STATUS REPORT FOR PERIOD 1 MAY THROUGH 31 MAY 1969 SUBMITTED UNDER CONTRACT TO U.S. GOVERNMENT CONTRACT NO. (SANITIZED)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79B00873A001500010008-0
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
58
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 17, 2012
Sequence Number: 
8
Case Number: 
Publication Date: 
June 5, 1969
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79B00873A001500010008-0.pdf1.27 MB
Body: 
1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 OSRA Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 STATUS REPORT for Period 1 May through 31 May 1969 Submitted under Contract to U. S. Government File No. 11038 tzr STAT /, Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 t=1 L,1 This document is presented as the Monthly Status Report under Contract to the U. S. Government, The report period represented herein covers the Period 1 May through 31 May 1969. STAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 -1i Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 7 INDEX Program Status Summary Page 1 Task 1 Statements of Work, Specifications, Report Preparation 2 Task 2 Scheduling and Planning 3 Task 3 Test and Inspection Procedures 4 Task 4 Management, Administration and Supervision 5 Task 5 Meetings 6 Task 6 Facilities Requirements 7 Task 7 Main Frame 8 Task 8 Skin 9 Task 9 Granite and Ways Assembly for Stages 10 Task 10 Air Bearings 11 Task 11 Stage Drives 12 Task 12 Film Drives 13 Task 13 Film Platen 14 Task 14 Film Cooling 15 Tasks 16, 17, 18 Optics 16 Task 20 General Platen Illumination 17 Task 21 Optical Bridge 18 Task 22 Interferometer Assembly 19 Task 23 Optics Drives 20 Task 24 Image Analysis System 21 Task 26 Digitizing Logic 22 Task 27 Metric Readout 23 Task 28 Output Logic and Interface 24 Task 29 Cabling 25 Task 30 Control Console and Chair 26 Task 32 Computer 27 Task 33 Electronic Racks and Control Cabinets 28 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 rl Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 ezi 77 Index (cont'd .) Page Task 34 Utilities, Vacuum and Air Systems 29 Task 35 Vibration Absorption and Leveling 30 Task 36 Overall Assembly 31 Task 37 R.F.I. Suppression 32 , Task 38 Environmental Control 33 ; Task 39 Reliability Analysis 34 Task 40 Installation 35 , Task 42 Breadboards and Test Services 36 Task 43 Computer Programming and Services 37 , Task 44 Preacceptance Test in Fabrication Plant 38 , Task 45 Acceptance Test in Fabrication Plant 39 Task 46 Acceptance Test after Installation 40 Task 47 Instruction Manuals 41 Task 48 Spare Parts Lists 42 Task 49 Operator Training 43 11 I Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 APPENDICES Report - for period ending STAT Progress April 30, 1969 Appendix I Progress Report - for period STAT ending April 30, 1969 Appendix II 111 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010008-0 fl r7. PROGRAM SUMMARY Scheduled Percentage of Completion Actual Percentage this Date 63.0% 59.3% This report period has been highlighted by the completion of several tasks which can be considered to be major bench marks of the program. Clean Room facility has been completed STAT and the air conditioning system is in the process of being balanced. for most efficient operation. 2. All electronic cabinets have been installed and interconnecting cabling is in the process of installation, 3 The control console has been positioned and attendant cabling installed. 4. The stages, air bearings and drives have been installed and aligned, In addition, the electronic subsystems checkout is well underway and computer program checks are being run, Also the utilities cabinet and peripheral gear is in its final assembly stage. These accomplishments and other program efforts are covered more completely under individual Task headings. -1 - 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 1=1 ^ Task 01 Statements of Work, Specifications, Report Preparation Scheduled percentage of completion 65% Actual percentage this date 65% No new specifications were developed or issued during this report period. Monthly reports from our subcontractors are incorporated into this document under appropriate task headings or in the Appendix. -2- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 02 Scheduling and Planning ^ Scheduled percentage of completion 65% Actual percentage this date 65% Detailed schedules for assembly and test of mechanical and electronic subassemblies were implemented during this report period. Detailed schedules for systems checkout and? tests are now being prepared in connection with the completion of the Optical system by Declassified in Part- Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 HL Task 03 Test and Inspection Procedures Scheduled percentage of completion 51% Actual percentage this date 45% Work, is progressing in the development of test procedures to be implemented in the various subcontractor's plants. It is expected that the first of these tests will be conducted at during July 1969. STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 1 1=1 Task 04 Management, Administration and Supervision 7 1=1 1=1 7 ????? Scheduled percentage of completion Actual percentage this date 65% 65% Management and Administrative functions are proceeding normally with no major departures from the original Management plan. -5- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 4=1 Task 05 Meetings held at Scheduled percentage of completion 65% Actual percentage of completion 65% During the month of May, a series of meetings was with a group of customer representatives. These meetings were held for the purpose of acquainting the customer with the technical programs