KUYBYSHEV PETROLEUM REFINERY NO,. 2 NOVOKUYBYSHEVSK, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79T00909A000500010001-0
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
29
Document Creation Date: 
December 28, 2016
Document Release Date: 
June 18, 2008
Sequence Number: 
1
Case Number: 
Publication Date: 
May 1, 1971
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79T00909A000500010001-0.pdf997.79 KB
Body: 
Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Top Secret Industrial Facilities (Non-Military) DIRECTORATE OF INTELLIGENCE Basic Imageiy Interpretation Report Kuybyshev Petroleum Refinery. No. 2 Novokuybyshevsk, USSR Top Secret RCS 13/0042/71 25X1 DATE copy 117 PAGES 28 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF CENTRAL INTELLIGENCE AGENCY Directorate of Intelligence Imagery Analysis Service Kuybyshev Petroleum Refinery No. 2 RCS - 13/0042/71 MAP REFERENCE 8th RTS. USATC, Series 200, Sheet M0165-17HL 5th ed. Noy 67, snaip.1.2no-noo (SECRET 25X1 LJ/~ I 25X1 25X1 Kuybyshev Petroleum Refinery No. 2 is the largest single refinery in the Soviet Union with respect to charge capacity. It is one of two petroleum refineries in the Kuybyshev area. The major production facilities of the refinery include crude oil distillation units, desalting units, thermal and catalytic cracking units, gas fractionation and probable gas processing units, lubricating oil plants, blending and treating units, alkylation and probable thermal alkylation units, probable catalytic reform- ing-hydrotreating units, possible hydrotreating units, and possible polymerization and extraction units. Several unidentified processing units are also present. In January 1971 one processing unit was under construction. The products include straight-run, cracked and blended gasolines with a wide range of octane ratings, kerosene, diesel and fuel oils, lubricating oils, waxes, asphaltic materials, and probably petrochemicals or petrochemical feedstocks. The refinery was in operation on all photographic coverage from April 1962 through January 1971. This report includes a location map, two line drawings, three photographs of the refinery, mensuration of storage tanks, and a discussion of the status of facilities. -1- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF 25X1 LJ/~ I TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Kuybyshev Petroleum Refinery No. 2 is the largest single refinery in the Soviet Union with respect to charge capacity. It is one of two petroleum refineries in the Kuybyshev Area and is situated on the southwest bank of the Volga River, about 12 nautical miles (nm) southwest of Kuybyshev (see Figure 1). The refinery reportedly was started in 1950 and began partial operation in 1952. 1/ The refinery is served by a rail spur from the main line between Kuybyshev and Syzran. Most of the crude oil to charge the refinery comes by pipeline from the Makhanovo oil field. Smaller amounts are supplied by the oil fields at Romaskino and Tuymazy. All three of these oil fields are in the Volga-Urals production region. 1/ Electric power and steam for the refiner nrndw-Pd at the collocated Kuybyshev Heat and Thermal Power Plant TETS 2 e adjacent 25X1 Kuybyshev Synthetic Alcohol Plant Novokuybyshevsk is connected 25X1 y pipelines. The Kuybyshev Petroleum Refinery Lend Lease 3 25X1 s located 5 nm east of the refinery. Physical Features This refinery occupies an area 14,000 by 8,500 feet and covers about 2,700 acres (see Figures 2-6). It is partially secured by walls and fences. Operational Functions The major refining units presently in operation at this refinery include ten crude oil distillation units, ten desalting units, five thermal cracking units, three catalytic cracking units, one gas fractionation unit, one probable gas processing unit, two lubricating oil plants, several blending and treating units, one alkylation unit and one probable thermal alkylation unit, three probable catalytic reforming-hydrotreating (CR-HT) units, three possible polymer - zation and extraction units, and two possible hydrotreating units. Also, there are several unidentified processing units, including some which probably produce petrochemicals or petrochemical feedstocks. Based on the identification of processing units, the products of the refinery include straight-run, cracked, and blended gasolines in a wide