FU-SHUN SHALE OIL AND CHEMICAL PLANT EAST FU-SHUN, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T00909A000500010027-2
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
15
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 18, 2008
Sequence Number: 
27
Case Number: 
Publication Date: 
June 1, 1969
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T00909A000500010027-2.pdf1.08 MB
Body: 
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 lop secret DIRECTORATE OF INTELLIGENCE .Industrial Facilities (Non-Military) Basic Imagery Interpretation Report Fu-shun Shale Oil and Chemical Plant East Fu-shun, China Top Secret COPY JUNE 1969 sot. Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 TOP SECRET RUFF CENTRAL INTELLIGENCE AGENCY Directorate of Intelligence Imagery Analysis Service 1:200,000 (SECRET USATC Series 200, Sheet M0290-IIHL, 4th edition, Jan 66, Scale Not Required This report is a detailed description of the Fu-shun Shale Oil and Chemical Plant East. The basic production facilities at this plant were in 25X1 25X1 25X1 25X1 ion and nearly complete when first observed on photography ofL 25X1 A second phase of construction occurred during the June 1962- 25X1 December 1965 period when the plant facilities were increased by approxi- mately 40 percent. This increase resulted primarily from the construction of crude oil processing and storage facilities. Increased crude oil storage indicates that the raw material for the new plant facilities is obtained from oil field resources, possibly from Sa-erh-tu Oil Field in Heilungkiang Province, rather than from shale. Plant products include various blends of gasoline, fuel oil, and lubricating oil. By-products are ammonium sulfate and paraffin. The plant appeared to be in operation on all photography studied for the period from No significant changes in facilities 25X1 This report includes a detailed line drawing and photograph of the installation, mensuration of significant features, a chronology of construc- tion, a functional analysis, and reference data. TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 WAC-P I C N(25X1 0290-36-G Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 TOP SECRET RUFF -2- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 TOP SECRET RUFF to the west-northwest of the plant. The Fu-shun Dam and Hydro Power Plant (Ta-huo-fang) is located 4 nm to the north-northeast. The Fu-shun Shale Oil and Chemical Plant East, one of two shale oil plants in the Fu-shun complex, is located approximately 7 nautical miles (nm) east-southeast of the center of Fu-shu rued by rail and road. The Fu-shun Shale Oil Plant West is located 8 nm 25X1 The Fu-shun Shale Oil and Chemical Plant East processes shale brought in by rail from a large strip mine adjacent to the Fu-shun Shale Oil Plant West. The plant also processes crude oil, possibly from the Sa-erh-tu oilfield 200 nm north of Fu-shun in Heilungkiang Province. Physical Features The plant is located in a narrow valley near the Hsiao-lin-chuang Ho (River). The plant facilities are situated in a 597-acre rectangular area measuring approximately 7,560 by 3,440 feet. The plant is expansive in design, especially when compared to the neighboring Fu-shun Shale Oil Plant West. No security precautions were observed at the plant. Operational Functions The plant extracts oil from shale and produces refined petroleum pro- ducts from this shale oil and crude oil shipped in by rail. The primary refined products are various blends of gasoline, fuel oil, and lubricating oil. In addition, ammonium sulfate and paraffin are produced as by- products. Ammonia is obtained from the shale oil retorts and combined with sulfuric acid to form the ammonium sulfate. Status and Activity Construction of the facilities at the Fu-shun Shale Oil and Chemical Plant East occurred in two distinct phases. The basic facilities for the extraction of oil from shale and the production of refined petroleum products from this oil were complete when this plant was first observed in June 1962. In addition, most of the support facilities were present. The second phase of construction was between June 1962 and December 1965 when the plant facilities were expanded by approximately 40 percent. The addition of processing units and facilities for crude oil storage and the dismantling of the vertical processing units from one shale oil retort area