CONTRACT INSPECTION REPORT
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP79B00873A001900010006-8
Release Decision:
RIPPUB
Original Classification:
C
Document Page Count:
2
Document Creation Date:
December 28, 2016
Document Release Date:
August 30, 2012
Sequence Number:
6
Case Number:
Publication Date:
January 14, 1970
Content Type:
FORM
File:
Attachment | Size |
---|---|
![]() | 117.23 KB |
Body:
n CPPDPT F.7=1 P(AMCInCUTILI nn77,mr,r.;
Declassified in Part - Sanitized Copy Approved for Release 2012/08/30: CIA-RDP79B00873A001900010006-8
?410
CONTRACT NO.
TASK NO.
25X1
CONTRACT INSPECTION REPORT
(m:)
TO:
DATE .
14 January 1970 ,
1
OL/PD/WCP0
INSPECTION REPORT NO. (If final, so state)
8
1036 Ames Building
ESTIMATED COMPLETION DATE ?
15 March 1970 '
NAME OF CONTRACTOR
Corning Glass Works
TYPE OF COMMODITY OR SERVICE
Improved Rear Projection Screen
?
. .
THE CONTRACTOR IS ON SCHEDULE
El YES NO
THE CONTRACTOR WILL PROBABLY REMAIN WITHIN ALLOCATED
FUNDS cg YES 13 NO IF ANSWER IS "NO" -ADVISE REC-
OMMENDATION AND/OR ACTION OF SPONSORING OFFICE. ON
PER CENT OF WORK COMPLETED - 92%
PER CENT OF FUNDS EXPENDED - 12%
REVERSE HEREOF. It KNOWN. INDICATE MAGNITUDE OF AD.
DITIONAL FUNDS INVOLVED.
?
. HAS AN INTERIM REPORT. FINAL REPORT. PROTOTYPE.
DURING THE PERIOD? 0 YES El NO (If yes, give
HAS GOVERNMENT-OWNED PROPERTY BEEN DELIVERED TO
(If yes, indicate items, quantity, and. cost on reverse
OR OTHER END ITEM BEEN RECEIVED FROM THE CONTRACTOR
details on reverse side.)
CONTRACTOR DURING THIS PERIOD? El YES 0 NO
side.) .
INCENTIVES
IS THIS AN INCENTIVE CONTRACT 0 YES Ki NO
IF YES. CHECK TYPE
El COST El :IVO 0 PERFORMANCE li DELIVERY
NOTE:
USE REVERSE SIDE FOR COMMENTS.
FINAL REPORT MUST CONTAIN INCENTIVE EVALUATION.
OVERALL PERFORMANCE OF CONTRACTOR
1 . OUTSTANDING 4.
2. EXCELLENT 5.
3. VERY GOOD
IF OVERALL PERFORMANCE OF CONTRACTOR
REASONS ON REVERSE SIDE.
ABOVE AVERAGE 7. UNSATISFACTORY
AVERAGE
MINIMUM ACCEPTABLE
IS UNSATISFACTORY OR MINIMUM ACCEPTABLE INDICATE
- -RECOMMENDED ACTION
AND
APPLICABLE.
CONTINUE AS PROGRAMMED
CLOSEI,OUT-.? ?OTHER
...? _
IF THIS IS 4 FINAL REPORT PUT COMMENTS ON REVERSE
CERTIFY THAT ALL DELIVERABLE ITEMS UNDER THE CONTRACT
THE FOLLOWING:
IN
,. .... _
WITHHOLD PAYMENT PENDING
SATISFACTORY PERFORMANCE
,
(Specify)
NARRATIVE FORM ON CONTRACTOR'S PERFORMANCE
HAVE BEEN RECEIVED. THESE INCLUDE. WHERE
- ITEM
.,REC'D
DOES NOT.
APPLY
ITEM -
'
:PEC 'D
DOES NOT
' APPLY
PROTOTYPES
MANUALS
DRAWINGS AND SPECIFICATIONS
FINAL REPORT
PRODUCTION AND/OR OTHER
END ITEMS' -
SPECIAL'TOOLING -
'OTHER GOVERNMENT PROPERTY
DATE OF LAST CONTACT WITH-CONTRACTOR
l6 December 1069 _
DIVISION 25X1
- ,
TSSG/RjD/SRB:-
25X1
FORM USE
'12-67 1897 r!E yo us UNCLASSIFIED 171 CONE IDENTIAI (?I SECRET (12.36)
_Declassified in Part - Sanitized Copy Approved for Release 2012/08/30: CIA-RDP79B00873A001900010006-8
I
.1,13.1.71fflaa.? -v.. A , .? " , ?
Declassified in Part- Sanitized Copy Approved forRelease2012/08/30 : CIA-RDP79B00873A001900010006-8
nARRAII\, )REFORI
1 La lily Ti r rirk L
,'
r The -contractor has reviewed the Boeing report covering
the subjective test of the scattering particle screens.. Corning's
analysis of the report indicates that ?the efficiency of the
screens, including the commercially available Polacoat .screen
used as a comparison, was limited by the capability of the Govern-
ment furnished rear projection viewer used in the tests. Even so,
from a relative standpoint, two of the Corning screens showed im-
proved characteristics over the Polacoat screen. No further work
will be attempted on improving the scattering screens, the major
emphasis now being directed toward perfection of the lenticular.
screen..
2. Research is being conducted on methods of forming the
lenticules on various substrates. This investigation should be
completed ,by 1 February 1910. The technique for manufacturing the
mask is nearing completion and a-usable sample screen should be
forthcoming sometime during the month of February.
3. Total Authorized Funds - Original Contract
(. ?
25X1
UNCLASSIFIED CONF !DENT IAL DSECRET
Declassified in Part - Sanitized Copy Approved for Release 2012/08/30: CIA-RDP79B00873A001900010006-8_