SELECTED ELECTRIC POWER PLANTS KIANGSU PROVINCE, CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP79T00909A000600010015-1
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
16
Document Creation Date:
December 28, 2016
Document Release Date:
June 1, 2001
Sequence Number:
15
Case Number:
Publication Date:
March 1, 1972
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 1.23 MB |
Body:
Approved For Release 2001/08/07 : CIA-RDP79T00909A000Thp1Sftret
Industrial Facilities
(Non-Military)
DIRECTORATE OF
INTELLIGENCE
Basic Imagery Interpretation Report
Selected Electric Power Plants
Kiangsu Province, China
Top Secret
Handle via Talent - Keyhole
Channels Only
RCS
13/0028/72
TCS
1
/
Declass Review by NIMA / DoD
TT
~~
1972
M ARCH
Approved For Release 2001/08/07 : CIA-RDP79T00909A000
6`CDt0015-1
1'7
PAGES
15
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010015-1
WARNING
This document contains information affecting the national security of the
United States within the meaning of the espionage laws U. S. Code Title 18,
Sections 793, 794 The law prohibits its transmission or the reve-
lation of its contents in any manner to an unauthorized person, as well as
its use in any manner prejudicial to the safety or interest of the United
States or for the benefit of any foreign government to the detriment of the
United States. It is to be seen only by p{crsonnel especially indoctrinated
and authorized to receive information in the designated control channels.
Its security must be maintained in accordance with regulations pertaining
to TALENT-KEYHOLE Control System.
-6117061---l -- ----I
cxcLUDED YN(OM wUTOYAfC I
DOWNOAADINO AND
DYClA6a,ncnT[ON
Printed by the
NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010015-1
Handle Via Approved For ReleaseTDs1/SREA+1~ Ff9T00909A0006R 1~ ~J_
TalentKEYHOLE 1 028/72
Control System Only
CENTRAL INTELLIGENCE AGENCY
Directorate of Intelligence
Imagery Analysis Service
This report updates previous basic reporting on three of the major
electric power plants in Kiangsu Province, eastern China. It also includes
initial basic reports on two other thermal power plants at Chen-chiang and
25X1D Huai-yin. The cutoff date for information is
Chen-chiang Thermal Power Plant Chien- i-chen has been under construction
25X1D since it was first observed in it contained
possibly six operational boilers a onstruction.
25X1 D
25X1 D
25X1 D
25X1 D
Huai-yin Thermal Power Plant Chin Chian was complete and operating
when it was first observed in A major expansion program,
consisting of the construction o wo a i-ional boiler-generating units
and a new coal handling and processing facility, was completed by
-1- Handle Via
Approved For Releaser 1/ #/pRE 1A '9T00909A0006000100 -KEYHOLE
Control System Only
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010015-1
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010015-1
Halent?KEYHOLEApproved For ReleaseTAP1/Sl EJAPAPF9T00909A000ibbOib6giZ.72
T
Control System Only
A total of ten major electric power plants in Kiangsu Province have now
been reported in Basic Imagery Interpretation Reports. This report fulfills
the FY-72 requirement for updates and initial reports on the following
facilities (see Figure 1).
1. Chen-chiang Thermal Power Plant Chien-pi-chen.
Requirement
. Huai-vin Thermal Power Plant China Chian
COMIREX N05
Support Number 422798
-3- Handle Via
Approved For Releas"R1/gl/ER:RA F9T00909A0006000100tj eat KEYHOLE
on ro System Only
Handle Via
Talent-KEYHOLE Approved For ReleasiRM1a0g/'9TEaIPI {3FF79T00909A00060001TO (16263/72
Control System Only
Key to Annotations
Description
Switching yard
630 x 225
Generator hall
500 x 95
Boilerhouse
375 x 130
Coal storage and handling facilities
Water pumphouse
Water discharge
Control house
_4_ Handle Via
Approved For ReleaserM01'Tp/6REIIP 79T00909A0006000~0?T 0,21-KEYHOLE
on ro. System Only
Handle Via AQpproved For Release I(Q~/0~kf7RFCTA 79T00909A0006 0b1bb21%3'(72
Talent-KEYHOLE'
Control System Only
25X1 C
25X1 C
Chen-chiang Thermal Power Plant Chien---pi-chen
UTM COORDINATES GEOGRAPHIC COORDINATES
50SQL428625 32-10-50N 119-34-3011
USATC, Series 200, Sheet M0386-23HL 4th ed, Aug 68, Scale 1:200,000
(SECRET/No Foreign Dissem
LATEST IMAGERY USED
NA
Chen-chiang Thermal Power Plan Chien pi-chen is located on the south
bank of the Chang Chiang (Yangtze R'ver), about 7 nautical miles east-
southeast of Chen-chiang. The plan-- is partially secured by a wall or
fence. Coal is delivered to the plant by boat or barge. No rail lines
enter the plant area.
25X1D In he plant consisted of a boilerhouse with possibly six
boiler least two others under construction, a generator hall,
a switching yard, a control house, coal storage and handling facilities,
three stacks, and a water pumphouse (see Figure 2).