indicate that natural crude oil is being processed here. It is possible that this change occurred because the shale resources at Fu-shun are being depleted or because it is more economical to extract and process natural crude oil than oil shale. -3- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 TOP SECRET RUFF The plant appeared to be in operation on all photography studied for this report as evidenced by smoke, vapor, and dust from the stacks, burning at the flare tower, and railroad traffic. The construction history of the plant is as follows: June 1962 -- The original shale oil plant (Figure 3, Areas A through N, Q, V, and Y) was complete and operating. The second phase of construc- tion was in a very early stage. August 1962 -- Second phase construction was continuing. The con- struction of tank storage (Areas X and Z) was particularly apparent. April 1963 -- Approximately 60 new cylindrical storage tanks (Areas X and Z) and one crude oil distillation unit (Area 0) were complete. December 1964 -- Approximately 36 new cylindrical storage tanks (Areas X and Z), one probable thermal cracking unit (Area P), one probable crude distillation unit (Area R), one probable catalytic cracking unit (Area S), and several new administrative buildings were complete. December 1965 -- Two new unidentified processing units and II cylindri- cal tanks (Areas V and W) were complete. Most processing units were re- moved from the northernmost shale oil retort unit (Area B). February 1966 to November 1968 -- No significant change in facilities observed. Facilities and Equipment The following table lists the functional areas and facilities within the plant. Precise identification of processing units was frequently im- possible due to small scale of the imagery available, and occasionally is based upon relative positions of the units. Approximate dimensions of the storage tanks are also presented. -4- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 TOP SECRET RUFF Equipment and Facilities at the Fu-shun Shale Oil and Chemical Plant East (Items are keyed to Figure 3) Area Functional Description Equipment A Cooling Facilities 4 large spray ponds served by a pumphouse. B Shale Oil Retort One large retort building, con- taining 3 complete and I incomplete shale oil extraction units. Each unit contains 20 retorts served by a tall exhaust stack. 3 vertical processing units I primary shale crushing building I secondary crushing building I screening building I ash bunker 2 control buildings 5 U/I buildings C Shale Oil Retort One large retort building con- taining 3 complete shale oil extraction units. Each unit contains 20 retorts served by a tall exhaust stack. 15 vertical processing units I primary shale crushing building I secondary crushing building I screening building I ash bunker 3 control buildings 5 U/I buildings 2 large venturi cooling towers D Gas Processing Area 16 (Light Ends) 2 I 3 horizontal pressure tanks 2 cylindrical storage tanks (50 ft. diam.) 4 U/I buildings vertical processing units compressor buildings bank of condensers/heat exchangers/cooling coils/ accumulators -5- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 TOP SECRET RUFF Area Functional Description Equipment E Thermal Power Plant Plant is rail-served, with exten- sive coal-handling facilities, 2 large venturi cooling towers, a large exhaust stack, and switching yard F Sulfuric Acid Plant I probable crushing and roasting (Contact Process) building I probable oleum building 4 sulfuric acid tanks G Probable Clay Treatment Area 3 U/I processing buildings (Lubricating Oil Refining) 2 U/I buildings 6 cylindrical storage tanks (10 ft. diam.) 14 cylindrical storage tanks (20 ft. diam.) I induced-draft cooling tower H Ammonium Sulfate Plant I ammonium sulfate production building I large rail-served warehouse 2 U/I buildings 14 cylindrical tanks (25 ft. diam.) J Primary Distillation Unit 2 vertical processing units 2 pipe furnaces I compressor building I cylindrical tank (50 ft. diam.) I induced-draft cooling tower K Probable Thermal Reform Unit I vertical processing unit I pipe furnace I control building L Products Shipping and Storage 15 large warehouses 4 cylindrical tanks (50 ft. diam.) 6 cylindrical tanks (30 ft. diam.) 6 cylindrical tanks (10 ft. diam.) M Probable Delayed Coking Unit 2 fractionating towers Several covered coke drums I coking furnace 2 control houses I