range of octane ratings, kerosene, diesel and fuel oils, lubricating oils, waxes, asphaltic materials, and probably petrochemicals or petrochemical feedstocks. Construction and Operational Status The earliest good-quality photography used in this study is from September 1962. At that time approximately 90 percent of the present processing equipment and storage tanks were in place. The only units not in place were the three probable CR-HT units, the sulfuric acid plant, a possible blending unit, and four unidentified processing units. On photography of February 1'964, the three probable CR-HT units (Area B, Figure 4) were under construction, the sulfuric acid plant was complete, and the possible blending unit (Area JJ, Figure 6) was complete. Two of the unidentified processing units (Areas II and QQ) were complete and one was under construction (Area J). By May 1965 one of the probable CR-HT units was complete and the other two were nearly complete. Construction was continuing on the unidentified processing units. -3- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Photography of June 1966 revealed that the other two probable CR-HT units were complete. The unidentified processing unit in Area J was nearly complete. The unidentified unit in Area C was in the early stages of construction. By April 1970 the unidentified processing units in Areas C and J were complete. The probable thermal alkylation unit in Area CC3 was being dismantled. Construction had started on a processing unit just southeast of Area J (Figure 4). By January 1971, little additional construction was apparent on the processing unit southeast of Area J. No other construction was noted in the refinery. Facilities and Equipment Tables 1 and 2 list the functional areas and equipment in the refinery, and are keyed to Figures 4 and 6 respectively. The buildings and processing equip- ment in the unidentified unit southeast of Area J are not listed in the tables. All measurements in the tables are rounded to the nearest half-meter. Table 1. Equipment and Facilities at Kuybyshev Petroleum Refinery No. 2 Northeast Section (Keyed to Figure 4) Area Functional Description Equipment and Facilities A Storage 2 Probable pump buildings 1 Support building 51 Cylindrical storage tanks 7 19.5-meter-diameter 11 15-meter-diameter 9 12-meter-diameter 8 9-meter-diameter 11 6-meter-diameter Probable Catalytic Reforming- 2 Units, each with Hydrotreating 4 reactors 7 columns 4 banks of heat exchangers/ cooling coils/accumulators 4 pipe furnaces 1 processing building with 4 horizontal and 1 cylindrical treating tanks 7 small processing/support buildings 2 pump buildings 11 cylindrical storage tanks (not measured) 1 Unit with 4 reactors 11 columns 1 bank of heat exchangers/ cooling coils/accumulators 3 pipe furnaces 5 processing buildings 3 pump buildings 2 support buildings 2 cylindrical storage tanks 3 meters in diameter 10 Support buildings TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Q Next 1 Page(s) In Document Denied Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF 25X1 25X1 Functional Description Equipment and Facilities Unidentified Secondary 1 Unit with Processing 9 columns 1 large cluster of processing equipment 2 processing/pump buildings 1 horizontal storage tank 12 meters long 14 support buildings Storage and Unidentified Secondary Processing (1) Unidentified Secondary 1 Processing (2) Storage 1 qasholder, Unit with 8 columns 1 processing building 3 support bud" inriq 2 Probable pump buildings 73 Cylindrical storage tanks 4 15-meter-diameter 12 6-meter-diameter 13 Horizontal storage tanks, 13.5 meters long 25X1 Unidentified Secondary 1 Unit with ns m Processing 18 9-meter- lame er 7 co u 1 cluster of processing equipment 1 bank of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 pump building 2 cylindrical storage tanks 3 meters in diameter 1 Unit with 8 columns 1 cluster of processing equipment 1 bank of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 processing building with 5 horizontal and 1 cylindrical treating tanks 4 processing buildings 1 pump building 1 cylindrical storage tank, 3 meters in diameter Probable Gas Processing and Unidentified Secondary Processing (1) Unidentified Secondary 2 Processing Units, each with 2 columns 1 cluster of processing equipment 2 banks of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 