25X1 D
The lant was first observed under construction in By
25X1D he northern stack and adjacent boilerhouse a
w mp ete. The remaining portion of the generator hall and the middle
25X1D portion of the boilerhouse were complete by
25X1 D
25X1 D
The plant was first observed operatinc in when smoke was
coming from the northern stack. In is stack was again
observed emitting smoke. On the laces- coverage In the middle
section of the boilerhouse had become operational an smRe was comin from
the middle and northern stacks. The plant was not operating in
-5-- Handle Via
Approved For Release.12 Q1/$/Q7 E lK A;~t 79T00909A0006000100115n lKEYHOLE
Ur ~t( K Control System Only
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010015-1
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010015-1
Tae Via
Tale n t?KEYHOLgfkpproved For Release 209/W. IA 9 79T00909A00060001001g31 72
Control System Only
25X1 C
25X1 C
Huai-yin Thermal Power Plant Ching Chian
(SECRET/No Foreign Dissem
USATC, Series 200, Sheet M0386-18HL. 3rd ed. Mar 68. Scale 1:200.000
25X1 D
25X1 D
xcepY Tor one
to and operational
The boiler unit and generator may have become operational by
The middle boilerhouse was observed operating on all referenced coverage
25X1 D he
25X1D sou ern of er ouse was operating in
The northern boilerhouse has never been observed opera Ting and may be used
for standby purposes.
Huai-yin Thermal Power Plant Ching Chiang is located within the city of
Huai-yin. The plant is partially secured by a wall or fence, and the two
switching yards are totally secured by walls. Coal is delivered to the plant
by boat or barge. No rail lines enter the plant area. (See Figure 3.)
On the most recent photography in the plant consisted of
three boilerhouses, three generator ha is, tour s acks, two switching yards,
at least four transformers, a control house, a coal conveyor and storage
facility, three fuel oil storage tanks, and a probable water treatment facility.
In when the plant was first seen on photography, the
northern an ml e of erhouses and corresponding generator halls were present.
Handle Via
Approved For Releaseff/g /ekE fff79T00909A0006000100glSat>)KEYHOLE
Control System Only
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010015-1
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010015-1
Handle Via AD C~~QE~ Q TCS 16263/72
Talent-KEYHOLE Approved For Releasl4'U01t0 I 79T00909A000600010015-1
Control System Only
Key to Annotations
Item
Description
Dimensions (ft)
1
Coal handling and processing
facilities
--
2
Boilerhouses (3)
a.
115 x 55
25X1 D
b.
125 x 75
c.
155 x 105
25X1D
25X1D
25X1D
3
Generator halls (3)
a.
115 x 30
b.
125 x 65
25X1 D
c.
155 x 80
25X1D
4
Transformers (4)
25X1D
5
Switching yards (2)
175 x 160
145 x 110
6
Control house
80 x 40
7
Oil storage tanks (3)
25X1D
8
Probable water treatment
facility
Imagery References
Remarks
Completed by
Two s completed by
Iwo boilers completed by
One boiler completed by
one boiler
0
comp e ed b' (not
shown on gra is
y
Completed b
(contains un e ermine
number of generators).
Two generators completed
by
Two genera ors completed
by
Three lns a ed
one installed b
(not shown on gray is .
Handle Via
T n -KEYHOLE
Approved For ReleaseTOp1/If/a IA 9T00909A00060001pp r1J Sytstem Only
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010015-1
Next 1 Page(s) In Document Exempt
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010015-1
Handle Via Approved For Releaser.481//8/9F:IARW9T00909A0006000T96166f63/ 7
Talent-KEYHOLE
Control System Only
FIGURE 5. NAN-CHI A ' L POWER PLANT TA-CHANG-CHEN,
Handle Via
Approved For Re1ease]-2 1/3Lj17R:EIA 4rF9T00909A0006000l00Pni9t-KEYHOLE
otro System Only
Handle For Release WI /&GFFJIA,Rl~79T00909A00060001001511 263/72
Talent
T
Control System Only
Nan-ching Heat and Thermal Power Plant Ta-chars -chen CH
25X1A UTM COORDINATES GEOGRAPHIC COORDINATES
50SPL658655 32-12-48N 118-45-33E
MAP REFERENCE
25X1C USATC, Series 200, Sheet'M0386-22HL. 3rd ed. Sep 67. Scale 1:200.000
25X1C (SECRET/No Foreign Dissem
No changes have been observed at the Nan-ching Heat and Thermal Power
25X1D Plant Ta-chang-chen since he date of the latest imagery used in
the previous report.
The plant was operating in is indicated by smoke coming
from the stack (see Figure 5).
Imagery Reference
Handle Via
Approved For Release~91/~ /~ ~&PR5?g79T00909A000600010d1lsattKEYHOLE
Control System Only
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010015-1
Next 1 Page(s) In Document Exempt
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010015-1
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010015-1
Top Secret
Top Secret
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010015-1