TRANSPORTATION SUMMARY FOR MAY 1964
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP80-00247A000800020002-8
Release Decision:
RIPPUB
Original Classification:
S
Document Page Count:
33
Document Creation Date:
December 27, 2016
Document Release Date:
January 15, 2014
Sequence Number:
2
Case Number:
Publication Date:
May 1, 1964
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP80-00247A000800020002-8.pdf | 1.41 MB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
I
SECRE13
NO FORM DISSEM
T r a n ? oy t a t i on S umm a r y
f' OT
1. 964
fCtia-FREVI
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
50X1 -HUM
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
?
SECRET
2 -
Tranuortation Summary
- r fo_Ma.1 1964
----------- ,_______
Summary.
I. International Transport-Relations
Increase of carrying capacity of railroad bridge over Danube
dliver at Cernavoda.
Conference betWeen experts of Czech, Hungarian and Soviet
water control departments on Czech/Hungarian Danube power
plants at Gabcikovo and Nagymaros.
Prior to August 1964, no German participation in Soviet Danube
- sea transports.
Details on Soviet Bloc common freight car pool (OPW),
operations on 1 June 1964,
including beginning of
50X1 -HUM
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part- Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 3 -
50X1-HUM
II. USSR
Transportation performance by individual modes of transport-
ation in 1963.
Data on operations and performances in 1963 railroad trans-
portation.
Average daily performance of individual train traction
systems in 1963.
Average distance covered by essential commodities in 1963
freight traffic.
.Completion of last stretch of Central Siberian Magistrale
from-Kzy1=Tu to Irtyshsko and opening of work train traffic.
Opening of provisional passenger train traffic on Sverdlovsk
Konda Railroad Station stretch of new Ivdel' - Ob line.
Opening of test traffic on new Chulak,Tau - Dzhanytas rail-
road line (branch line and/or extension of Karaganda -
Tashkent main line).
Construction of mono-rail suspension lines in Moscow and
Kiev,
As of January 1964, new regulations for cross sections of
ballast profiles according to density of freight traffic.
1963 electrification of railroad stretches.
Completion of second electric .railcar train.
Employment of first gas turbine locomotive for main line
traffic.
Railroad ties factories and annual capacity.
Transportation performances of motor vehicle transport in
1963.
Planned 1964 transportation performance within operating
range of Ministry for Motor Vehicle Transport and Roads of
RSFSR.
Highway construction between 1959. and 1963, and 1964/65
construction plans.
1963 road construction and roads opened to traffic by -State
Committee for Transport Construction.
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
III. SOviet.one of Occupation of Germany
- Putting into operation of new train reversing facilities
at Alexanderplatz S-Bahn station.-
- New rolling stock of VEB Berlin Traffic Company.
- No construction of new U-Bahn stretches in East Berlin
before 1970.
- Dismantling of unused track 8 of Neuk011n MittenwaIde
railroad line on Soviet :_one territory.
50X1 -HUM
- Additional interzonal trains via Helmstedt and 'Jolfsburg
during .1964 summer timetable.
President Brandt of Reichsbahn division Greifswald to
attend training course, temporarily replaced by Vice-
president Mack.
- Operational situation affected by Deutschandtreffen der
Jugend (German. Youth Meeting) in East Berlin and by increased
'ihitsun traffic.
- Temporary increase of penalties in freight train service.
In April 1964, transportation plan fulfilled 95.8 per cent
only.
- Light military demand on Reichsbahn.
- Drewin - Neustrelitz stretch of Line 121 put into double-
track operations.
- Completion of double-tracking of Dannenwalde FUrstenberg
(Havel) ? stretch scheduled for the beginning of 1964/65
winter timetable.
- New Stretch between Rostock Overseas Harbor and Kavelstorf;
automatic electric block system on -Nustrelitz main station-
Lalendorf stretch of Line 117 taken into operation..
- Line 162a between branching-off point "A: " near Sedlitz
and branching-off point Sornoer Buden West near Bahnsdthrf
put into double-track operation.
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
?
SECRET
S.
- Electrification of Weissenfels - Erfurt and Erfurt -Neu=
dietendorf stretches of Lines 180/192 to be completed by
1967.
- Renovation work on Line 162.
Exports of VEB Schienenfahrzeugbau (rail vehicles) from
1961 to 1963.
- Production of VEB LEW Hennigsdorf.
- Reichsbahn stock of electric locomotives.
- 'Construction work on roads and bridges connected with
autobahn Berlin - Dresden and Highways 1, 102, 115,246A
and 281.
- Maintenance work on dendisch.Rietz,Bischofswerder,Alt
Friesack and Learen locks.
- Expanded 1964 summer program of Stralsund .'White Fleet
to include daily cruises to Swinemande (Swinoujscie),
Stettin (Szczecin) and Hisdroy (Miedzyzdroje); Polish
Passenger Fleet to call Soviet zone 'ports,
IV. Czechoslovakia
- Training of young railroad personnel.
- Beginning of construction
gauge stretch.
- Starting of operations
work on Vojany - Haniska broad-
on first stretch of the Ostrau/
Kuncice - Polanka n.O. line.
- Installation of electronic remote control of switches and
signals at Strba station.
- tlectrification of BrUx (Host) Aussig (Usti n.L.) stretch
and alternative stretch Brlix Louka n.L. Oldrichov;details
on plan changes until 1965.
Testing of new diesel locomotives of
T-444.1 on closed Velim test line..
- One million tons of coal transported
Bohemian brown coal area.
types T-669.001 and
by trucks from North
- Extension of Furth im :alde - Vollmau (Folmava) border
crossing point.
- Opening of now busline service from Pilsen (Plzen) to
Frague/Ruzin airport.
- Resumption of inland shipping on Elbe and Moldau rivers.
- Improvement of civilian air service Prague - .i.arsaw and
Prague - Moscow.
road
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
I.
SECRET
- Two jet passenger aircraft of type TU124 bought for
Czechoslovakia.