compressor building -8- ~..., rr1'e[T DIICG Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Probable Dewaxing and Unidentified Secondary Processing (1) Probable Dewaxing F (Cont) (2) Probable Gas Processing 1 Unit with 30 columns 4 clusters of processing equipment 2 banks of heat exchangers/ cooling coils/accumulators 4 processing buildings (one with 3 horizontal tanks) 1 pump building 2 cylindrical storage tanks 25X1 1 Unit with 3 columns 2 clusters of processing equipment 1 processing building with 12 horizontal tanks 2 processing buildings (one with 12 cylindrical tanks and 1 bank of heat exchang- ers/cooling coils/accumu- lators on the roof) 1 cylindrical storage tank, 3 meters in diameter (2) Unidentified Secondary 1 Unit with Processing 2 columns 1 processing building 1 support building 3 cylindrical storanA tanks,____ H Water Cooling 17 Cooling towers 16 Miscellaneous buildings 27 Cylindrical storace tanks 7 12-meter-diameter 5 9-meter-diameter 9 6-meter-diameter 9 Horizontal storage tanks, Shipping and Probable 1 Large probable blending/ Blending/Treating treating building with 3 clusters of processing equipment 1 pipe furnace 1 cooling tower 3 cylindrical storage tanks 2 3-meter-diameter 7 Support buildings (one under construction) 39 Cylindrical storage tanks 1 Processing building 4 Shipping buildings 1 Loading rack 7 9-meter-diameter 8 3-meter-diameter 4, Horizontal storace tanks -9- TOP..SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 25X1 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Area Functional Description Equipment and Facilities J Unidentified Secondary 1 Unit with Processing 6 columns (one very large diameter) 6 banks of heat exchangers/ cooling coils/accumulators (one on top of a building) 2 pipe furnaces 1 processing building 2 pump buildings 2 support buildings 2 cylindrical storage tanks 3 meters in diameter Unidentified Secondary 1 Unit with Processing 4 columns 2 clusters of processing equipment 1 bank of heat exchangers/ cooling coils/accumulators 2 pipe furnaces 1 pump building 1 support building 2 cylindrical storage tanks, 3 meters in diameter Crude Oil Distillation and Desalting (1) Crude Oil Distillation 1 atmospheric column 1 vacuum column 8 other columns (4 are probably recycle columns) 2 clusters of processing equipment 3 banks of heat exchangers/ cooling coils/accumulators 3 pipe furnaces 3 processing buildings (one with 6 horizontal tanks) 1 pump building 8 cylindrical storage tanks (2) Desalting -10- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 M Storage and Shipping 2 Loading racks 24 Miscellaneous buildings 247 Cvlindrical StnranP tanks 25X1 1 Unit with 2 dehydrating spheres 4 horizontal desalting drums 5 horizontal settling drums 1 bank of heat exchangers 2 processing buildings 1 pump building 2 cylindrical storage tanks, 3 meters in diameter 29 9-meter-diameter 25X1 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Area Functional Description Equipment and Facilities Support and Unidentified Secondary Processing (1) Support (2) Unidentified Secondary Processing 34 Miscellaneous support buildings (two with overhead cranes) 1 Unit with 6 columns 1 processing building 2 horizontal storage tanks, 25X1 Thermal Cracking Possible Hydrotreating and Unidentified Secondary Processing 1 Support building 3 Units, each with 5 columns (one for vapor recovery) 4 banks of heat exchangers/ cooling coils/accumulators 2 pipe furnaces 1 pump building 1 compressor building 1 support building 2 cylindrical storage tanks, 3 meters in diameter 4 horizontal Stnrana tanks, 1 Possible hydrotreating unit with 7 columns 3 banks of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 pump building 1 compressor building 5 processing buildings (one with 4 horizontal tanks on the roof) 2 c lindrical sto ks, 25X1 4 horizontal storage tanks 25X1 1 U/I secondary processing unit with 4 columns 1 bank of heat exchangers/ cooling coils/accumulators 1 processing building 1 support building 1 U/I secondary processing unit with 4 columns 1 bank of heat exchangers/ cooling coils/accumulators 1 processing building 2 support buildings 3 horizontal tanks -11- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Area Functional Description Equipment and Facilities Lubricating Oil Plant (1) Solvent Extraction 5 Units, each with 6 columns 2 banks of heat exchangers/ cooling