CONSTRUCTION UNDERWAY ON USSR-SATELLITE OIL PIPELINE

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T01003A001000210003-4
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
7
Document Creation Date: 
December 12, 2016
Document Release Date: 
February 6, 2002
Sequence Number: 
3
Case Number: 
Publication Date: 
March 30, 1961
Content Type: 
BRIEF
File: 
AttachmentSize
PDF icon CIA-RDP79T01003A001000210003-4.pdf299.75 KB
Body: 
Approved For Release 2002/02/11 : CIA-RDP79TO1003AO01000210003-4 C--O-N-F-I -D-E-N-T-I-A-L CIA/RR-CB-61-21 Copy No. 30 March 1961 CURRENT SUPPORT BRIEF CONSTRUCTION UNDERWAY ON USSR-SATELLITE OIL PIPELINE OFFICE OF RESEARCH AND REPORTS CENTRAL INTELLIGENCE AGENCY This report represents the immediate views of the originating intelligence components of the Office of Research and Reports. Comments are solicited. This document contains information affecting the national defense of the United States, within the meaning of the espionage laws, Title 18 USC, Sections 793 and 794, the transmission or revelation of which in any manner to an unauthorized person is prohibited by law. Approved For Release 2002/02/11 : CIA-RDP79T01003A001000210003-4 Approved For Release 2002/02/11 : CIA-RDP79TO1003AO01000210003-4 CONSTRUCTION UNDERWAY ON USSR-SATELLITE OIL PIPELINE The Soviet Union has begun construction on the portion of the USSR-European Satellite oil pipeline system which lies within Soviet boundaries. This so-called "pipeline of friendship," a cooperative venture of the members of CEMA (Council for Mutual Economic Assist- ance), is designed to supply crude oil to new refineries in the European Satellites and to refineries planned or under construction in the European USSR. It will also allow an increase in the exports of crude oil and petroleum products to Northern Europe and the Scandinavian countries through the Baltic Sea ports of Klaipeda and Ventspils. The entire system will be about 4,500 kilometers (km) in length and probably will be completed for use by 1964. (See Figure 1). Construction began in late 1959 on the Czechoslovakian segment and in 1960 on the Polish segment of the pipeline system. Czecho- slovakia planned to construct 186 km in 1960, but by September had fallen 40 km behind schedule. 1/ In Poland, a total of about 35 km was laid in 1960 with installa[ion proceeding simultaneously in both directions from Plock. No construction has been reported on the 130 km section in Hungary nor on the short section into East Germany, both of which are to be completed in 1962. It is probable that the Polish and Czechoslovakian portions of the pipeline will also be completed for use in 1962. The completed segments of the system are to be supplied temporarily with crude oil delivered by rail tank cars. Plans for petroleum pipeline construction in the USSR in 1961 call for completion of a 325 km section between Brody and Uzhgorod on the southern branch of the system. This section, described by Soviet engineers as the most difficult length of construction on the entire system, is to be ready for use at the beginning of 1962. Gathering lines are to be installed during 1961 to transport the crude from the Romashkino oil fields, in the area of Almetyevsk, to Kuybyshev, the origin of the trunk pipeline system. 2/ Most, if not all, of the Kuybyshev-Mozyr portion--the major sector of the system--is to be completed in 1962*, and completion of the Mozyr- Brody and Mozyr-Brest sections is scheduled for 1963. Apparently the Kuybyshev-Mozyr portion is planned to be con- structed of 40" diameter pipe, 3/ marking the first use of such large diameter pipe in the construction of a crude oil pipeline. At present the world's largest diameter oIl pipeline is the 32" Trans-Arabian crude oil pipeline. Diameters of the branch pipelines extending into the Satellites will average 20"-24". * A petroleum products pipeline between Kuybyshev and Bryansk has been under construction for the past several years. The final 429 km section, Michurinsk-Bryansk, is to be installed in 1961. This products pipeline frequently is confused in the Western press with the USSR-Satellite crude oil line. 30:.March 1961 CIA/RR-CB-61-21 C-O-N-F-I -D-E-N-T-I -A-L Page 2 Approved For Release 2002/02/11 : CIA-RDP79TO1003AO01000210003-4 Approved For Release 2002/02/11 : CIA-RDP79TO1003AO01000210003-4 C-O-N-F-I-D-E-N-T-I-A-L ESTIMATED DIAMETERS AND CARRYING CAPACITIES OF INDIVIDUAL SEGMENTS OF THE PLANNED USSR-EUROPEAN SATELLIT OIL PIPELINE SYSTEM Segment Length Diameter Carrying Capacity a/ Origin Terminus (km) (in.) (Million Metric Tons) (Annual) Kuybyshev Mozyr 1,350 40 b/ 35 Mozyr Brest 475 ) 24 c/ ) ) Brest Plock 280 ) ) Plock Schwedt 390 20 d/ Mozyr Uzhgorod 725 ) 24 e/ Uzhgorod Bratislava 20 f/ Sahy Szazhalombatta 130 na Michurinsk Kremenchug 700 20-24 e/ 7.5-11.5 Unecha Polotsk 375 28 e/ 18 Polotsk Klaipeda 475 20-24 e/ 7.5-11.5 Polotsk Ventspils 475 20-24 e/ 7.5-11.5 a/ Except for the uy yshev-Mozyr sector, which is an estimate, capacities are those given in Soviet sources and are a function of the diameter. b/ 3/. c/ 4/. d/ 5/. e/ Estimate. f/ 6/. 