- Putting into operation of first section of branch pipeline
of USSR -Czechoslovakia crude oil pipeline, in mid-May
1964.
V. Toland,4ncludlag German Territories under Polish 'Administration '
- During first quarter of 1964, Polish State Railroads
transported 219 minion passengers and 74.5 Million tons of
freight,.
Four-track operations on Pruszkow -Glodzidk stretch of '4arsaw- -
Czestochowa Line.
- In late April 1964, about 1,700 kilomdprs of tracks electrified.
- On 28 April 1964, arrival of first electric train at Medyka
railroad station after completion of last stretch of Katowice-
Krakow - Przemysl ore magistrale,
6ince early April 196k, tracks and ties of Sierpc - Plock
stretch being replaced, possibly in preparation for planned
electrification of Sierpc 1-utno line.
- 1964 work on tracks and track maintenance concentrated on
following lines: Gdynia - Karsznice - Tarnowskie Gory, Lublin-
Radom Tunel, ,arsaw - Radom, Poznan - Rawice, Belgard -
Lauenburg.
- Closing of lines in April and liaj- 1964 as well as rerouting
of trains during 1964 as a result of track maintenance
work,
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 7 -
I.:International Transp.ort Relations
1.Interweavin_E of Soviet Bloc Transaortation
_ _ _ _ . _ . _ _ . . . _ _ _
a) Danube River
Work ? is under way to increase the carrying capacity of
the railroad bridge (Danube Kilometer Marker 300)
between Cernavoda and .Fetesti (Rumania)..
In late April 1964, in..Bratislava (Czechoslovakia),
Ctech,-HUngarian, and Soviet experts of water control.
departments ? discussed technical and economic problems
of the Czech-Hungarian Danube' power plants at Gabcikovo
(Czechoslovakia) and Nagymaros (Hungary):, The particip-.
ationlof a Soviet group of experts, headed by Chief
Engineer G.M.Petrov (Moscow) is indicative of the
distinct Soviet influence in the discussions.
The general Soviet influence in Danube shipping is also
evident from an early May 1964 note of the management
of the Soviet State Danube Shipping Company (SDGP) to
the Fest German teamed-up Bayerische Lloyd A.G.
ReL;ensburg and the firm of Wanner, Deggendorf, indicat7-
ing that no German participation in Soviet Danube- sea
transports is envisaged 'before August 1964,
b) pPW:(0b.shchil_park.VaRonov)_. Common Freight Car Pool
-
The following details have been learned on the Common
Freight Car Pool:
(1) The headquarters of the OPT Council (managing board)
is in Prague; director of the Council is Josef
Pospisil, of Czechoslovakia._ The first Council
meeting took place in Brno, Czechoslovakia, in late
April 1964,. under the chairmanship of A.Denev, of
Bulgaria.
(2) Experts of all member railroads are to be delegated
to the central planning office (also dispatcher or.
operating office) in Prague. This office will
consist of four departments (dispatcher service,
planning, accounting and secretariat departments),
with a total staff of about 50. Operations of the
central planning office are to begin on T June 1964;
the first transports of OPW cars are to start on
1 July 1964.
The main difficulties in the starting of operations
of the common freight car pool are being experienced
in the following:
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
8-
- Making available the necessary number of Uniforin
and technically satisfactory freight cats.
- Selecting and designating these.
- Establishing an appropriate communications system
between the operating office in Prague and the central
car control offices of the member railroads, as a
prerequisite for an effectively controlled car pool.
This problem was the subject of a meeting of tele-
communications experts in Leningrad, in mid-April
1964, who discussed the establishment of a dispatcher
communications system within the seven railroad
administrations (Bulgaria, Czechoslovakia, Poland,
Rumania, Soviet Zone of Occupation of Germany,
Hungary and USSR) of the common freight car P5050-HUM
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8 .
50X1 -HUM
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
R
Next 1 Page(s) In Document Denied
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
11 -
II, USSR
1. Total Tranuortation
? ? ?SMI.M.A ? ??? ? ? ne.n..e..
The following transport performances were
.the individual modes of transportation:
achieved by
Freight Movement Performance Fulfillment
?(Billion Metric of Year's
Ton Eilometers(tkm) Plan (In
Percentagp)
Railroads 1,745 -104
Inland Shipping 114 100,3
Motor Vehicle
Transport 119 102
Crude Oil Pipelines 91 103
Million Metric Tons
Incease as
against
1962 (In
Percenta&e)
6
4
8
22
Carried
Railroads
2,144
101
4
Inland Shipping
239
103
4
Motor Vehicle
? Transport
9,600
100.4
4
Pipelines
185
103
12
2.
Railroad Transportation
a) (1) General Operational and Performance
Freight movement
(Billion tkm)
Million metric tons carried
Billion passenger kilometers
Million passengers conveyed
Data for .1963
Fulfillment Plan
.1.745
2.144
192
2.100
1.680
2.139
190
2.138
New lines put into operation
(km)
616
425
Lines double-tracked
500
516
General overhaul of lines
(km)
7,000
7.000
Laying of new heavy rails
(km)
9.000
9.000
Laying of seamless tracks
(km)
12.000
12.500
Ballasting on gravel (km)
7.600
7.500
Laying of reinforced
concrete ties (km)
1.000
Equipment of lines with
a) automatic block and
dispatcher interlocking
installations (km)
2.200"
2.130
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 12-
b) semi-automatic block
Installations (km) 10,600 10,000
Electrification of lines
(km) 2,198 2,174
including alternating
current (km) 1,255
Length of -electrified lines
as of 31 December 1963 (km) 20,400
including a.c. (km) 4,500
Dieselization of lines (km) 7,000 7.000
Length of dieselized lines
as of 31 December 1963 (km) 42,600
Handing over of industrial
spur tracks (km) 12,000 20,000
Total line network
as of 31 December
Average weight of
train (tons)
Average load of a
.car (tons)
.Standard axle pressure on
. a rail (tons)
_Average turn-around time
of a freight car (days)
Average parking time of a
freight car (hours)
Average distance covered
daily by a freight car
(km)
Aveage transport distance
per ton (km)
Production and/or supply
of rolling stock:
'Electric Magistrale
locomotives .(units)
Diesel liagistrale
locomotives .(sections)
Passenger cars (units)
(including 1,064 cars
electric railcar trains
and 950 cars for inter-
national passenger train
traffic). .