coils/accumulators 2 pipe furnaces 1 pump building one unit has a support building 3 cylindrical storage tanks, 3 meters in diameter 4 horizontal storage tanks, 9 meters long 17 Support buildings 3 Cylindrical storage tanks, 6 meters in diameter (2) Deasphalting 2 Units, each with 6 columns 1 cluster of processing equip- ment 2 banks of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 pump building 4 cylindrical storage tanks, 3 meters in diameter 3 horizontal storage tanks, 6 meters long 4 Support buildings (3) Probable Solvent Recovery 1 Unit with 2 columns 2 bank of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 pump building 1 support building 2 cylindrical storage tanks, 3 meters in diameter (4) Dewaxing 3 Units, each with 1 cluster of processing equip- ment 2 banks of heat exchangers/ cooling coils/accumulators 2 processing buildings 1 support building 1 overhead crane 1 cylindrical storage tank, 25X1 (5) Probable Dewaxing 1 Unit with 4 columns 1.cluster of processing equip- ment 2 banks of heat exchangers/ cooling coils/accumulators 3 processing buildings 2 support buildings 1 overhead crane -12- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF 25X1 25X1 Area Functional Description Equipment and Facilities Q (Cont) 1 Unit with 1 cluster of processing equip- ment 2 banks of heat exchangers/ cooling coils/accumulators 3 processing buildings 5 cylindrical processing/ storage tanks 1 overhead crane 1 cylindrical storage tank, (6) Clay Treatment diameter 2 Support buildings 14 Cvlindrical storane tanks, 25X1 1 Loading building with 2 cylindri- cal storage tanks, 25X1 2 Units, each with 4 columns 14 cylindrical treating tanks 2 pipe furnaces 1 processing building (one has a clay receiving section) 1 support building 4 cylindrical storage tanks R Desalting and Storage (1) Desalting (2) Storage 4 Units, each with 1 bank of heat exchangers/ cooling coils/accumulators 1 processing building 4 horizontal processing/ settling tanks 1 cylindrical storage tank, 3 meters in diameter (one unit has one additional storage tank) 25 Miscellaneous buildings 271 Cylindrical storage tanks 20 33-meter-diameter 1 27-meter diameter 36 9-meter-diameter 84 6-meter-diameter 65 Horizontal storage tanks 4 24-mPtPr-Innn 15 12-meter-long 3 Spherical storage tanks, 12 meters in diameter -13- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 25X1 25X1 25X1 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF horizontal storage tanks Area Functional Description Equipment and Facilities S Crude Oil Distillation 2 Units, each with 1 atmospheric column 1 vacuum column 8 other columns (4 are prob- ably rerun columns) 2 banks of heat exchangers/ cooling coils/accumulators 1 processing building with 7 horizontal tanks 2 pipe furnaces 1 pump building one unit has 1 support building 4 cylindrical storage tanks, 3 meters in diameter 1 Unit with 1 atmospheric column 1 vacuum column 3 other columns 3 banks of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 pump building 2 cylindrical storage tanks, 3 meters in diameter 1 Unit with 25X1 1 atmospheric column 1 vacuum column 3 other columns 3 banks of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 pump building 2 cylindrical storage tanks, 3 meters in diameter 3 horizontal storage tanks 3 Support buildings 13 Cylindrical storage tanks 9 9-meter-diameter 3, Horizontal storaae tanks, -14- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 1 pipe furnace 1 pump building 1 support building 2 cylindrical storage tanks, 3 meters in diameter 3 horizontal storage tanks with atmospheric column vacuum column other columns banks of heat exchangers/ cooling coils/accumulators 25X1 25X1 25X1 pproved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Area Functional Description Equipment and Facilities Blending, Treating and 1 Blending and treating unit with Shipping 1 building with 14 batch agitators/mixers 1 pipe furnace 1 processing building 1 pump building 5 cylindriral ctnrana tanks 1 Packing and snipping building 2 Shipping buildings 2 Support buildings 6 Cylindrical storage tanks 10 Miscellaneous buildings 19 Cylindrical storage tanks 2 12-meter-diameter 6 6-meter-diameter 4 3-meter-diameter 12 Horizontal storage tanks Unidentified Secondary 1 Unit with Processing 2 columns 1 cluster of processing equip- ment 3 banks of heat exchangers/ cooling coils/accumulators 