REQUEST FOR APPROVAL TO EXPAND (SANITIZED)ROM FY 1970 FUNDS FOR A GROUND ORDER OF BATTLE RESOLUTION STUDY CONTRACT (SANITIZED)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79B00873A001600040010-3
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
7
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 22, 2012
Sequence Number: 
10
Case Number: 
Publication Date: 
April 23, 1970
Content Type: 
MEMO
File: 
AttachmentSize
PDF icon CIA-RDP79B00873A001600040010-3.pdf355.13 KB
Body: 
25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/22 : CIA-RDP79B00873AO01600040010-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/22 : CIA-RDP79B00873AO01600040010-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/22 : CIA-RDP79B00873AO01600040010-3GX1 Copy 8 MEMORANDUM FOR: Director, National Photographic Interpretation Center Request for Approval to Expend from FY-1970 Funds 25X1 for a Ground Order-of-Battle-Resolution-Study Contract, --for-a contract.- The specific - request is contained in paragraph 7. 2. Image quality requirements for satellite reconnaissance-systems-. --exert a major influence on the costs of such systems., The more stringent the specifications, the higher the development and production costs.. Pho- tographic ground resolution is a primary` image quality variable-affecting intelligence extraction from reconnaissance exploitation. Empirical' de= termination of information yield as a function of improving image resolu- -tion can provide a critical input to objective acquisition system design. Through the use of controlled imagery, simulating potential optical system capabilities, resolution break points may be established-.for specific tar-.- gets. These cutoffs, beyond which no further useful intelligence informa- tion can be extracted from photography, act as guidelines. to collection- planners who are thus able to--compareintelligence-requ?irements on-one- hand with attendant system par-ame-ter-s- and--costs on-the other.-_ Conver-se.ly..,..- once the parameters. of a -new._reconnaiss . ance-system. have-been designated,`. those requirements that the:system..can be expected to.fulfill.may be com-. piled objectively by empirical investigations of PI output as a function of .antic?ipated,image--quality...Results of such studies must be target .specific, since interpretation of targets consisting of large components usually can be accomplished with=poorer =ground.-resolution than that re- .quired for targets containingsmall components. Furthermore-usable re-- suits must be specific to particular.Pl-functions. Mere target identifi- cation as the interpreter's goal can generally be?achieved with poorer image duality than that needed for detailed-technical' anal-Vs1s -of .the -same "`"...a U.Ctis? 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/22 : CIA-RDP79B00873AO01600040010-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/22 : CIA-RDP79B00873AO01600040010-3 U SUBJECT: Request for Approval to Expend from FY-1970 Funds for a Ground Order-of-Battle Resolution Study Contract will treat ground order-of-battle (GOB) targets. This ed study to be conducte~ object category is of high priority in the Intelligence Community in terms of both current denied area assessment via satellite reconnaissance and future SALT environment inspection capabilities. Previous investigations, of intelligence extraction as a function of photographic ground resolution have been conducted for such targets as aircraft, ICBM sites, and mobile 'radars. The results of these studies have proven to be of great interest and assistance to Community planners. Each study has produced results unique to the specific target under consideration. The radar investigation resulted indication of the most stringent ground resolution require- ment because of the many small electronic components included in the a. g . hoto interpretation requirements in the GOB category are becoming increasingly more detailed. It may very well be that future analysis requirements can be met only by ground resolutions even finer than those presently indicated for the electronics targets. 4. Developing data on intelligence extraction in the particular area of ground order-of-battle equipment--as a function of photographic ground resolution--will enable NPIC to respond with greater precision to -----the--needs--of -collection-system--designers--and- resource-planners. Such responses, giving proven technical data about the degree and quality of intelligence which could be obtained relevant to various design resolutions, enable better judgments to be made concerning value versus costs of alter- native designs and objectives. 5. The primary objective of the proposed project will be to consider,GOB tar et information contained within.the photographic reso- lution-range re resenting a hypothetical optimum system, to represen ing rendition at approximately 400 obliquity. The imagery utilized will simulate as closely as practicable the modulation transfer function and scale as well as the resolution of present and proposed acquisition systems. The study will employ NPIC photo inter- preters and/or external PI's performing similar-GOB analysis functions. 