Freight cars (units)about
Share of high-capacity
freight cars in total freight
?car pool (percentage)
'share of electric and diesel
_locomotives in total freight
movement (percentage)
1963
(km)
a freight
freight
for
139,000
2,267 _2,225
59
21
5.59
21.9
SECRET
233.5
814
643
5.47
791
800
1,517 1,500
3,700
35,000 35,000
94
71 70
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 13 -
Fuel consumption for each
10,000 tkm of:
Steam locomotives
(kilogram) (kg) 199.4 202
Electric locomotives
(kW/h) 145.5 148.3
Diesel locomotives (kg) 47.8 50.0
(2) Average daily performance of individual train
traction systems (locomotives) in 1963
(Figures in parenthesis apply for 1962):
Electric Diesel Steam_
Average daily distancQ 586.5 504.0 315.5
covered (km). (579.0) (491.0) (315.0
Average daily transport 1,182.0 1,099.0 422.0
performance (1,000 (1,169,0)(1,056.0) (433.0)
gross tkm)
Average running time 731.0 693.0
per day (minutes) (726.0) (688.0)
Average load of a 2,516.0 2,449.0
freight train (tons) (2,468.0)(2,406.0)
(3)
Average transport distance in freight traffic,
in 1963 (Figures in parenthesis apply for 1962):
All goods 814 km ( 797 km)
Including:
Bituminous coal
Coke 698 u 678 It
700 II 684 u
Crude oil goods 1,317 li 1,332 u
Ore 581 uII
H52 71 "
Fe 1,202
rrous metals ii
Timber 1,585 if 1,520"
Mineral structural material 380 ( .381 " 1
Fertilizer 1,211 H (1,099 il
Grain 937 n ( 955 II
Miscellaneous goods 923 II ( 895 il
b) Railroad Line Network
(1) The last stretch of the Central Siberian
Magistrale was completed between Kzy1=Tu and
Irtyshkoe and has been opened to work train
traffic.
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002:8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 14-
(2) Passenger train traffic has been opened between
Sverdlovsk and Konda Railroad Station (Kilometer
Marker 225) on the Ivdel' - Ob line, which is still
under construction. Train traffic is to be
extended as far as Kilometer Marker 331, not far
from Ob River, still in 1964.
Test traffic has been opened on the new dieselized
70 kilometer Chulak"Tau - Dzhanytas line. This
stretch is an extension of the Dzahmbul - Chulak=
Tau line branching off from the Karaganda - Tashkent
main line. It is mainly to serve the transportation
of phosphorite from the Karatau district. By late
1964, the new line is to be extende'd to its terminal
at Kar'ernaia.
Construction of the first mono-rail suspension line
in Moscow is to begin soon. The first stretch is tm
extend from near Subway Station Avtotsavodskaia to
Kolomenski town district. Later-on, the line is to
be extended as far as Domodedovo airport. The
distance between the individual railroad stations
will be four to five kilometers. Trains will
attain speeds of up to 150 km/h. The capacity of a
railroad car will be 100-120 passengers. The city
of Kiev also plans to construct a mono-rail line, .
which is to operate between the future Gidropark
subway station and Borispol airport.
(3)
(4)
c) Roadbed Construction
Effective January 1964, the following cross section
profiles for ballasting have been introduced according
to freight traffic density:
Depth of Ballast
Annual Gross Type of
Density of Traffic Roadbed
(1) On lines with wooden ties:
35 centimeters (cm) of ) over 50 million Partic-
gravel, or, ) tons per ularly
20 cm of sand ) kilometer ? heavy
30 cm of gravel, or, ) 25-50 million heavy
20 cm of sand ) tons per km
25 cm of gravel, or, ) below 25 million normal
20 cm of sand ) tons per km
(2) On lines with reinforced
concrete ties:
Raising of ballast by five centimeters,
respectively.
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 15-
d) Electrification
In 1963, a total of 2,198 track kilometers were
electrified. They included the following stretches
which have been put in operation:
- Likhaia Rososh' (277 km), on Rostov - Liski line
- Perm - Shalya (248 km)
Kirov - Shakhun'ya(224 km)' on Sverdlovsk - Moscow
line
(with Kotel'nish - Svecha connecting line)
- Artyshta Altaiskaya (200 km),
- Cherepanovo
- Yasinovataya
- Maloyaroslavec
- Nevinnomyskaya
on South Siberian
Magistrale
Barnaul (157 km), on Novosibirsk -
Altaiskaya line
Mariupol (149 km), Donets Basin
- Zukhinichi (140 km), on Moscow -
Bryansk line
- Mineral'ne,Yody (1o7 km), on Rostov
- Baku line
on Dnepropetrovsk-
Lvov line
(97 km), on Kuibyshev - Syzran line
on Tbilisi - Baku line
- Mironovka - Fastov (100 km),
- Otvaga - Syzran'
- Akstafa - Kirovabad (95 km),
- Nadezhdinsk -
- Mezhdurechensk
- Yasinovataya
- Khacepetovka
Usurisk (81 km), on Vladivostok -
Khabarovsk line
- Novokutsneck (64 km), on South
Siberian Magistrale
Konstaninovka (55 km) Donets Basin
Krinichnaya (50 km)
- Minsk Olekhnovichi (48 km),
- Sevan Razdan (12 km), branchline of Leninakan -
Baku line.
on Minsk - Vilna line
d) Rolling Stock
(1) The Riga and Kalinin car factories have recently
completed the second electric railcar train.
