TU-SHAN-TZU PETROLEUM REFINERY AND STORAGE TU-SHAN-TZU, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T00909A000500010018-2
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
14
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 18, 2008
Sequence Number: 
18
Case Number: 
Publication Date: 
June 1, 1969
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T00909A000500010018-2.pdf987 KB
Body: 
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 i op secret Industrial Facilities (Non-Military) DIRECTORATE OF INTELLIGENCE Basic Imagery Interpretation Report Tu-shan-tzu Petroleum Refinery and Storage Tu-shan-tzu, China Top Secret DATE COPY PAGES Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 13/0187/69 JUNE 1969 101 II 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 TOP SECRET RUFF CENTRAL INTELLIGENCE AGENCY Directorate of Intelligence Imagery Analysis Service Tu-shan-tzu Petroleum Refinery and Storage 45TUK289080 MAP REFERENCE WAC-P I C NO?5X1 0243-38A ACIC. USATC Series 200, Sheet 0243-22AL, 1st ed., Apr 60, Scale 1:200,000 (SECRET) Not Required The Tu-shan-tzu Petroleum Refinery and Storage is a medium size Chinese refinery with crude distillation and thermal cracking units. Because of poor-quality photography, detailed analysis of the refinery was not possible on coverage from September 1961 through October 1964. Good-quality coverage in October 1965, however, showed that all facilities were complete and probably in full operation. Production since then appears to have been con- tinuous. The products of this refinery include straight-run and cracked gasolines, kerosene, diesel and fuel oil, asphalt, and possibly some coke. This report includes a detailed line drawing, a photograph of the area, mensuration of storage tanks, and a discussion of the status of facilities. -I- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 25X1 TOP SECRET RUFF -L- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 TOP SECRET RUFF Tu-shan-tzu Petroleum Refinery and Storage is located on the western edge of Tu-shan-tzu in the desert area of the Dzungarian Basin, Sinkiang Uighur Autonomous Region. Reportedly, construction of this refinery was a joint Sino-Soviet project begun in 1950 at the site of an earlier refinery which had been abandoned.l/ Crude oil for charging the refinery is brought in by pipeline from the Ko-la-ma-i Oil Field approximately 100 nautical miles (nm) to the north and from other Dzungarian Basin fields. Products and crude oil in excess of that used locally are transported by truck to the nearest rail facilities at Wu-lu-mu-chi (Urumchi) about 150 nm to the southeast. The roads con- necting Tu-shan-tzu with the rail facilities appear to be hard-surfaced all-weather roads. -3- TOP SECRET RUFF Physical Features This is one of China's medium size refineries. It occupies a rectan- gular-shaped area which measures approximately 4,500 by 2,000 feet and covers about 200 acres. Security consists of a wall around the refinery and a control point at its entrance. Operational Functions This refinery is capable of performing both primary and secondary processing. The major refining equipment consists of two crude oil dis- tillation units and one probable and three possible thermal crackers. The products include straight-run and cracked gasolines, kerosene, diesel and fuel oil, asphalt, and possibly some coke. The refinery appeared to be in operation on October 1965 photography and on all subsequent coverage through February 1969. Construction Status and Activity Due to the poor resolution and small scale of the photography of this refinery from September 1961 through October 1964, detailed analysis of its early development is not possible. During this period, only part of the processing equipment and some of the storage tanks were distinguishable. Good-quality small-scale coverage in October 1965 showed that most of the refinery's present processing facilities and storage tanks were complete. Since that time, no significant changes have been noted in the refining facilities and only minor changes in the support and storage areas. Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 TOP SECRET RUFF Facilities and Equipment The following table lists the functional areas and facilities within the refinery. Precise identification of the specialized refinery equipment was.not possible because of the small scale and poor quality of much of the imagery covering the complex. The tentative identifications of equipment are based on the overall aspects of the refinery and the relative positions of the units. All items are keyed to Figure 3. EQUIPMENT AND FACILITIES AT THE TU-SHAN-TZU PETROLEUM REFINERY Area Functional Description Equipment* A Storage 4 Storage buildings 9 Horizontal tanks B Crude Oil Storage 5 Support buildings (3 partially dismantled) 8 Cylindrical tanks, 3 diam. 130 ft. 4 diam. 80 ft. I diam. 15 ft. 4 Semiburied reservoirs (I under construction) C Product and Intermediate 16 Support buildings Handling and Storage 57 Cylindrical tanks, 2 diam. 80 ft. 5 diam. 50 ft. 3 diam. 45 ft. 12 diam. 40 ft. I diam. 35 ft. 10 d i am. 30 ft. 19 diam. 25 ft. 3 diam. 15 ft. 2 semibu ri ed D Support 22 Support buildings I Bank of U/I processing equipment E Possible Crude Distillation 3 