25X1 - 25X1 25X1 25X1 25X1 25X1 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/22 : CIA-RDP79B00873AO01600040010-3 _ _ = = a 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/22 : CIA-RDP79B00873AO01600040010-3 SUBJECT: Request for Approval to Expend~ from FY-1970 Funds for a Ground Order-of-Battle Resolution Study.Contract Final results of the investigation should be available to the Community several months in advance of the impact upon the Center, thus enabling Center management to ma. e a practica of GOB readout functional assignments and capabilities in th environment. The study's results will also depict those GOB requirements, if any, which can be satisfied only with a ground resolution better than that expected from the improved The proposed project will consist of two major phases, data collection and data analysis. A final technical report will be prepared upon completion of the study. D is currently under a separate contract to prepare for the study by executing an experimental design, by coordinating the acquisition and processing of domestic GOB imagery and ground truth data, and formatting the required experimental materials. 25X1 25X1 25X1 25X1 6.I has been chosen to perform the proposed project because of 25X1 the contractor's experience gained and competence demonstrated on similar previous efforts for NPIC. It is deemed inadvisable at this time to re- quest open bids-on such a project due to the absence of any other cleared contractor well-versed in the extremely specialized nature of the research involved. Estimated price of the work to be done under this contract is under a separate Time and Materials contract 25X1 to NPIC, is.assisting proposed herein, under both FY-70 & FY-71 funds. Eastman Kodak is ing the image processing portion of this program for approximately 25X1 under PAR 255 of Domestic, high resolution photo coverage 25X1 of GOB is being flown by an OSA/DDS&T aircraft covered by approxi- mately 77of miscellaneous services funds transferred from NPIC. 25X1 7. Successful completion of this contract could lead to further image quality requirements studies to contribute to NPIC's imagery exploitation planning. However, additional investigations of photographic ground reso- as a critical variable probably will not be required. Similar studies lution employing the simulated products of unconventional sensor systems, such as line-scan, side-looking radar, or infra-red, are likely future requirements. several tasks in the current contract. It 25X1 is anticipated that will continue its support role to the effort 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/22 : CIA-RDP79B00873AO01600040010-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/22 : CIA-RDP79B00873AO01600040010-3 SUBJECT: Request for Approval to Expend from FY-1970 Funds for a Ground Order-of-Battle Resolution Study Contract .9. It is requested that the negotiation with' Incorporated, for a contract to conduct the program described at a cost not to exceed ~~ be approved. Chief, Technical Services & Support Group, NPIC Attachments: 1. Proposal 2. Form 2420 APPROVED: ARTHUR C. LUNDAHL Director National Photographic Interpretation Center Distribution: Copy l.- NPIC/TSSG/SC&PS 2 - NPIC/ODir 3 & 4 - NPIC/TSSG 5 - NPIC/TSSG/RED 25X1 25X1 25X1 Js 25X1 25X1 r'r 25X1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/22 : CIA-RDP79B00873AO01600040010-3 C SSIr,i, _ r F"P.? , ;_,^, I l l.i[~~..L~'~~~~IIILe??~ Declassified in Part - Sanitized Copy Approved for Release 2012/08/22 -CIA-RDP79B00873A001600040010-3 -"'l " ~EQUEST TO PROCUREMENT D!VISIO0 R SERVICES Ig (other than property or building maintenance and repairs) OFFICE/DIY/BR REQUEST NO DATE OF REQUEST I CERTIF 25X1 NPIC/TSSG/RED/ATB ~~D(~- 4~d AMOUNT D AVAILABL PROJECT TITLE PRO SIGNATURE OF BUDGET OFFICER 25X1 Ground Order of BatedResoluti ti 7 CONTRACTOR (if known) PROPOSAL NO. AND DATE CONTRACT & TASK ORDER NO. (if ;no--I 24 Feb. 1970 New Contract (CPAF) 25X1 TYPE OF SERVICE REQUESTED APPLICABLE ONLY TO REPAIRS- AND MODIFICATIONS TECHNICAL INSPECTION IS REQUIRED BY X RESEARCH/DEV TRANSFER OF FUNDS TO OTHER GOVT AGENCY O'RECE IYING DEPOT T & I TECHNICAL MONITOR GRANT . (specify if applicable) ITEMS TO BE PICKED UP OR O SERVICES PERFORMED AT REPAIR : MAINTENANCE ITEMS TO BE REDELIVERED TO: MODIFICATION STERILITY CONTRACT CLASSIFICATION WORK CLASSIFICATION HARDWARE CLASSIFICATION REPORTS CLASSIFICATInti 25X1 S TS -- S SHORT SUBSTANTIVE TITLE AND/OR DESCRIPTION OF SERVICE TO BE PERFORMED An investigation to define photographic ground resolution. requirements for the interpretation of ground order of battle targets on the imagery from various present and proposed reconnaissance. (See reverse for specific informa re i d & 25X1 ou re on R D requests.) DESIGNATION DATE 23 APR 1970 PROCUREMENT DIVISION USE DATE RECEIVED IN PD RECORDED BY SECTION ASSIGNED TO NEGOTIATOR 3067 2420 2REPLCES FORMS 420A AND 2416 UNCLASSIFIED WHICH MAY BE CONFIDENTIAL ? SECRET Q (specify) Declassified in Part - Sanitized Copy Approved for Release 2012/08/22 : CIA-RDP79B00873AO01600040010-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/22 : CIA-RDP79B00873AO01600040010-3 peclry) ~... .11151'IIICAI'ION FOR SOURCE CT I ON 25X1 Bi - -----X _OF__C.O P IES --K]-MONTHLY *(3) .__ IARDWARE-(state type and.number SPECIAL INSTRUCTIONS'-- QUARTERLY Q FINAL *(25) UNCLASSIFIED LJ CONFIDENTIAL ? SECRET (specify) Declassified in Part - Sanitized Copy Approved for Release 2012/08/22 : CIA-RDP79B00873AO01600040010-3 Follow-on to Contract