SELECTED ELECTRIC POWER PLANTS KWANGTUNG PROVINCE, CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP79T00909A000600010012-4
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
9
Document Creation Date:
December 28, 2016
Document Release Date:
June 1, 2001
Sequence Number:
12
Case Number:
Publication Date:
March 1, 1972
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 1004.86 KB |
Body:
Approved For Release 2001/08/07: CIA-RDP79T00909A00TGP0V-t
Industrial Facilities
(Non-Military)
DIRECTORATE OF
INTELLIGENCE
Basic Imagery Interpretation Report
Selected Electric Power Plants
Kwangtung Province, China
Top Secret
Handle via Talent - Keyhole
Channels Only RCS 13/0026/72
TCS 16261/72
Declass Review by NIMA / DoD DATE MARCH 1972
Approved For Release 2001/08/07 : CIA-RDP79T00909A00060001G2Y' 117
PAGES 8
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010012-4
WARNING
['leis document contains information affecting the national security of the
United States within the meaning of the espionage laws U. S. Code Title 18,
Sections 793, 794. The law prohibits its transmission or the reve-
lation of its contents in any manner to an unauthorized person, as well as
its use in any manner prejudicial to the safety or interest of the United
States or for the benefit of any foreign government to the detriment of the
United States. It is to be seen only by personnel especially indoctrinated
and authorized to receive information in the designated control channels.
Its security must be maintained in accordance with regulations pertaining
to TALENT-KEYHOLE Control System.
r- aROU~i
I QCLVDED rNoI ADTOYtTlC
DDWMDNADIMD AND
L_ D[CLAN9f-1r*no'
Printed by the
NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010012-4
Handle Via TI .S.F..if.,RFT.. R U.F; ,,a,,,,,,,,,,,, ,,,,,,,,---Ta-a ,16Z61 /72
CENTRAL INTELLIGENCE AGENCY
Directorate of Intelligence
Imagery Analysis Service
0026/72
This report, based on photography, updates previous basic reporting
on three of the major electric power plants in Kwan tun Province, southern
China. The cutoff date for information is
The powerhouse for Ju-yuan Hydro Power Plant Nan Shul was identified
for the first time on photography of It is located about 2.4 nm
east of the earthen dam and just north o e ocation previously thought
to be the site for the powerhouse. It can now be determined that the
owerhouse was under construction in
- Talent-KEYHOLE
Approved For Releas~rap1& RE(TI Ff'9T00909A0006000aQQ1 tem Only
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010012-4
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010012-4
ndle C
Ta Via
pp~~11~~ TCS 16261 /72
Approved For ReleaseT~81/5E/C-P:
Talent- KEYHOLE
AW 9T00909A000600010012-4
Control System Only
A total of seven major electric power plants in Kwangtung Province have
now been reported in Basic Imagery Interpretation Reports. This report ful-
fills the FY-72 requirement for an update report on the following facilities
(see Figure 1).
Requirement
COMIREX N05
Support Number 422791
-3- Handle Via
Approved For Release / p~p A f9qT00909A00060001nQ a t-KEYHOLE
~tiR~- C6t -Astern Only
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010012-4
W
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010012-4
Handle Via
Talent?KEyHOI EApproved For Release
Control System Only
UF
GW:EJIAW79T00909A00060001 &~1 ~ 6i 61 / 7 2
Ju-yuan Hydro Power Plant Nan Shui CH
UTM COORDINATES GEOGRAPHIC COORDINATES
49RGT237422 24-46-50N 113-12-47E
MAP REFERENCE
USNOO. USATC, Series 200, Sheet 0498-21HL. 2nd ed. Se 66. Scale 1:200,000
(SECRET/No Foreign Dissem
LATEST IMAGERY USED
W NA
Construction has been observed at Ju-yuan Hydro Power Plant Nan Shui
since the date of the latest photography used in the previous
repor o ograp y In revealed that a powerhouse and at least
five small buildings have been constructed at the base of a hill about 2.4 nm
east of the earthen dam (see Figure 2). This is just north of the previously
reported site for the powerhouse. It can now be determined that construction
of the powerhouse was under way in
The powerhouse is apparently connected to the water supply by an
underground conduit. There is a water intake located just upstream from
the dam and a surge tank on the hill directly above the powerhouse. Water
from the conduit is discharged into the Nan Shui (river)from outlets located
beneath the powerhouse. The presence of a switching yard or transformers
could not be determined, nor could any measurements of the plant components
be made because of the small scale of the photography.
The plant was operating in as indicated by turbulence in the
tailrace below the powerhouse.
Imagery Reference
-5_ Handle Via
Approved For Release .?Q /Q8~?7RfARU~f79T00909A0006000100-KEYHOLE
Vr JC` ~~ Control System Only
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010012-4
Next 2 Page(s) In Document Exempt
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010012-4
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010012-4
Top Secret
Top Secret
Approved For Release 2001/08/07 : CIA-RDP79T00909A000600010012-4