and achievements attained by and to provide the Site Contractor with further information related to required environmental cpnditions. Task 38 provides further details of the environmental discussion. -6- ? S TAT F1' Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 STAT 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 06 Facilities Requirements 7 at t =I Scheduled percentage of completion 98% Actual percentage this date 85% During this report period the Clean Room Facility has been activated and the air conditioning equipment is in the process of being balanced to provide proper laminar flow conditions in the room and cooling environment within the cabinets and machine. Installation of all electronic cabinets was accom- plished in May and systems test and checkout is now being con- ducted in the area. -7- :17 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 k 4, Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 07 Main Frame and Structural Elements Scheduled percentage of completion 98% Actual percentage this date 93% The main frame for the Stereocomparator was completed in September 1963. No additional work will be scheduled for this Task until the return of the Optical Bridge by the optics sub- contractor. -8- 71 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 08 Skin Scheduled percentage of completion 35% Actual percentage this date 30% The fabrication of the external skin sections has been completed to the point where the total assembly is needed in order to finish this Task. No further work is anticipated until the Stereocomparator has been completely assembled. -9.- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 09 Granite and Ways Assembly for Stage this time. Scheduled percentage of completion 98% Actual percentage this date 95% No further work is anticipated on this Task at - 1 0- 17 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 r r? Task 10 Air Bearings Scheduled percentage of completion 89% Actual percentage this date 85% As previously reported, the air bearings were installed on both stages in February. No further work will be scheduled until the utility cabinet is completed, at which time the bearings will be tested. -11- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 11 Stage ,Drives Scheduled percentage of completion 78% Actual-,percentage this date 65% Installation of the stage drive assemblies on the right and left hand stages was completed during this report period. Testing of the assemblies will be conducted after the utilities cabinet has been completed. ? -12- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 1=i 1=1 Task 12 Film Drive and Transport System Scheduled percentage of completion 60% Actual completion this date 68% The modified film drive and transport system is in the process of installation. Formal testing will be accomplished during the next report period. -13- fl Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 F Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 13 Film Platen and Film Clamping Scheduled percentage of completion Actual percentage this date 90% 75% The platens have been scheduled for installation and test during the next report period. -14-- Lri Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 1=1 t= r- i=1 Task 14 . Film Cooling Scheduled percentage of completion 70% Actual percentage this date 50% The utilities cabinet design has been modified to provide the additional valves and tubing required for film cooling. These valves have been ordered and will be installed during the next report period. -15- [I Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 IT! t=3 Tasks 16, 17 and 18 Viewing Optics, Viewing Illumination, Reticle Projector and Illumination Scheduled percentage of completion 75% Actual percentage this date - 73% A monitoring trip to was made during the STAT week of May 26, 1969 which indicated they are making steady progress. They are preparing a revised delivery schedule which should be available by the middle of June. The anamorph system electrical sliprings have been shipped to, and received in good order by Practically all STAT the necessary hardware items have now been received at The STAT outstanding items include a few servo motors and potentiometers which are presently in use at in connection with the servo simulation STAT tests. end of June. These items are scheduled to be sent to at the STAT -16- ' II Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 171 fl Task 20 General Platen Illumination Scheduled percentage of completion 88% Actual percentage this date 47% No additional work was scheduled for this task for the month of May. -17- n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 fl t=1 Task 21 Optical Bridge and Supports Scheduled percentage of completion 90% Actual percentage this date 90% Duting the month of May, continued to send STAT. to the optics subcontractor drawings detailing the wiring installa- tions and connectors for their use in interfacing the optical bridge with the optics system. A further shipment to the optical subcontractors of motors, potentiometers and related equipment will be made in mid- June. This equipment will be installed with other furnished STAT equipment. -18- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 7'4 1=1 1 1=1 Task 22 Interferometer Assembly Scheduled percentage of completion 73% Actual percentage this date 57% The lasers and beamsplitters have been installed on the Stereocomparator and the installation of the laser mirrors is in process. It is anticipated that interferometer checkout will be performed during the month of June. -19- 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 - ' 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 