compressor building TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 TOP SECRET RUFF Area Functional Description Equipment N Probable Dewaxing (Paraffin) I large vented dewaxing building Plant and Solvent Extraction I probable solvent extraction Unit unit with 6 vertical processing units (Lubricating Oil Refining) I generator building 4 cylindrical tanks (50 ft. diam.) 25X1 25X1 6 cylindrical tanks 25X1 9 cylindrical tanks 3 horizontal tanks 2 induced-draft cooling towers 0 Crude Oil Distillation Unit 3 fractionating columns 2 pipe furnaces I compressor building P Probable Thermal Cracking Unit 2 fractionating columns I probable reactor 2 compressor/furnace buildings Q Probable Deasphalting Unit 3 processing buildings with (Lubricating Oil Refinery) horizontal tanks I vertical processing unit. 2 pipe furnaces 4 storage buildings R Probable Crude Oil 3 vertical processing units Distillation Unit 2 pipe furnaces I compressor building 6 cylindrical tanks (20 ft. diam.) S Probable Catalytic Cracking I fractionating column Unit I probable reactor I pipe furnace I control house I compressor building 2 cylindrical tanks (70 ft. diam.) T Products Storage U Support Area V U/I Secondary Processing Unit 8 large warehouses 13 buildings 6 vertical processing units I pipe furnace I compressor building W U/I Secondary Processing Unit 3 vertical processing units I compressor/furnace building II cylindrical tanks (30 ft. diam.) 3 U/I buildings -7- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 iur )tLKt I KUrr -8- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 25X1 25x1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 AREA U ............................................................ 0 AREA S 0000000 0000 JLELEU= 00 0 000 obo AREA A AREA V 0000 000 00000 c. 00 00000 : 00 0 0 00 0 AREA X ? F' ;AREA P ? AREA 0 OOOO 00 ? ? AREAQL, AREA W FLARE TOWER AREAI - .. I I I 0 a 0 0 AREA V TOP SECRET RUFF 00 000 0000 0000 000 0 0000 III I II I -9- TOP SECRET RUFF 0000 AREA Z CRUDE OIL RESERVOIR O T_T.1....: ......................................................5.............................: BUILDING PROCESSING EQUIPMENT CONDENSERS/HEAT EXCHANGERS/ COOLING COILS/ACCUMULATORS O ? COOLING TOWER 0 TANK HORIZONTAL TANKS ? POND -mot- FENCE FURNACE ? STACK I --F RAILROAD .- rLrllU COOLING FACILITIES SHALE OIL RETORT SHALE OIL RETORT GAS PROCESSING AREA (LIGHT ENDS) THERMAL POWER PLANT SULFURIC ACID PLANT PROBABLE CLAY TREATMENT AREA (LUBRICATING OIL REFINING) AMMONIUM SULFATE PLANT STEAM PLANT PRIMARY DISTILLATION UNIT PROBABLE THERMAL REFORM UNIT PRODUCTS SHIPPING AND STORAGE PROBABLE DELAYED COKING UNIT PROBABLE DEWAXING (PARAFFIN) PLANT AND SOLVENT EXTRACTION UNIT (LUBRICATING OIL REFINING) CRUDE OIL DISTILLATION UNIT PROBABLE THERMAL CRACKING UNIT PROBABLE DEASPHALTING UNIT (LUBRICATING OIL REFINING) PROBABLE CRUDE OIL DISTILLATION UNIT PROBABLE CATALYTIC CRACKING UNIT PRODUCTS STORAGE SUPPORT AREA U/1 SECONDARY PROCESSING UNIT U/I SECONDARY PROCESSING UNIT FINISHED PRODUCTS STORAGE COOLING FACILITIES CRUDE OIL STORAGE LEGEND NOTE: THIS DRAWING BASED ON UNRECTIFIED PHOTOGRAPHY Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 TOP SECRET RUFF 25X1 25X1 Area Functional Description Equipment X Finished Products Storage 2 cylindrical tanks (90 ft. diam.) 2 cylindrical tanks (50 ft. diam.) 3 cylindrical tanks (30 ft. diam.) 42 cylindrical tanks (20 ft. diam.) Y Cooling Facilities 3 large induce d-draf t co oling I towers large spray pond s erve d by a pumphouse I electrical sub-station Z Crude Oil Storage I pumphouse 2 floating top cylindrical tanks (135 ft. diam.) 10 cylindrical tanks (65 ft. diam.) 20 cylindrical tanks (50 ft. diam.) I open reservoir (400 x 200 ft.) -I0- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 TOP SECRET RUFF Maps US Air Target Chart 200, Sheet M0290-IIHL 4th edition. Jan 66, Scale 1:200.00 (SECRET~ China-Industries, Fu-shun Shale Oil Plant East (No. 2 Petroleum Refinery), April 1968 (SECRET) -II- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 TOP SECRET RUFF 2. CIA. DDI/IAR 87005, Developments Relating to the Chinese Railroad System, September-December 1967 3. CIA. 75011, Oil Field and Refinery Complex, Sa-erh-tu, China, July 19661 I(TOP SECRET RUFF) Requirement -12- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2 Top Secret Top Secret Approved For Release 2008/06/18: CIA-RDP79T00909A000500010027-2