ECONOMIC - MACHINE TOOLS AND ENGINES

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600231085-2
Release Decision: 
RIPPUB
Original Classification: 
S
Document Page Count: 
3
Document Creation Date: 
December 22, 2016
Document Release Date: 
July 18, 2011
Sequence Number: 
1085
Case Number: 
Publication Date: 
July 1, 1949
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600231085-2.pdf175.53 KB
Body: 
Sanitized Copy Approved for Release 2011/07/18: CIA-RDP80-00809A000600231085-2 CENTRAL INITELLIGE ' ENCY INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS REPORT CD NO. COUNTRY DATE OF INFORMATION 1949 SUBJECT Economic - Machine tools and engines HOW PUBLISHED Daily newspapers WHERE PUBLISHED DATE PUBLISHED 3 Mar - 3 Jun 1949 LANGUAGE SUPPLEMENT TO REPORT NO. 1111 01010611 001761116 1000011101 A70Ie"IVI101 1611100. 0051111 M 111 001111.110T9! 9ti010 100 090111001111101111 607 1/ /. I.. O., II 111 11.00 !!00061. 190 YlM61111101f M ft 11161010! M III 01111111 11 006 1611$ 10 I1 1I?0100IIYRI 111101 t! I00. 110111 M 4s. MMIMCI111 011116 500 tI 1001111111. SOURCE MACHIM-TM OUT:U1' WWM IETAIR LACE a EDILM 8 PLANT Ill'180DUCES HIGH-SPEED KILLING -- Moekovskiy Bolshevik, To 69, 24 May 49 The Solana Heavy Machine-Tool Plant, through Its own efforts and experimentation, has introduced b!gh-speed milling. Knowing that a high durability of cutting tools must be attained to have high-speed cutting, plant engineers changed the design of the cutting tool. An eight-blade milling bead was cede, equipped with blades of T-15UB8 alloy. the machine va. steppsfr up to 7,40 revclutiovs per stmt. giving a cutting speed of 307 meters per minute. The feed speed was increased fi cm 30 to 500 millimeters per runts. This 2ved wry enace'sful. The m.chins'B operator was able to mill four sides of a from (1;000 ma z 75 am) in 12 minutes inetsed of 102 minutes as before. This was later cut down to a 9-"hate operatiuL.So far, 22 nilli.ng_machiuee in this plant have been converted to high-speed milling. Ecewcsols of the Moscow Grinding-Machine Plant bale built vo flat-surface grinding machines above plat.. Vcrksre in the foundry, old in the aasesbly, machine and supply shops participated in this task. The machine will be installed in a machine-building plant. &V METAL-CUTTING MACHMS -- Mookovskiy Bolshevik, No 125, 29 May 49 The 0or'ki? Milling-Machine Plant is manufacturing the breckstless 6AS1- milling urchins developed by the INDS (ZXperimental Scientific Institute for Metal-Cutting Machines). The machine is equipped with 50-kilowatt rotors aid can achieve cutting speeds of crer 1,000 asters per minute. - l - NAVY ue ff Sanitized Copy Approved for Release 2011/07/18: CIA-RDP80-00809A000600231085-2 Sanitized Copy Approved for Release 2011/07/18: CIA-RDP80-00809A000600231085-2 MET The "Stankokonstruktsiya" Pler:i le testing a high-speed lathe equipped with 50-kilowatt motors. The machL.e is capable of cutting speeds of over 3,000 meters per minute.. The Plant imeni Voroshilov Is serially producing a high-speed planing machine having a cutting speed of up to 75 motors per minute with electric drive and up to 100 meters per second with hydraulic drive. The All-Union Scientific Tool Insititute has found that the beet alloy for high-speed milling of steel is T15X6 hand alloy. PIANT M=s PZ JWtTIC FAIR AND DRILL -- Ieningrad.eksya Pravda, No 129, 3 Jun 49 The "Pnevmat9.ka" Ramer Plant is now producing the OM-1 and CDl-2 hammers, modernized versions of the OMSP-5 hemmer. These hdmmers, need in coal mines, are 2-3 kilograms lighter than the old hammer. Another new product is t'e RFD[-21 ha er drill, with a speed in hard rook of 160 millimeters ;per minute. The plant '- also producing a high-speed pneumatic mining drill for drilling coal and soft rook. SAMTOV PLANT PRODDING IMPROVND ENGINN -- gomsomol'skeya Pravda, No 51, 3Ver49 The Saratov Machine-Building Plant has begun regular production of improved petroleum engines foe use in rural power plants. The power of the engine has been increased from 15 to 22 horsepower. TARBAOATAT MOTOR REPAIR PIANT IMPROVBS -- Zabaykal'skiy Raboch4, No 83, 29 Apr 49 The appointment in 1948 of a new director, Kuznetsov, for the Terbagatay Motor Repair Plant, Chita Oblast, was the beginning of a g.-eat improvement in the plant's efficiency and production. The plant exceeded the fonrth??nuarter plan 45 percent, recovered all previous losses, mad saved 300,000 rubles. This year, the plant fulfilled the 5-month gross production plan 104 percent on 25 April. The plant produces spare parts ffr MTSs and kol.khozes of the oblact and elan fills orders for gang save for enterprises in ltrasnoyarsk and Irkutsk. CKITA PLANT ISRII? SCIRDULZ -- Zabaykal'skiy Rabochiy, No 63, 1 Apr 49 The Dl'zutuyevakiy Motor Repair Plant, Chita Oblast, has not been meting its monthly production plane. In the first 30 days of March, the plan for motor repairs was fulfilled only 2 percent, and output of scales and spare parts for agricultural machinery has cropped off. As a result, the plant has become a permanent debtor to the State. The main causes for this are the inefficient organization of labor and poa? labor discipline. (here has been no drive acairot dci.`ctive production In the shops, vil tho result that th', foundry has up to 30 percent defective oatpvt. -chine-shop workers put out 150 defective agricultural machine parts In Februr- The plant bee meiy orders to supply spare p.Arta to the oblast'o agricultural establishments, to repair transport vehicles, and to supply the quantity of scales, etc., - 2 - a w n Sanitized Copy Approved for Release 2011/07/18: CIA-RDP80-00809A000600231085-2 ~_ 50X1-HUM Sanitized Copy Approved for Release 2011/07/18: CIA-RDP80-00809A000600231085-2 needed by kolkhotes, but has not been meeting any of these orders. The Chita Oblast Administration of agriculture and the repair trusts must take all measures to effect better organization in this entsrprlae. Sanitized Copy Approved for Release 2011/07/18: CIA-RDP80-00809A000600231085-2