This train is equipped with an automatic train
control installation; engines and brakes have
automatic electronic control. The train 'consists
of eight cars, runs on direct current and attains
a rated speed of up to 130 km/h. Each car has
a length of 24.6 meters and three doors on each
'
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part- Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 16 -
(2) After several years of testing, the first gas
turbine locomotive for freight trains has been
put into regular service. The 3,200 PS locomotive
was constructed by the Kolomna machine building
plant. It operates on heavy fuel, including masut
(fuel oil). Further gas turbine locomotives,
powered between 69000 and 8,000 PS, are to be
built and put into service between 1966 and 1970.
f) The following production figures were learned on Soviet
plants for the construction of reinforced concrete
ties:
Location
Planned Actual -
Annual Production
Capacity
Lliamtity) (Quantity)
(1) Plant scontrolled by
Transort MinistryKiev
300,000
60,000
115,000
290,000
355,000
1059000
250,000
45,000
100,000
400,000
500,000
150,000
(5025N/3035E)
Lvov (4950N/2400E)
Starokonstantinovka
(494511/2720E)
Beslan (4310N/4430E)
Kremenchug
(4905N/3325E)
Almatsnaya
(4831N/3835E)
(2) Plant Controlled by State
Committee for Construction
of Transport Equipment
(Former Transport Construct-
(3)
Chelyabinsk-
(5510N/6125E)
Korosten!
(5100N/2835E)
Baku (4025N/4950E)
Sergelinsk
Silikatny
(5528N/3734E)
280,000
280,000
160,000
280,000
100,000
300,000
300,000
300,000
300,000
Plant Controlled by Ministry
for Construction of Lithuanian
Kbnigsberg
(Kaliningrad)
(5443N/2030E)
SECRET
124,000 124,000
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part- Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 17 -
In 1964, the number of concrete
to 2,449,000. This demand will
of the three controlling bodies
ties required amounts
be met by the plants
as follows:
1,225,000
1,100,000
Plants of the Transport Ministry
" State Committee for
Construction of
Transport Equipment
Plant at Kaliningrad
3, Road Tranuprtation
a) Motor Vehicle Transport
? . _ ? Ma
124,000.
(1) In 1963, the freight movement' of the total motor
vehicle transport amounted to 119 billion metric ton
kilometers (tkm), and the freight carried to 9.6
billion tons. The transportation performance in
passenger trafficaTounted to 95 billion passenger
kilometers, and the number of passengers conveyed to
15.6 billions.
(2) Planned 1964 transport performances within operating
range of Ministry for Motor Vehicle Transport and
Roads of the RSPSR.
- Freight niovement
- Volume of freight
- Passenger movement
- Passenger conveyance
169300 million tkms
958 million tons
50,200 million passenger kms
3,500 millions.
b) Road Construction
(1) Between 1959 and 1963, a total of 93,700 highway
kilometers received a solid surface. 1964/65 plans
envisage the construction of 877 kilometers of state
roads, 6,133 kilometers of republic and rayon roads,
and 18,000 kilometers of local roads.
(2) The State Committee for Transport Construction (former
Transport Construction Ministry) built 1,198 kilometers
of highways in 1963.
The following highways were opened to traffic:
- Noginski - Gorki (348 km)
- Kokchetav - Balkashino (110 km)
(stretch of the grain transport road under construct-
ion from Petropavlovsk to Atbazar via Kokchetav
(newly developed region).
- Petrokrepost' Volkhov (110-kilometer stretch of
the Leningrad - Murmansk highway),
- Mukhtuya - Mirny (249 km in Yakutsk ASSR).
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
cnyl_wimA
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 21.-
III. Soviet; Zone of Occupation of Germany
1.
Berlin Traffic Situation and Interzonal Traffic
Berlin Traffic Situation
(1) In late May ..1964 new train reversing facilities vere
put into operation at Alexanderplatz -S-Jlahn
station. The new station building had already been
handed over to traffic on the occaSion of the
erman Youth Meeting. These now reversing
facilities enable the operation of trains up to
'lexanderplatz, formerly running as far as
Borlin.Ostbahnhof only.
(2) (a) Since 1959, the VEB Berlin Transport Company
in East Berlin has put into service 114 new
streetcars and almost 400 reconstructed
streetcars.
In addition, 51 now buses were bought,and
30 S-Bahn cars, converted to-subway'operation
nt Reicbsbahn Ren-ir Shop Berlin SchOneweide,
wore
'incorporated into the subway net.
(b) Due to the high demands on finances and
construction capacity, the construction
of now subway stretches in East Berlin has
to be postponed until at least 1970.
SECRET
50X1 -HUM
50X1 -HUM
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part- Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 22 -
50X1 -HUM
2. Railroad Transportation
a. Personnel
Reichsbahnhauptrat -Jailer Brandt, President of
Reichsbahn Division Greifswald, has been relieved
from his functions as such for a long-term training
course.'' Reichsbahnoberrat Mack, Viceprosident of
the Operational Service of Reichsbahn Division
Greifswald, has been ordered to take over temporarily
from President Brandt.
In 1954, at the age of about 25 years, Brandt became
head of the former Reichsbahnamt (Pba) Berlin 5, sub-
sequently of Rba 6 and,5/6, and from 1957 to
1959 of Rba Berlin 1. Before 1954, he was deputy
of the head of the former Rba 5. On 15 October 1960,
he became Vicepresident of Reichsbahn Division
Greifswald and; on 1 February 1962, President of.
Reichsbahn ipivision?Greifswald: During his training
course Brandt is to get the qualifications for his
present job.
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 23 -
b. (1) The operational-situation of the Reichsbahn was mainly
influenced by the special train traffic for the so-
called Deutschlandtreffen der Jugend (German Youth
Meeting), held in East Berlin between 16 and 18 May
1964, and by increaSed traffic at Whitsun.
On the oceasion of the German Youth Meeting, 111
special trains, mostly made up of converted boxcars, ,
some of them prepared for the occasion as early as
April 1961-f, parried about 182,000 passengers.
