07: CIA-RDP80-00809A000600240091-4 v CENTRAL N 1ELLPGFICL'E"AGENCY INFORMATION FROM FOREIGN DC UMENTS ORRAD+O BROADCASTS COUNTRY U33R SUBJECT. Economic Industrial machinery HOW PUBLISHED Daily newspapers WHERE PUBLISHED USSR DATE PUBLISHED 5 - 29 Sep 1948 LANGUAGE Russian 0. 0. e.. tI MO as. Y "Net". 1M e0MN10tlO0 w 01* a...F.mw 01 If! 00010010 It ?01 1t0000 !0 M 001011001000 wtwt is 100? ?Ir1100 b YO._ IMMOgC"00 N TIIU 1000 II 000111tl570. REPORT .CD NO. DATE DIST. 7 Jul_ 949 NO. OF PAGES REPORT NO. THIS IS UNEVALUATED. INFORMATION MACRIICERY PLANTS INCREASE PRODUCTION RIGA PLANT FULFILLS 1948 PLAN -- Sovetskaya Latviya, No 211, 5 Sep 48 The Riga Scales Plant has,completed the 1948 gross production and quantitative production plan. Production of Gloriya and Beranzhe acalos'has doubled cs compared with 1947. Production costs have de- creased by 23 percent. Gloriya-scales cost 1,375 rubles in 1947 and now cost 666 rubles. The cost of Beranzhe scales-has de^reased by more than 50 rubles. Sovetskaya Latviya, No 2~9, 15 Sep 48 The "Erasnyy Metallist" Plant of Riga fulfilled the year plan on 10 September. During the remaining period of the year, the plant will produce various agricultural machinery, stove fixtures, scales, ironware, and other products, amounting to 700,000 rubles. ?I.4CUINE-BUILDING PLANT SHOWS PROFIT -- Pravda Ukrainy, No 214, 9 Sep 48 The Rutchenkove Machine-Building Plant imeni Khrushchev has been operating without " state'subsidy for several years and is working at a profit for the government. The plant has decided to make an additional profit of 900,000 rubles by the end of the year. The mechanical, electrical, and boiler shops have been placed on a cost accounting basis. At present, cost accounting procedures are being introduced in the other shops: 50X1-HUM Sanitized Copy Approved for Release 2011/07/07: CIA-RDP80-00809A000600240091-4 SOURCE Newspapers as indicated'.. Sanitized Copy Approved for Release 2011/07/07: CIA-RDP80-00809A000600240091-4 r PIPE FOUNDRY RESTORED -- 3o e`skeya Mcl' vl ,a. Nc. 1914; 29'gen 4,9 Restoration of the Mogilev Pipe Foundi,7 been completed, The pipe casting, sheet rolling, galvanizing, and machine shops have been pu Lr..,o operation. The enterprise has now reached.itsprewar capacity level. PLANT LOWERS PRODUCTION COST --. Pravda Ukrainy, No 214, 9 Sep 48 Last year the plant im:nl 15-Letlya i,K3MU (in the Ukrainian SM.Z had an S-million-ruble loss, Steps were taKeu to.rectify this situa- , tion and lower production, costs.. As a result, plant production for the past 7 months has been considerably above plan and an extra profit has been attained. The plant has produced 6.?'4 percent ,more elevators than were provided in the plan, 16.3 percent; more electric winches, 14.2 percent more spare', parts, and 13.6 percent more of various other equipment. The plant has accumulated 4,344,000 rubles above plan. MASS PRODUCTION OF ELECTRIC TRACTORS BEGINS .-- Pravda 22 Sep 48 Ukrainy, No 225,,. The Sverdlovsk Motor Repair Plant has turned out two experimental electric tractor The plant is now preparing for mass production of these tractors. The first consignment will be sent to the Korsum?- Shevchenkovo MTS in Ukraine in January 1949. s EC~E~ Sanitized Copy Approved for Release 2011/07/07: CIA-RDP80-00809A000600240091-4 RECONSTRUCTED PLANT PRODUCES DRILLS -- Pravda Ukrainy, No 225, 22 Sep !.8 The newly reconstructed "Barrikady" Plant in Stalingrad has initiated mass production of drilling machines. Production is In- creasing every month. The drilling machine may be moved easily from place to place and may be used in all forms of geological strata and at any time of the year. It takes only 8 days to assemble this machine, whereas a month and a half is required to assemble the exist- LLIg Cutters. PIPE ROLLING PLANT STARTS PRODUCTION -- Turkmenskaya Iskra, No 181, 11 Sep 48 Construction of the Sumgait Pipe-Rolling Mill is going full speed. The foundry and open-hearth-furnace shops are now being pre- pared for operation and assembly of two open-hearth furnaces was started recently. Blast furnaces, drying furnaces, and heat treat- ment furnaces are being put into operation in the casting shop. The ventilation system and mechanized sand-conditioning installations are being assembled at present. The plant is already producing steel and cast-iron fittings for the open-hearth furnaces, spare parts, equip- ment, and instruments for the Dnepropetrovsk, Chelyabinsk, and Nikopol? Pipe Rolling Mills. Sanitized Copy Approved for Release 2011/07/07: CIA-RDP80-00809A000600240091-4 F hammer which vii cpex'ateet a,;i.ressure of 7 - 8 atmospheres: It3 ze at 3taro-gr4matcrs'ahave organized the production of 3-ton pneumatic steam drop hammers. The plant has already built four of these machines, One hammer has been received by the Kharkov Tractor Plant; two have been shipped to"U*_'a'mashstrov"',(Ural Machine Construction) and "Aztekhsnabneft'" (Azerbaydzhan Technical Petrol,eu.n Equipment Supply) The machine builders have now begun the'production of a 5-tc;n The works;G of the Maohtne.-Building Plant imeni Ord, honikid HEAVY DRGF BA RS PRODUCED AT STARO- AM ATORSK -- Sovetskaya Estoniya, No 221, 17 Sep 48 The Bobruysk Machine-Building Plant.imeni Stalin completed its annuli?. plan 2 months and 13 days ahead of-..schedule. The value of machinery produced this year was 1,726,000 rubles greater than the value of that produced during the comparable period in 1947. MACHINE-BUILDING PLANT COMPLE ES PLAN No 189,. 22 Sep 48 operation an iron-casting cupola furnace and a copper-smelting furnace vhieh were prepa=d and assembled by the workers at the plant, and which supply a considerable part of the plant's needs for cast iron and nonferrous castings, In the last few months, the plant started production of electric engines for streetcars, control-boards, relays for suburban electric trains, and other electrica.1 apparatus. "REZ" PLANT INSTALLS NEW PROCESSES Sovetskaya Latviya, No 224, 21 sap 48 The "_1EZ" (Riga Machine-Building) Plant recently nut into Sanitized Copy Approved for Release 2011/07/07: CIA-RDP80-00809A000600240091-4