1 processing building 1 pump building 1 cooling tower 2 support buildings 1 Unit with 1 column 3 processing buildings 1 support building 3 horizontal Stnrana tanks, Water Cooling 9 Cooling towers 43 Miscellaneous buildings (3 under construction) 11 Water basins W Possible Blending 1 Unit with 4 columns 1 possible blending building 4 cylindrical blending/storage tanks 5 horizontal blending/storage tanks -15- 25X1 TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Area Functional Description Equipment.and Facilities Possible Polymerization and Extraction (1) Possible Polymerization 1 Unit with 10 columns (3 are possibly re- run columns) 5 banks of heat exchangers/ cooling coils/accumulators 2 pipe furnaces 1 processing building 2 pump/compressor buildings 3 support buildings 4 cylindrical storage tanks 25X1 (2) Possible Extraction 1 Unit with 5 columns 1 cluster of processing equip- ment 3 banks of heat exchangers/ cooling coils/accumulators 1 compressor building 4 horizontal storage tanks, 6 meters long Probable Blending (1) Possible Blending 1 Unit with 5 processing buildings 3 support buildings 7 cylindrical storage tanks 1 6-meter-diameter 6 3-meter-diameter 11 horizontal storage tanks 25X1 10 6-meter-long (2) Probable Blending 1 Unit with 1 cluster of processing equip- ment 1 pipe furnace 1 probable blending building 20 cylindrical probable blend- ing tanks 2 horizontal probable blend- ing tanks 1 Support building 10 Cylindrical storage tanks -16- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Table 2. Equipment and Facilities at Kuybyshev Petroleum Refinery No. 2 Southwest Section (Keyed to Figure 6) Functional Description Desalting Administration, Support and Unidentified Secondary Processing (1) Administration and Support (2) Unidentified Secondary Processing Thermal Cracking and Probable Thermal Alkylation (1) Thermal Cracking Equipment and Facilities 1 Unit with 1 cluster of processing equip- ment 1 bank of heat exchangers/ cooling coils/accumulators 1 processing building 4 cylindrical treating/storage tanks 4 horizontal treating/storage tanks 2 Units, each with 1 bank of heat exchangers/ cooling coils/accumulators 1 processing building 1 cylindrical treating/storage tank 5 horizontal treating/storage tanks 1 Unit with 1 bank of heat exchangers/ cooling coils/accumulators 1 processing building 5 horizontal treating/storage tanks 1 Unit with 1 bank of heat exchangers/ cooling coils/accumulators 1 processing building 1 horizontal treating/storage tank 2 Support buildings 46 Miscellaneous buildings 1 Unit with 3 columns 1 processing building 2 Units, each with 5 columns (one for vapor re- covery) 4 banks of heat exchangers/ cooling coils/accumulators 2 pipe furnaces 1 pump building 1 compressor building 1 support building (one unit has 2 support buildings) 2 cylindrical storage tanks, 3 meters in diameter 3 horizontal storage tanks, 25X1 -17- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Q Next 1 Page(s) In Document Denied Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Area Functional Description Equipment and Facilities (2) Probable Thermal Alkylation (3) Probable Thermal Alkylation (Being Dismantled) Gas Fractionation and Possible Hydrotreating (1) Gas Fractionation 1 Unit with 4 columns 2 clusters of processing equip- ment 1 pipe furnace 1 pump building 1 support building 2 cylindrical storage tanks, 3 meters in diameter 1 Unit with 6 columns 4 clusters of processing equip- ment 1 bank of heat exchangers/ cooling coils/accumulators 2 compressor buildings 6 support buildings 2 cylindrical storage tanks, 3 meters in diameter horizontal storage tanks (2) Possible Hydrotreating 1 Unit with 7 columns 2 clusters of processing equip- ment 3 banks of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 pump building 1 compressor building 2 support buildings 2 cylindrical storage tanks, 3 meters in diameter 12 horizontal storage tanks, Catalytic Cracking 3 Thermofor (moving-bed) units, each with 3 columns (one unit has 4 columns) 1 cluster of processing equip- ment 1 bank of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 pump building 1 blower building with 3 blowers 3 support buildings 6 cylindrical storage tanks 25X1 has an additional horizontal storage tank, 15 meters long) ~ww wr/wrT 1I Irr Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Area Functional Description