Most of the special trains arrived within 16 hours
at 12 Berlin railroad stations, including Berlin=
Karlshorst, Friedrichshagen, Kaulsdorf, Lichtenberg,
Adlershof, Greifswalderstrasse, Frankfurthr
Berlin.Ostgtitebahnhof and Jr.iezener Bahnhof; on
16 May and during the night of 16/17 Nay 1964. After
the end of the German fouth Meeting, the trains required
about the same length of time to pull out of Berlin.
In order to guarantee an even demand on transport
capacity and to avoid arrears in the transportation
plan during the May holidays, the Soviet Zone Central
Transport Committee doubled the penalties for
cars not claimed by the consignor, and
deficiencies in the number of cars not made available
by the Reichsbahn
during the period from 1 to 10 and from 16 to 20 May
1961+.
Special importance is being attached to full utilization
of the transport capacities after Under Secretary
ScholL:, Deputy Transport Minister, in a speech to the
heads of the Nain Administrations of the Transport
Ministry and Presidents of the Reichsbahn Divisions
and other functionaries on 22 May 1964, stated that
the transportation plan was fulfilled by 95.8 per
cent only in April and that the present performance
figures were inadequate to guarantee the fulfillment of
the 1964 Plan.
(2) Military demand on the Reichsbahn. mostlj. by the
,oviet Army. Between 1 and 20 May 1964; only sporadic ?
military transports were carried out by the Reichs-
bahn. In spite of intensified exercise activity around
20 May 1964, the required railroad shipments, in-
cluding transportation of tanks, did not impede
Reichsbahn operation's.
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
-24-
c. Construction and Renewal
f. Tracks
(1) (a) The Drewin Neustrelitz stretch of Line 121
(.6erlin - Rostock) has been in double-track
operation since 17 March 1964.
On the Lowenberg (Mark) - 6.ransee stretch of
this line, double-track operation started with
the beginning of the 1964 summer timetable
(31 Nay).
The Gransee - Dannenwalde stretch has been
double-tracked since 1962; the FUrstenberg (Havel)
- Drewin stretch has been double-tracked since
18 September 1963. For the time being, the Dannen-
walde FUrstenberg (Havel) stretch of this line
remains single-tracked.
Double-tracking of this latter stretch is to be
completed by the beginning of the 1964/65 winter
timetable.
(b) On 31 May 1964, the 12-ki1omAr long new stretch
Rostock Overseas Harbor ?- Kavelstorf (Line 117)
and the auto:aatic electric block system on the
newly constructed Neustrelitz main station - Lalen-
dorf Stretch (Line 117) was put into operation
within the framework of the Berlin -;Rostock freight
line.
(2) Since 21 April 1964, the stretch between branching-off
point Ac (close to stop Sedlitz Ost, about four
kilometers northeast of Senftenberg) and branching-off
point fiornoer Bilden West (about three kilometers south..
west of Bahnsdorf stop) has been in double-track
operation.
This is a newly constructed stretch, including the
single-track connection between branching-off point
')ornoer -buden Nord- (until 21 1964: branching-,off
point Bahnsdorf) (close to Bahnsdorf stop) and '
branching-off point Sornoer uden West.
A new signaling tower ''Sornoer Buden", equipped:with
trackage projection screen, replaces the previous
signaling towers at Bahnsdorf station and at the former
branching-off point Bahnsdorf. In addition, light
signals have been installed instead of the mechanical
signals.
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
(3)
SECRET
- 25-
Neupetershain (kilometer 59:5 58.5)
Bahnsdorf stop (kilomjter 55.9 - 54.3)
Branching-off point Sornoer Buden Nord (former
.branching-off point Bahnsdorf, kilometer 54.6)
i 'ID. Branching-off point Sornoer Buden Ost(?)
')'
// --
/ . (to Bluno)
0-
Branching-Off point Sornoer Buden West (kiloatbr
52.8)
Branching-off paint Ac. (kilomter 50.2)
Sedlitz Ost stop (kilomr 49.8 - 49.75).
Line 162a (Cottbus - Ruhland) is now double-tracked :on
the following stretches:
- Branching-off Geisendorf - Neupetershain(close southwest
of prebkau),
Branching-off bornoer Buden West - Branching-off Ac,
- Senftenberg Briese.
The electrification of the stretches Weissenfels - Erfurt
of Line 180, and Erfurt - Neudietendorf of Line 192, is to
be completed by 1967.
Construction, of the foundations for the overhead
to start: in 1965, mounting of the contact.line'in 1966.
Near Grossheringen (Lines 180 and/or 188) and at Weimar station,
new major bridge structNres are required for the crossing
with other-lines.
In addition, anew signaling tower with trackage projection
screen as well as a power substation for the power supply of
the. Bad Kdsen Neudietendorf stretch are to be erected in
Weimar, .The Weimar substation is to be linked up by a 110 kV
line to' the Reichsbahn power net in Gross Korbetha (Line ?180).
.(4) Since March1964, intensive renovation under way on Line 162
has been resulting in temporary r6strictions.in passenger
traffic.between -LUbbenau and KOnigswusterhausen, necessitat-
ing.the employment of buses.
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part- Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 26--
In April 1964, the following new tracks were taken into
operation:
- Lubolz - Llibben main station (29 April)
- Lubben main station - Ragow (8 April).
No inclications are available indicating double-track
operation. Of Line 162, therefore, only the following
stretches are double-tracked:
- Berlin.Schoneweide Berlin.Grlinau,
- Teupitz,Gross Koris - Halbe,
- Brand (Ndl) - SchOnwalde (Spree).
d. Rolling Stock
(1) (a)
Between 1961 and 1963, the nationalized Soviet Zone
factories engaged in the. construction of railcars
have exported, among others, the following vehicles:
3,310 passenger railroad cars,
2,379 refrigerator cars,
1,177 icebox. cars
507 rail motor cdrs.
(b) These rail motor cars were mostly electric ?locemotiveS
for industrial purposes manufactured by VEB LEW (Lokbau
und Elektrotechnische ilerke) "Hans Beimler", in -
Hennigsdorf. (The export of electric locomotives.
amounted to 221 units in 1961, and to 156 units in
1962).