t=1 1=s Task 23 Optics Drive Assembly Scheduled percentage of completion 71% Actual percentage this date 65% Work continued on the system aspects of the optics drives (see Task #42, Breadboards). Some modifications to the D/A - A/D converter were incorporated in order to provide com- patibility with the computer logic. Tests were run on these chassis, and it appears that noise levels and drift in these systems is down to a level below one least count of the digital system (1 part in 1, 024). It is therefore expected that operation of these units will be entirely satisfactory for the machine. During the month of June, the computer-controlled optics drives will be thoroughly clicked. A computer-simulation model of the automatic brightness control loop was programmed, and it was found that system operation was satisfactory in the regions of film density greater than 1.0. However, some stability problems were encountered in the region of low film density, where the system is supposed to depart from constant brightness characteristics. The design parameters require the automatic brightness control System loop to be a variable function, and it was found that for magnifications greater than about 18.0, possible instabilities could develop. Further work remains to be done on this problem but no difficulty is anticipated. -20- 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 24 Image Analysis System Scheduled percentage of completion 71% Actual percentage this date 80% Progress on this task is detailed in Progress Report for the period ending April 30, 1969 which is included as Appendix I. The plant 6 was visited by three representatives on May 23 for a routine project review. A sub- stantial portion of the Hardware was seen in its completed form including the test fixtures and associated equipment. Various film samples were selected for the acceptance tests which are presently scheduled for the week of July 7, 1969. -21- S TAT STAT STAT 11 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 1=1 t:3 tz3 Task 26 Digitizing Logic Subassembly Scheduled percentage of completion 98% Actual percentage this date 86% This Task is now covered under the discussion in Task 28-Output Logic and Interfaces. Please refer to this Task. n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 n. fl 1=1 Task 27 Metric Readout tz, 1=e Scheduled percentage of completion 98% Actual percentage this date 95% This Task is now covered under the Output Logic and Interfaces Task 28. Please refer to this task for progress discussion. -23- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 ^ Ca Li Task 28 Output Logic and Interface Scheduled percentage of completion 98% Actual percentage this date 78% This Task now consists of the subsystems/systems tests for Tasks 26 and 27 as well as 28. During this report period emphasis was placed on the testing of computer interface with the AD/DA converter in order to provide the tools for optics simulation tests (Task 23), At this writing, there are two more weeks of intensive work scheduled in this area. It is anticipated that this portion of the system checkout and test will be followed by checkout of the film drive and stage drive logic. -2 4- El Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 7 1=i Task 29 Cabling Scheduled percentage of completion .98% Actual percentage this date 93% The primary accomplishment in this Task?during the month of May was the installation of the under floor cabling to the various electronic cabinets and the interconnection of the control console with the logic in cabinet #1. The cabling to the Optical Bridge termination panels was also completed during this period. Fifty per cent of the installed cable has been checked out and the circuitry verified in subsystems test (see task 4128). ? -26- 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 1 Task 30 Control Console and Chair Scheduled percentage of completion 86% Actual percentage of completion 80% Check out of the pushbutton controls and console/cabinet interface continued as planned during this report period. Installation of cabling from the central console to the distribution panel in the utilities frame behind the Stereocomparator was also started during this month. The chair tracks were installed in the simulated computer floor and the chair placed in position. -26- T Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 32 Computer Scheduled percentage of completion 98% Actual percentage this date 95% The high-speed punch and readout interface has been installed and the computer/punch/teletype are now on line as a system. '71 fl fl Fir Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 33 Electronic Racks ,and Control Cabinets Scheduled percentage of completion 95% Percentage completed this date 90% has completed installation of all electronic racks in the Clean Room and all chassis have been mounted in racks 4t1 and #3. Installation of chassis and internal cabling of rack #2 will be completed in June. -28- S TAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 r- Task 34 Utilities, Vacuum and Air Systems Scheduled percentage of completion Actual percentage this date 72% 60% The purchase of the new valves, tubing and connections which are required because of changes in the film cooling system has been completed and installation of these items in the utilities cabinet is progressing. It is anticipated that the utilities hook-up will be completed during the next report period. - [1 Declassified Declassified in Part -Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 t=s 1=1 Task 35 Vibration Absorption and Leveling Scheduled percentage of completion ? 