Equipment and Facilities EE (Cont) 1 U/I processing unit with 1 cluster of processing equip- ment 1 compressor building 4 support buildings 1 horizontal storage tank, 25X1 6 Support buildings (one is under construction) 3 Horizontal storage tanks FF Alkylation 1 Unit with 5 columns (includes a debutanizer, deisobutanizer, depropanizer and a rerun column) 1 bank of heat exchangers/ cooling coils/.accumulators 1 reactor building with 4 reactors 1 settler and acid recovery building with 8 horizontal tanks 1 caustic reclamation building with 1 horizontal tank 6 cylindrical surge, recycle and feedstock tanks 1 distillation building 1 pump building 2 horizontal acid tanks 3 mixer/storage tanks 1 support building 3 Support buildings Unidentified Secondary 1 Unit with Processing 4 columns 1 cluster of processing equip- ment 3 banks of heat exchangers/ cooling coils/accumulators 2 pipe furnaces 1 pump building 1 support building 2 cylindrical storage tanks 1 6-meter-diameter 1 3-meter-diameter horizontal storage tanks, 1 Unit-with tih 2 columns 1 cluster of processing equip- ment 1 compressor building 1 support building 1 horizontal storage tank 2 gasholders, diameter -21- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 25X1 25x1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP ' SECRET 'RUFF Area Functional Description Equipment and Facilities HH Possible Polymerization and Extraction (1) Possible Polymerization 2 Units, each with 10 columns (3 are possibly rerun columns) 1 cluster of processing equip- ment 2 banks of heat exchangers/ cooling coils/accumulators 2 pipe furnaces 1 processing building 2 pump/compressor buildings 1 support building 2 cylindrical storage tanks, 3 meters in diameter (2) Possible Extraction 2 Units, each with 5 columns 1 cluster of processing equip- ment 3 banks of heat exchangers/ cooling coils/accumulators 1 compressor building 2 support buildings (one unit has 3 support buildings) 2 horizontal storage tanks, 6 meters long 2 Support buildings Unidentified Secondary Processing 1 Unit with 5 columns 1 cluster of processing equip- ment 2 banks of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 processing building 1 pump building 5'cylindrical storage tanks, 3 meters in diameter 2 horizontal storage tanks, 6 meters long JJ Possible Blending 1 Unit with 1 cluster of processing equip- ment 1 bank of heat exchangers/ cooling coils/accumulators 2 possible blending buildings 6 cylindrical blending/storage tanks 6 horizontal blending/storage tanks Unidentified Secondary 1 Unit with Processing 1 large processing building connected to a smaller build- ing by a conveyor 2 other processing buildings 1 support building TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Area Functional Description Equipment and Facilities 2 6-me er-diame er 7 Support buildings 7 Gasholders LL Storage 2 Cooling towers 9 Support buildings 78 Cylindrical storage tanks 4 27-meter-diameter 5 12-meter-diameter 4 6-meter-diameter 39 Horizontal storage tanks 2 15-meter-long 21 12-meter-long 8 6-meter-long 2 Spherical storage tanks, 12 meters in diameter 1 Semiburied storage tank (not measured) 1 Water basin 25X1 MM Crude Oil Distillation 2 Units, each with 1 atmospheric column 1 vacuum column 5 other columns 4 banks of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 pump building 2 support buildings 4 cylindrical storage tanks 25X1 4 horizontal storage tanks 3 6-meter-long 1 Unit with 1 processing building 1 small building with a hori- zontal tank 1 Unit with 1 processing building 5 horizontal storage tanks, 6 meters long 1 Unit with 1 processing building 3 cylindrical storage tanks 25X1 .TOP SECRET RUFF. Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Area Functional Description Equipment and Facilities 2 Units, each with 1 atmospheric column 1 vacuum column 3 other columns 4 banks of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 pump building (one unit has 2 pump buildings) 1 support building (one unit has 2 support buildings) 2 cylindrical storage tanks. 25X1 (one unit has 2 additional tanks, 3 meters in diameter) 3 horizontal stora e tanks 1 25X1 2 6-meter-long (one unit has 2 additional tanks, 6 meters long) 9 Support buildings 5 Cylindrical storage tanks 4 9-meter-diameter 1 6-meter-diameter NN Storage 6 Miscellaneous buildings 168 Cylindrical storage tanks 3 33 27 45 4z 12 Horizontal storage tanks, 18 meters long . 