(2) (a) In September 1963, VEB LEW, Hennigsdorf, allegedly
turned out "one heavy locomotive for industrial
purposes daily,"presumably, electric locomotives with
a weight exceeding 60 tons. 'Until 31 October 1961?,
2,000 locomotives of this type were manufactured.
Since mid-1963, VEB LEW is todeliver.one industry
electric locomotive of 150 tons
weight every other day.
(b) The production for the need of the ReiChsbahn is
still lagging far behind the production for industrial'
purposes, especially with respect to the fulfillment
of expdrt commitments. From late 1962 to late 1963,
appreximately, 75 electric locoMotives of construction
series E 11 and E 42 (15 kV16 2/3 cycles a,c,) were
delivered-.
Allegedly only 25 locomotives of these types are to
be built under the 1964-productien. plan.Consequently,
the Reichsbahn would have approximately 100 locomotives,
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 27 -
of the above-mentioned types at its disposal in early
1965.
Added to the about 100 reconstructed electric loco-
motives, the Reichsbahn pool of electric locomotives
will consist of 200 units by early 1965.(-?or survey
of the existing types see tabulation in Annex 1).
Since this pool is inadequate for the current
electrification and future extension of the electrified
net, an increase in the production program seems
probable. It is possible, however, that stronger electric
locomotives will be developed in the meantime. 50X1 -HUM
By 1977, about 1,200 electric locomotives are to
be available for 4,500 kilometers of electrified
lines.
For the planned manufacture of the zero series of
25 kV 50 cycles a.c. locomotives, of which so far only
two test locomotives are available(DDR test locomotives
I and II), 50X1 -HUM
3. Road Transportation
Road Construction
On the Berlin - Dresden autobahn, and on Highways 1, 102,
115, 246 A and 281, the following construction projects
are under way, have already been completed, or are planned
for the imminent future,
a. Berlin- Dresden Autobahn
The auxiliary autobahn bridge (PC 251 242,autobahn
kilometer 85.2), located 200 meters south of the Bronkow
autobahn branching-off point, is being replaced by a new
pre-stressed concrete bridge. The bridge spans the
secondary road (LII0)-from Bronkow (VT 2525) to Lipton
.(VT 2522)..
The two lanes of the about 3-kilometer long Ruhland
(VT 2101) - Ortrand (VS 1492) autobahn stretch are to
be repaired by late 1964. Repair Work is impeded by the
obsolete construction machine pool and by the shortage
of personnel and construction material...
SECRET
- Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part_- Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
b. F-1
The F-1 is at present being improved between Plaue
(UU 2409) and the district border of Potsdam,southwest
of Bensdorf (UU 1911) near UU 1610.
Repairing of. Plaue bridge, located on F-1, will start in
June 1964, Since November 1963, there is a 6-ton limit
for vehicles crossing this dilapidated bridge..
c, F-102
?
Construction work on the Brandenburg-Fdhrde (UU 2918)
stretch of F-102 was completed in the spring of 1964
after a 18-months building period. The road has been
widened to about 7.50 meters, partly been straightened,
and received a concrete surface. F-102 is now closed
between DOberitz (UU 2222) and Pritzerbe (UU2719) for
about six kilometers for repair work. The entire F-102 is
in a poor state of repair. Improvement of the highway has
been planned for years.
11-11 .
After completion of a 3-kilometer long and 7-meter wide
by-pass .road at Vetschau (VT 3637) in September 1962,
the about 20-kilomter long Vetschau-Cottbus stretch, which
is in a poor state of repair, is being improved since
mid-1963. Progress is slow.
F-246a
By integrating primary roads (LI0s) in the Eagdeburg
district, a new highway, the F-246a, has been created as
a by-pass around Magdeburg.
Running in a semicircle south of idagdeburg, it extends
from Burg (PC 9595) via H6ckern (Q,C 0281) - Schdnebeck
(PC 8866) - Vlanzleben (PC 6771) - Seehausen (PC 5774)
to the Eilsleben (PC 548 855) branching-off point of the
Berlin - Helmstedt autobahn, near autobahn kilometer 114.1.
To make F-246a suitable for heavy traffic, the stretches are
being widened and straightened and partly rerouted.
Construction work under way on various stretchesbetween
Burg and ';felsleben (PC 8165) has resulted in closing of
roads to traffic.
f. F-P81
Host .of the 39-kilometer long stretch between Saalfeld
and Triptis (7LB 0225) will be rerouted and widened to
8.50 meters. In ad:ition, a number of by-passes are
scheduled. .:Jork will begin on the Possneck (PB 8319) -
Kolba (PB 8922) stretch. in 1964, excavation work and
the base of the about5-kilometer long project are to be
completed. In order not to impede traffic,temporary roads
have been constructed as by-passes in some places.
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 29
Inland squilu and Passenger Coast Shippina
a (1) Major repair work is at present being carried out
at the -endisch,Rietz lock (VT 321 855) (kilometer
22,7).
In this -connection, the Spree-Oder-Neisse Water
Control Department in Cottbus' hasordered the blocking
between kilometer 22.6 and kilometer 22.9 of the
entire ship and boat traffic from September 1964 to
May 1965.
The lock is located on the canal, connecting ScharmUtzel-
see Lake (or 'Wolgensee Lake) with Gross Storkowersee
Lake. These two lakes are part of the "asserstrasse
Storkower.Gewasser (waterway Storkow waters), which
is navigable for ships up to 180 tons.
At the same time, the road bridge over the canal
in Vliendisch,Rietz (VT 321 355) is being rebuilt in
connection with the primary road Bad Saarow - F-246
(point VT 323 847).
(2) At Bischofswerder lock (UU 912 617) of Voss Canal,
intensive repair work was carried out in early 1964.
New lock gates were installed after completion of
repair work on the concrete lock structures. The
repair has been completed in the meantime.