30 March 1961 CIA/RR-CB-61-21 Page 3 C-O-N-F-I-D-E-N-T-I A-L Approved For Release 2002/02/11 : CIA-RDP79TO1003AO01000210003-4 Approved For Release 2002/02/11 : CIA-RDP79TO1003AO01000210003-4 The USSR so far as is known, does not yet manufacture 40" steel pipe, and currently is using such pipe, imported from West Germany, in the construction of a natural gas pipeline linking the gas fields in Krasnodar Kray with the Moscow area. Requirements in 1962 for 40" pipe probably will exceed by far any Soviet production capability; therefore continued imports will be necessary. The USSR recently con- cluded a trade agreement with ENI, the Italian oil monopoly, under which 240,000 tons of steel line pipe are to be delivered to the USSR over a period of four years. 7/ Significant but unknown quantities of 40" pipe may be included in this agreement. In addition, it was reported recently that the USSR has successfully negotiated with a Swedish firm for the delivery of 135,000 tons of 40" steel line pipe during the next four years, possibly for use in construction of a pipeline linking the Urals-Volga directly with Leningrad. 8/ The USSR will continue to import large-diameter pipe from West Germany during 1961-63 and an English concern reportedly'has signed an agree- ment to deliver 150,000 tons of pipe of unknown diameter for oil and gas pipelines to the USSR during 1961-64. 9/ Total estimated pipe requirements for the Soviet portion of the system, excluding branch lines to Kremenchug and Klaipeda, may approach 700,000 tons, including 400,000 tons of 40" pipe. Use of 40" pipe on the Kuybyshev-Mozyr sector will allow the transport of about 28 million metric tons (mmt) of crude oil annually from the producing areas by 1965, with an eventual full capacity of 35 mmt. (See Figure 2). Of the 28 mmt of crude oil, 13 mmt may be required to supply new refining capacity now under construction in the European Satellites. Deliveries will be increased in succeeding years as refinery capacity in these countries is expanded. Of the estimated 15 mmt of crude oil moving to Polotsk, about 6 mmt probably will supply the refinery now being constructed there. Thus, as much as 9 mmt of crude oil, plus an additional 3 mmt of petroleum products, assuming a withdrawal of 3 mmt for local consumption, may be avail- able for export through Klaipeda and Ventspils to markets in Northern Europe and the Scandinavian countries. Although Klaipeda purportedly was to be the major petroleum exporting base on the Baltic Sea, re- cent reports indicate that the larger share of the exports will pass through Ventspils. 10/ In addition to the exports through the Baltic, the system may also provide for exports to the West through the port of Odessa if the branch line to Kremenchug in the Ukrainian SSR is extended to that city. However, the Kremenchug refinery still is in the planning stage and therefore construction of the Michurinsk-Kremenchug branch line probably will be postponed and may not be completed for use during the Seven-Year Plan. Another possibility, drawing much specu- lation in the Western press, would be the extension of the Czecho- slovakian section beyond Bratislava, to Vienna. 11/ 30 March 1961 CIA/RR-CB-61-21 Page 4 Approved For Release 2002/02/11 : CIA-RDP79TO1003AO01000210003-4 Approved For Release 2002/02/11 : CIA-RDP79T01003A001000210003-4 C-0-N-F-I -D-E-N-T-I A-L Table 2 ESTIMATED CAPACITIES OF REFINERIES TO BE SERVED BY THE USSR-SATELLITE OIL PIPVLINE 1965 Capacity Ultimate Capacity Refinery (Million Metric Tons) (Million Metric Tons) Polotsk a/ 6.0 6.0 Plock b/ 2.0 6.0* Schwedt c/ 4.0 8.0* Szazhalombatta d/ 2.0 3.0 Bratislava e/ 5.0 5.0 Kremenchug 1968. a/ Estimate. b/ 12/. CIA/RR-CB-61-21 Page 5 C-O-N-F-I-D-E-N-T-I A-L Approved For Release 2002/02/11 : CIA-RDP79T01003A001000210003-4, Approved For Release 2002/02/11 : CIA-RDP79TO1003AO01000210003-4 C-O-N-F-I -D-E-N-T-I-A-L Crude oil pipeline Possible crude/products ? Refinery planned or under construction ........... Plans for construction not confirmed Almetyevsk Figure 1. USSR-European Satellite Oil Pipeline System (To be completed generally by 1964) Unecha Szazhalombattaff CONFIDENTIAL Figure 2. Possible Movement Within the Planned USSR-European Satellite Oil Pipeline System 1965 (Millions of Metric Tons) 30 March 1961 CIA/RR-CB-61-21 C-O-N-F-I-D-E-N-T-I -A-L Page 6 Approved For Release 2002/02/11 : CIA-RDP79TO1003AO01000210003-4 25X1 Approved For Release 2002/02/11 : CIA-RDP79TO1003AO01000210003-4 Approved For Release 2002/02/11 : CIA-RDP79TO1003AO01000210003-4