Possible fractionators/strippers 9 Support buildings I Building with possible furnace and processing equipment 7 Cylindrical tanks, 6 diam. 15 ft. I diam. 25 ft. AIF measurements of tanks have been rounded off to the nearest 5 feet. -4- TOP SECRET RUFF 25X 25X Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 TOP SECRET RUFF Area Functional Description Equipment F Possible Thermal Cracking 2 Pipe furnaces I Bank unidentified processing equipment (probably a fractionator, a reactor, and a flash tower) 6 Support buildings G Unidentified Processing 3 Possible fractionators I Building 4 Cylindrical tanks, 4 diam. 35 ft. H Storage/Support Probable Thermal Cracking J Crude Oil Storage I Bank of cooling towers I U/I rack (probably for drum storage) 13 Support buildings 9 Cylindrical tanks, 7 diam. 15 ft. 2 diam. 30 ft. 4 Horizontal tanks 3 Pipe furnaces 3 Columns (possibly including a fractionator, a reactor, and a flash tower) II Support buildings 5 Cylindrical tanks, 4 diam. 25 ft. I diam. 10 ft. 2 Support buildings 8 Cylindrical tanks, 4 diam. 80 ft. 4 diam. 35 ft. K Possible Thermal Cracking 2 Pipe furnaces 3 Processing columns I Bank of U/I processing equipment (possibly a frac- tionator, a reactor, and a flash tower) 4 Support buildings 29 Cylindrical tanks, 4 diam. 30 ft. 9 diam. 25 ft. 16 diam. 15 ft. -5- TOP SECRET RUFF 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 TOP SECRET RUFF Area Functional Description Equipment L Storage/Support I Flare tower 2 Banks of cooling towers 8 Support buildings 3 Cylindrical tanks 3 diam. 15 ft. M Product Handling and I Fractionator Storage 9 Support buildings 42 Cylindrical tanks, 8 diam. 30 ft. 18 diam. 25 ft. 15 diam. 15 ft. I diam. 20 ft. N Crude Distillation I Bank of shell stills 5 Support buildings (I under construction) 2 Cylindrical tanks, 2 diam. 35 ft. 0 Possible Thermal I Pipe furnace Cracking 5 Columns (possibly a fractionator, two reactors, and two flash towers) 10 Support buildings I Semiburied reservoir P Administration and 19 Support/administration Support buildings Q Loading Facility 12 Truck loading racks 8 Support buildings R Support I Bank of cooling towers 9 Support buildings (I under construction) I Semiburied reservoir 4 Cylindrical tanks, I diam. 35 ft. -2 diam. 15 ft. I diam. 20 ft. -6- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 Approved F TOP SECRET RUFF Functional Description S Pumping Station Equipment 5 Truck loading racks 14 Support buildings (I under construction) 5 Cylindrical tanks, I diam. 80 ft. I diam. 50 ft. I diam. 35 ft. 2 diam. 30 ft. 25X1 25X1 -7- TOP 'SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 Approved For Release 2008/06/18: CIA-RDP79T00909A00050 25X1.1 -8- TOP SECRET RUFF 0010018-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 25X1 25X1 25X1 0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 TOP SECRET RUFF AREA A O jIL111111~I IIII v 1 O _ L-I ^ ^ 00 000 -=:3 Lr'-D " n 00 000 0 00 () 000 0 IN O C1?^ O o c fla o n a IJ f_n Li AREA E 7[] U UN rn?cn KEY TO ANNOTATIONS W~ - ? -?????????..... ~.' --pC~ U B CRUDE OIL STORAGE C PRODUCT AND INTERMEDIATE HANDLING AND STORAGE C] =? ~~ U W 0 SUPPORT ? AREA H C7 ? IIII E POSSIBLE CRUDE DISTILLATION O C] 0 C~ F POSSIBLE THERMAL CRACKING AREA D G UNIDENTIFIED PROCESSING ....................? AREA F STORAGE/SUPPORT ,W a ??????.?.{ I PROBABLE THERMAL CRACKING J CRUDE OIL STORAGE C~ 6 K POSSIBLE THERMAL CRACKING a UL U/I RACK L STORAGE/SUPPORT Q M PRODUCT HANDLING AND STORAGE J'1 0 Y ? ? AREA G 0 ? O POSSIBLE STERMAL 4J CRACKING 00 0 0 0 P ADMINISTRATION AND SUPPORT LOADING FACILITY 0000.: ............................ ............................ R SUPPORT O S PUMPING STATION AREAI POSSIBLE THERMAL 00 000 O O^ ~~ POWER PLANT o o p AREA J O W oa ~ W .......................... ......................... _.................................. 0 00000 f ~j =1 00 O 000 IIII o GOO c j o'o AREA P AREA K O O ? ? O O O ? AREA L R?R?R~O N O G O ? } . ................................. ............................ LEGEND 0 0 S [1 BUILDING : X - -- jf BUILDING U/C OR PARTIALLY 8 AREA N :U AREA 0 DISMANTLED C I l AREAM ??????????'???"""' SEMIBURIED TANK 000 ? SEMIBURIED RESERVOIR 0 pp YiJ C~ 000 o d ?I L PROCESSSIISG EQUIPMENT tl8tl8 !a O E~ 0 - WALL ~ HORIZONTAL TANKS :O Q nC.U 6 STACK O JU I . O : :k,FUn UM?,: SEMIBURIEG RESERVOIR U/C 0000 0000 ? FLARE TOWER 00 0000 AREA R COOLING TOWERS ........... 0 0 0 El LOADING RACKS AREA O I II IIIIIII IN W W CD B NOTE: LINE DRAWING MADE FROM UNRECTIFIED PHOTOGRAPHY JRE 3. TU-SHAN-TZU PETROLEUM REFINERY AND STORAGE, CHINA. -9- TOP SECRET RUFF ved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 TOP SECRET RUFF Talent -KEYHOLE Control System Only Map TCS - 1913,5/69. ACIC. US Air Target Chart, Series 200, Sheet 0243-22AL, 1st edition, Apr 60, Scale 1:200,000 (SECRET) Report No. 1248631,. September 1959 (CONFIDENTIAL) ChiCom Petroleum Industries, 25X1 Oil Coke by Delayed Coking Process, 21 August 1968 (CONFIDENTIAL) Successful Trial Production of Grade No. I -10- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 Approved Fo TOP SECRET RUFF Requirement EXSUBCOM - BR-N/002-69 25X1 TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2 Top Secret Top Secret Approved For Release 2008/06/18: CIA-RDP79T00909A000500010018-2