Voss Canal is navigable for ships up to 270 tons
carrying capacity. Connecting the Oder-Havel Canal
with the Havel River, it runs from about Liebenwalde
(UU 9259) to Zehdenick: (UU 8972) in easterly
direction parallel to the Havel River, which has many
bends in this area.
(3) From early April to about mid-May 1964,'Laren lock
(UU 848.895).in the Havel River was closed to traffic
because the lock gates were in need of repair.
Due to repair work on the Bischofswerder and'Laren
locks, shipping between. the Berlin area and Mecklen-
burg was closed for vessels of over 270 tons-
(4) At Alt-Friesack (UU 580 566) lock located between
Ruppinersee Lake and BUtzsee Lake,, renovation work
was carried out for two months until April 1964.
b. The VEB Passenger Shipping Agency "White Fleet ? in Stral-
sund, which maintains branch offices in various localities
on the Baltic coast, on Rugen Island and Hiddensee Island,
has increased its fleet by five vessels to a total of
37 in 1962. A total of 1.414,000 passengers were transported
in regular line service and excUrsion cruises in 1963.
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
-30-
For the first time, the 1964 summer timetable of the Baltic
:tesort line service provides for cruises to SwinemUnde "
(Swinoujscie), Stettin (Szczecin) and Misdroy (Miedzyzdroje)
(See Tpt. Summary for March 1964).
Tourist. day cruises with the possibility to go ashore for
three hours are being planned.
also the Polish.passenger fleet scheduled day cruises ,
with three-hour land-excursions, to various Soviet Zone ?
resorts on the Baltic coast during the 1964 summer season.
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Reichsbahn Pool of Electric Locomotives in Late 1963
Annex to Tpt. Summary for May 1964
Construction Wheel Operational Maximum Performance Sustained Number of Maximum Units Remarks
Series Arrange- Weight Axle kV km/h Performance Driving Speed
ment tonqglega Pressure kV km/h Engines km/h
poun )
a. Reconstructed electric locomotives (the other 60-70 reconstructed electric locomotives have been or are being scrapped)
E 04 l'Col' 92 20.5
E 05 l'Coll- 90 20.1
E 17 1'Dol' 111.7 20.2
E 18 l'Dol' 108.5 19.6
E 21 21Do21 121.8 19.6
E 44 BotBol 78 19.5
E 77 (113)(B1) 113 19.8
E 94 colco, 118.5 20.0
E 95 lico-c011133.5 19.8
b. New ele6tric locomotives
E.11(C002 31) Bo'Bo' 82.5 20.6
Bo'Bo' 82.5 20.6
E ileggi)
E 11(00Z\
) Bo'Bo' 82.5 20.6
E 42(2(2.12) Bo'Bo' 82.5 20.6
E 42(2Q.
) Bo'Bo' 82.5 20.6
LEW I and II Cot Cot 122 20.3
(DDR test)
25 kV/50 cycles
*) observed ,2 in operations in late 1963
**)observed in operations in October 1963
29190
98
2,010
2,160
97
1,785
2,800
89
3,040
117
2,840
2,840
88
2,040
2,200
76
1,860
1,88044
1,600
3,300
68
3,000
47
2,418
2,800
98
2,600
2,760
104
2,600
2.,920
98
2,740
2,760
76
2,600
2,920
72
2,740
.3,360
50
2,850
3
'3
'2
4 4
2,778Ce.
130
130
120
150
13-
1
2
2
4 x 2
110 ? .
(2) parked for technical reasons
4
90
45
2
65
lo
Inn
6
go
23
LLI
6
70
3
99 (+2)
ilm,
U.1
4
120
2
ti)
4
120
5
4
120
35
4
100
2
4
100
18 in late 1963 estimated:30
6
loo
- 2 25 k11/50 cycles
l0.5
no
2,300x
'2
107
86
46
71
50
95
109
104
79
76
62
2
in late 1963 estimated:
75 t 2
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part: Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- 32 -
IV., Czechoslovakia
?
I. Railroad Transportation
a) aaining-
The Czech State Railroads (CSD) have put into
operation on short excursion lines so-called
Pioneer-Railroads for the training of pioneer
railroaders. These railroads are operated, under
the control of experienced railroaders, with the
exception of the locomotive engineer by juveniles
aged 10 to 15 years. Such Pioneer-Railroads are in
Pilsen (Plzen), Kaschau (Kosice) and Presov.
Maintenance work is also carried out by pioneers.
Railroad technical schools, located at these places,
are in control of and responsible for schooling
and the carrying-out of repairs.
b) Line Construction
(1) After. an early beginning of. construction work
for the Vojany-Haniska broad-gauge line, at
the overpass south of Kosice, construction
work at other sections of the planned route
was taken up in early April 1964., The line
will be established with six servicing stations
and is projected for 80 km/h speed.- For'
diesel traffic the train standard.weight has been
fixed at 4,000 tons, and for later electric
traffic at 4,200 tons, The planned electrification
(direct current) requires a distance of 5 to
6.3 meters between the broad-gauge axle and
the standard-gauge axle.. Only pre-fabricated
parts, manufactured in Otna near Kosice*,: ate
-
to be used for the construction of bridges
and overpasses.
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
33 -
(2) At the-bonstruction of the Ostrava/Kuncice Polanka no0.
-connecting line, the three kilometer long-Kuncice
Vitkovice stretch has been completed in early May 1964,
three weeks ahead of schedule. On .6 May 1964, the
,KUncica'- Vitkovice stretch was inaugurated by an ore
train with diesel traction. The train was on its way
to the Vitkovice iron works. Beginning 1 September 1964,
single-track traffic is-to be put into operation on
the entire line. Then the second track will be laid.
Electrification is, contrary to the previous planning
(1966)9scheduled for early 1965.
c) LtEILLIIIIJILIktpl and Telecommunication
At Strba station (DV-3335) on the Friendship Line, electronic
remote control of switches and signals has been installed.
Traffic is controlled by a central station (presumably
Poprad). By late 1964, fifty more stations are to be equipped
with this remote control system.
d) . Electrification .