00 Possible Blending 1 Unit with 1 cluster of processing equip- ment 11 short processing columns 3 possible blending buildings 6 cylindrical storage/blend- ing tanks 6 horizontal storage/blend- ing tanks 1 Unit with 2 short processing columns 1 possible blending building with 6 horizontal tanks 3 support buildings 4 cylindrical storage/blend- ing tanks 2 cylindrical storage tanks, 6 meters in diameter horizontal storage tanks, 25X1 TOP SECRET' RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Area Functional Description Equipment and Facilities QQ RR Lubricating Oil Plant (1) Solvent Extraction 3 Units, each with 6 columns 2 banks of heat exchangers/ cooling coils/accumulators 2 pipe furnaces 1 pump building 3 cylindrical storage tanks, 3 meters in diameter 4 horizontal storage tanks, 9 meters long 3 Support buildings (2) Probable Solvent 1 Unit with Recovery 3 columns 1 bank of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 pump building 1 support building 3 cylindrical storage tanks, 3 meters in diameter 3 Support buildings 2 Cylindrical storage tanks, 3 meters in diameter 2 Horizontal storage tanks, (3) Deasphalting 2 Units, each with 6 columns 1 cluster of processing equip- ment 2 banks of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 pump building 5 cylindrical storage tanks (one unit has 6), 3 meters long 3 horizontal storage tanks, 6 meters long -25- TOP SECRET RUFF Unidentified Secondary 1 Unit with Processing 2 columns 2 banks of heat exchangers/ cooling coils/accumulators 1 pipe furnace 1 pump building 1 support building 2 cylindrical storage tanks, 3 meters in diameter 3 horizontal storage tanks, 6 meters long Unidentified Secondary 1 Unit with Processing 3 clusters of processing equip- ment 1 bank of heat exchangers/ cooling coils/accumulators 4 horizontal processing tanks 1 pipe furnace 1 pump building 1 support building 7 cylindrical storage tanks 1 6-meter-diameter 6 3-meter-diameter 1 horizontal storage tank, Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Area Functional Description Equipment and Facilities RR (Cont) (4) Clay Treatment 1 Unit with 4 columns 13 cylindrical treating tanks 2 pipe furnaces 1 processing building with clay receiving section 2 support buildings 2 cylindrical storage tanks, 3 meters in diameter 5 Support buildings (5) Dewaxing 2 Units, each with 1 cluster of processing equip- ment 2 banks of heat exchangers/ cooling coils/accumulators 2 processing buildings 1 support building 1 overhead crane 1 c 25X1 5 Miscellaneous buildings (6) Probable Dewaxing 1 Unit with 1 cluster of processing equip- ment 2 banks of heat exchangers/ cooling coils/accumulators 4 processing buildings 7 cylindrical processing/stor- age tanks 1 shipping building 1 overhead crane 1 cylindrical storage tank, Blending, Treating and 1 Blending and treating unit with Shipping 1 building with 11 batch agitators/mixers 1 pipe furnace 1 processing building 1 pump building 2 support buildings 4 cylindrical storage tanks 25X1 Storage, Support and 4 Loading racks Shipping 47 Miscellaneous buildings 24 Hori7nn+nl 4-11- 2 1 -26- TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 25X1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 TOP SECRET RUFF Area Functional Description Equipment and Facilities UU Shipping and Probable 1 Probable blending and treating Blending and Treating unit with 1 processing building 7 probable blending and treat- ing tanks 34 Miscellaneous buildings (includes several processing and probable blending and treating buildings) 5 Cylindrical processing/storage tanks 9 Horizontal processing/storage tanks VV Water Treatment and Cooling 9 Cooling towers (one is under construction) 32 Miscellaneous buildings (3 are under construction) 12 Cylindrical storage tanks 5 15-meter-diameter 2 12-meter-diameter 5 25X1 35 Water basins TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 1 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 25X1 TOP SECRET RUFF -1 25Ai Map 8th RTS. US Air Target Chart, Series 200, Sheet - November 1967, Scale 1:200,000 (SECRET 1. Army. Report No. ID 2191426, November 1961 (CONFIDENTIAL) Requirement COMIREX N02 Support Number 429222 25X1 25X1 TOP SECRET RUFF Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0 Top Secret Top Secret Approved For Release 2008/06/18: CIA-RDP79T00909A000500010001-0