ECONOMIC - MINING

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000600220499-5
Release Decision: 
RIPPUB
Original Classification: 
R
Document Page Count: 
2
Document Creation Date: 
December 22, 2016
Document Release Date: 
June 28, 2011
Sequence Number: 
499
Case Number: 
Publication Date: 
April 21, 1949
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000600220499-5.pdf163.42 KB
Body: 
Sanitized Copy Approved for Release 2011/06/28: CIA-RDP80-00809A000600220499-5 CLASSIFK. . ION CENTRAL INTE INFORMATION FROM FOREIGN DOCUMENTS OR RADIO BROADCASTS COUNTRY Yugoslavia SUBJECT Economic - Mining HOW PUBLISHED Daily newspapers WHERE PUBLISHED Belgrade DATE PUBLISHED Max 1949 LANGUAGE Serbo-Croatian _" SONJO 5Tcs.wna ti,fi"sTtiiii-CCTIi01ii"Miid"non M Tii i9CYD BYiiii' ltHn Tii mYMM OF wins,,, SCT YO W. I. P.. it SAID Iii tNCYMS N M CiiTi?Ti Otl ,as nasa Iin an Yn,,Hiili? pianos m ins. Yugoslav newspapers as indicated. CD NO. DATE OF INFORMATION 1949 SUPPLEMENT TO REPORT NO. MECHAIrIZATIOI USES SALTAGED E3UIPIfW -- Politila, No 13179, 9 Mar 49 last year over a billion diners' worth of unused materials std several thousand Idle motors and mnohinee suitable for use in the meohaniraticns of mining operations were discovered in various mines. These included endless rubber belts, pneumatic haaars, electric drills, and machinery for loading C". According to plane, mechanizaticn is to be introduced wherever the broad- fare method can be employed. Last year, a electrification and wall-sealo bacio mechanization were introduced into the mines to such an etten,c that there is scarcely a working place this year There drilling to done by band. With modern drilling equipment, only 15 minutes are required for dri]]ing ten holes a meter deep, a tank that requires two hours with manual drills. With the pneueatio loading equipment installed at the Ibar mines, 13 pit oars can be loaded in 2 hours instead of the 5 required for loading by band with Showell. In the Aleksimso mine, gateways several meters long ..'ill be out ana shak- ing conveyors installed to transport tha coal to the lowest level, after which it will pass through the main transport road on an endless track. This hauling system will oKt production costs and free about 30 workers for other duties. At the Jelaenica mine the wctn-cat Diesel sogines, which have brought the haul- Ing system to a standstill, will oe replaced by winding engines made at the mine. At Aleksinae, endless rubber belts 2.5 eaters long, which have been in- 64allad for loading the pit cars, have doubled working efficiency. At the Zenica mine, air old chair, system which has lain for deecLds In a heap of scrap iron has been put i_-to eorvice. This equipment speeds damning-off operations by 30 percent and releases nine men for other work. However, it will soon be replaced by more modern equipmen`. The Brastnik mine also has installed mechinary for damming off e=hanated chambers. The Bar miners have' salvaged. an abandoned turbine which had lain fa years In a scrap heap at Trl:ovlje. They re atrad ii, had new parto rode at the "Rode lancer" Factory, and Installed it at Bor, there It now supplements their supply of power for the ccuapreesors and electric drills. STAT Sanitized Copy Approved for Release 2011/06/28: CIA-RDP80-00809A000600220499-5 Sanitized Copy Approved for Release 2011/06/28: CIA-RDP80-00809A000600220499-5 STAT MMTAD COAL 71 = M)D] DIZJS E'Q13IPM MT -- Politila, No 13180, 10 Her 49 Zajecar -- The installation of electric power from the Zvo&dan thermo- electric power plant at the "Rtena" and "Bogovina" mines and the introduction of winding engines at the "Bogovina" mine greatly improved production and the quality of coal mines.. A large ,10-cubic motor compressor ro supply the pit with compressed air was installed recently at the "Dobra l eca" mine, and the "Lubnioa" mine has cheaged over to electric drilling at all working places. The workers' collectives of the Timok coal field in Serbia fulfilled their February production plan 105.7 percent. Almost all the mines in this field not their individualplane. BO MM !J J DUSUM FACIIrrIW --- Politila, So 13176, 5 Mar 49 The Ymlubi,a mine in Bosnia fulfilled its January production plan 100.5 percent and exceeded its February plan by 7.08 percent. Improved mechanisation of the are hauling system and the addition of new railroad tracks and switches are expected to raise production above the planned figme,although new power shovels, locomotives, and compressors and more electric power are badly needed. Although the power plant fulfilled its Febru- ary plan 111.6 percent, it still did not produce enough paver for present needs, mach lees for the spring months, for which the production plans are much greater. Preparatory work has been time toward the construction of a new turbine unit, which is expected to be ready for service in the power plant by 1 May. Boom mm 11onxim PRODUCTIon -- Politilm, No 13177, 6 Mar 49 The Febr cry production plan at the Tares mine in Bosnia was fulfilled, although it was 30 percent greater than the January Plan. Increased production was made possible through further mechanization at the mine, and particularly through improved transportation of ore by means of railroad locomotives. Three brigades of volunteers from the People's Front, who helped fulfill the February plan, will continue to work at the mine during March. CO>mITIODS IKPR0V ) AT VIAD ?1J -- Polltibs, go 13175, 4 Mar 49 The TTborlje coal mine in Slovenia exceeded its February plan by 4.5 percent. Comd:ticne at the sine have been improving steadily since the beginning of the year. laany working places have been mechanized. Nov railroad tracks have been installed to improve the transport or coal. Sanitized Copy Approved for Release 2011/06/28: CIA-RDP80-00809A000600220499-5 ^