On 29 May 1964, the Brux (Most) - Oldrichov Aussig (Usti n.L.)
test traffic line, with its alternative stretch BrUx
Louka u Litvinova Oldrichov, was handed over to regular
electric traffic, bringing the total length of electrified
Czech standard-gauge lines up to 1,312 kilometers. The length
of the electrified narrow-gauge lines amounts to 64 kilometers
which brings the entire electrified road net to 1,376
kilometers. At variance with previous planning, the
following lines are to be electrified by 1965:
Havlickuv Brod-- Jihlava,
Velky Osek - Hradec Kralove - Tyniste nad
Orlici - ?Chocen
Pardubice- Hradec Kralove
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
- -34 -
e)' 112211.11LILLE
Running and ettl'ength tests of two new diesel locomotives are
at present carried out on the closed test line near Velim.
These are developments of Type T-669 and Type T-444 of CKD
plants at Prague and/or Martin (Turcianske Strojirny)
engineering works.
Technical Data
T-669,001 .Diesel electric locomotive for freight train's,
123 tons, 1;350 HP, maximum speed 95 km/h.
Manufacturer: CKD Prague
T-444,1 Diesel hydraulic locomotive for shunting-and
light main line service, 700 HP, maximum speed
70 km/h.
Manufacturer: Martin engine works. -
2. Road Transportation,
a) Performance Data.
From early January to mid-March 1964, State Motor Vehicle
Transport (CSAD) has transported over one million tons
of coal from the North Bohemian lignite coal district.'
b) Border Crossing_Traffic
At the Furth i.W,/s'chafberg --Vollmau (Facava) border
crossing point, newly. to be opened for freight and .
passenger motor vehicle, road improvement work (widening
of road to 7 to 8 meters and bridge construction across
Warme Pastritz-River) is under way. ,At a roadway width of
7.5 meters-1-the carrying capacity of the bridge will be
60 tonb, Construction work is carried out by German
firts;:pre-fabriCated reinforced concrete parts are
supplied by Czechoslovakia..
-SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part: Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
.435,
c) Motor Vehicle. Transport
In early April 1964, a new Pilsen (Plzen) - Prague/
Ruzin .4 airport bus-line was cpened. With this
bus-line motor transport took over the conveyance of
passengers to daily flight's; to BrUnn (Brno), Ostrau
9straVa)) Sliac, Pressburg (Bratislava) and Kaschau
Kosice), and enables the return to Pilsen in the
evening.
3. luland Shipping
Inland Shipping, discontinued since 17 December 1963$
has been taken up again on Elbe and Moldau rivers in
late March 1964. Regular coal transports to Kolin Elbe-
Harbor could not be resumed before late April 1964c
4. .Civilian Air Traffic
a) Traffic'
The new timetable of the Czech Airline CSA, which
became effective on 1 April 1964r provides as an
improvement daily flights to Warsaw and five times
a week to Moscow-. Increase of Prague - Brno and
Bratislava - Prague flight connectidna,. (A total
of six more flights daily).. On I May 1964) the
Bratislava - Budapest line will be opened.
b) Airplane Port
In mid-April 19641 Czechoslovakia bought two Soviet
jet-propelled ? passenger aircraft of Type TT-124, which.
are. to be used for flights on the Prague .4- Kosice and
on. international
5. Pipelines
In late April 1964,. .the ? first section of the 'branch of the
400 mm (diameter) Friandship.ripeline (Soviet UniOn--
BratiSIava) from. the. Bohemian4laoravian Heights., near
Havlickuv.Brodr. to Zaiuzi chemical plants waa'completed.
In May 19.64 the ? first oilr which will be brought in tank
cars to the pumping- station near. Havlickuv Brod, is to 50X1 -HUM
run through the ?Dineline to ZaJuzi
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
-36-
Poland Includin German Territory Under Polish Administration
Railroad Trans ortation
a) Data
ID)
During the first three months of 1964, the Polish
State Railroads (PKP) transported 219 (as against
205 during the same period in 1963) million
passengers and 75.4 (as against 65 during the same period
. tqX1965) million tons of freight.
Road Net
The Pi4uszkow Grodzisk:stretch of the electrifiaa
WarszaliajWarschau) - Czestochowa main line has four
rail's (heavy suburban traffic).
c) Electrification
(1) In late April 1964, the length of electrified
lines on the Polish State Railroad. (PKP) net. amounted
to alpost 1,000 kilometers.
(2) On 28 April 1964, after completion of electrification
work on the last stretch of the Katowice (Kattowitz)
Krakow (Krakau) - Przemysl ore Magistrale, the first
elecitria train pulled into Medyka station.
The performance on this Magistrale will increase by
more than 25 per cent, and the number of locomotives
, required will decrease by 50 per cent.
d) (1) Since early April 1964, old rails and ties are
being replaced by new ones on the Sierpc -
Plock line. Track repair of about 600 meters is
carried out daily;'.presumably.preparatory work for
the electrification of the Sierpc Kutno line
(in connection with the enlargement of the
refinery at Plock). Electrification of thisline
is. planned for 1964, ,
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8
SECRET
,L473
t,3
(2) In 1964, the, follcwing lines will be points .of main
efforts of track construction and line repair:
- Gdynia (Gdingen) - Karsznice Tornowskie Gory
(Tarnowitz) (within the electrification program)
- Lublin - Deblin - Radom - Kielce - Tunel (within
the electrification program)
- Warschau - Radom.
- Poznan (Posen) - Rawicz (Rawitsch)
- Belgard (Bialogard) Lauenburg (Lebork)
(3) Consequences of line construction work are:
- In April and May 1964, blockings-on the Warschau
Radom and Sierpc Plock lines
and
- In the course of 1964, diversions of several .
train pairs. of the coal Magistrale Gdynia (Gdingen)
Katowice (Kattowitz) via Czestochowa - Koluszki -
Lowiez Kutno - Torun (Thorn).
01117011
SECRET
Declassified in Part - Sanitized Copy Approved for Release 2014/01/15: CIA-RDP80-00247A000800020002-8