BALIKPAPAN - BANDJARMASIN AND BALIKPAPEN - SAMARINDA ROADS

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP80-00809A000500370160-1
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
December 16, 2016
Document Release Date: 
July 21, 2003
Sequence Number: 
160
Case Number: 
Publication Date: 
February 25, 1954
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP80-00809A000500370160-1.pdf99.25 KB
Body: 
25X1 Approved For Release 200W06IU1r?'CZ r?A-RDP80-00809A000500370160-1 25X1 5X1 9*1 25X1 25X1 COUNTRY Indonesia (Borneo) INFORMATION REPORT SUBJECT Balikpapan - Band jartna:-in and Balikpapan - Samarirda Roads DATE DISTR. off. ' e NO. OF PAGES 2 NO. OF ENCLS. SUPP. TO REPORT NO. Or THE UNI TCO ITATCI. S'ITN IN TNC CANING 01 TI TLC 11. ICCT IONI 711 AND 714. OF THE U.C. COOL. Al AMENDED ITS TRANSMISSION ON ICVC. CATION OF ITS CONTENTS TO OA RCC1IIT IT AN UNAUTHORII0D ICRION II lROHI IrtE0 1V LAS'. THE RIRR0DU01I0y_ DC THIN RIPD0T 19 An0NI.I rm. The road between Bandjarmasin and Balikpapan in South Borneo, Be ublic of Indonesia had not been completed in March 1953 The Dutch con- struction company, Iiollandsche Beton Maatschappij, had just completed a stretch of this road from Balikpapan to a point on the east side of the river and just north of Tandjung f2O 11' S - 115? 23' 7. I do not remember the name of this river but Tandjung is on its west bank. While in Djakarta in May 1953 I learned that the Indonesian Government had still not awarded a contract for the road to Tandjung. 2. The completed section is an all-season road about 30' wide and, although unsurfaced, its crushed coral bed can accommodate heavy trucks. Coral for construction can be obtained throughout southeast Borneo up to 30 miles from the coast. The road crosses many small bridges made of uline Sic/ wood. (uline is very strong and does not rot) which are as wide as the road. It also crosses a steel reinforced concrete bridge north of Samu 0 01' S - 1150 57' L7 which is also the width of the road. The entire road has neither sharp curves nor steep grades. Between Tandjung and the river opposite the completed section of the road there is a wagon road, the use of which is limiteu by its rather poor condition and the neces- sity of ferrying across the river to the new section. The road between Tandjung and Bandjarmasin is completed and is very similar to the newly finished se,'c'nn In con- struction, size, and accommodations. 4. -As far as oil exploration cnd field development in the Balikpapan-Tanu3ung area is concerned, the new section of road is sufficient. However. besides the unfinished section, the necessity of ferrying everything from Balikpapan to the near end of the new road is an obstacle to the road's wider use. There is no ferryboat as such and all. material and personnel are handled in whatevrer craft are available. The Government allotted funds for building or buying an adequate ferry in 1951 but as of May 1953 it hadn't arrived at Balikpapan. DISTRIDUTIJN/~- _'iTE ~}( ARMY ~~( NAVY ~~( AIR _1 FC' It115ID-Bv This report is for die use within the USA of the Tntdligm:e eompenents o(' the Depatttnents or Agencicr indicated above. it Is not to be tramm:tted ovFTISIA e40,74 Ibt CADaCYrtcou nj be Qriain.t.W . ether rhrou4:1 CIIv Allitpgt n, irrrtw