90% Actual percentage this date 85% No further work is scheduled for this Task until the Optical Bridge is received from At this time, full STAT tests of response time and stage deflection will be conducted. This delay is necessitated by the requirement for full loading of the stages during these tests. -30- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 36 Overall Assembly Scheduled percentage of completion Actual percentage this date 50% 27% As the program progresses, this Task incompasses a greater bulk of the total accomplishments for a given report period. During the month of May has: STAT 1. Installed all granite components on their respective stages. 2. Assembled and installed air bearings. 3. Assembled and installed stage drives. 4. Installed film drives and platen. 5. Installed platen illumination. 6. Completed the utilities installation behind the Stereocomparator. 7. Provided 75% of all cabling hookup. 8. Mounted lasers. 9. Installed the control console. ? The peripheral equipment required for assembly is being manufactured as needed. -31- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 37 Radio Frequency Noise Suppression month of May. Scheduled percentage of completion Actual percentage this date No work was scheduled on this Task for the -32- !1.71 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 t=i t=s t=i? Task 38 Environmental Control Scheduled percentage of completion 78% Actual percentage this date 85% During this report period the sponsor' s site preparation consultant met with representatives of to discuss general installation plans and procedures. A complete review of site preparation was conducted during this meeting to ascertain whether all facilities required for operation of the Stereocomparator were provided. -33-- S TAT fl Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 39 Reliability Analysis month of May. Scheduled percentage of completion Actual percentage this date No work was scheduled on this Task for the -34- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 r- Task 40 Installation Scheduled percentage of completion 0% Actual percentage this date 150/0 During the month of May, a meeting was held at facilities with the customer' s site preparation consultant and the customer to discuss installation requirements at the site for the Stereocomparator. See Task 38 for additional information. -35- S TAT n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 1=11 c=1 Task 42 Breadboards and Test Devices Scheduled percentage of completion 45% Actual percentage this date 45% The electromechanical breadboard models of the computer-controlled optics servos have been completed and connected to the electronics assemblies which drive and control these servos. Preliminary phasing of motors, tachometers, and feedback poten- tiometers has been accomplished. Measurements were taken to determine the required rate (velocity) tachometer feedback gain required, and compensation networks are being designed. During the month of June the complete servo compensation and performance testing will be performed. Also, during this period, tests will be made of these servos with the computer tracking program in order to assure compatibility between the hardware and software portions of the machine. At the present time, it appears that all per- formance characteristics (such as accuracy of positioning, dynamic response characteristics, bandwidth, and stability) will be met. -36- [1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010 008-0 ^ 1 Task 43 Computer Programming and Services Scheduled percentage of completion 80% Actual percentage this date 75% During this report period, has been STAT proving various portions of the computer program in preparation for the Optics simulation effort which is scheduled for June. progress report for the period April 1 to April 30 is included as Appendix II in this report. -37- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 44 Preacceptance Test in Fabrication Plant month of May. Scheduled percentage of completion Actual percentage this date 0% No work was scheduled for this task for the -38- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 : :: Task 45 Acceptance Test in Fabrication Plant month of May: Scheduled percentage of corhpletion Actual percentage this date 0% No work was scheduled for this task for the -39- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Task 46 Acceptance Test after Installation month of May. Scheduled percentage of completion Actual percentage this date 0% OTC No work was scheduled on this task for the -40- in Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 17 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 k=i tzi Task 47 Instruction Manual and Drawing Submittal Scheduled percentage of completion Actual percentage this date 28% ? 20% The revision of the design drawings to cover the "as built" status of the various subassemblies of the Stereocomparator is proceeding according to schedule. -41- n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 ? 1=1 Task 48 Spare Parts List Scheduled percentage of completion 20% Actual. percentage this date Work,is continuing on the compilation of the recommended spares for the Stereocomparator, both medhanical and electronic compOnents -42- In Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 1=1 1=1 E -E ???? I 7 1=1 tri Task 49 Operator Training Scheduled percentage of completion 20% Actual percentage this date 68% Work is continuing on the Operator Training Manual which will be used in training personnel to operate the Stereocomparator. -43- 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 " Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Li PROGRESS REPORT FOR PERIOD ENDING 30 APRIL 1969 Li 17 1.0 Progress during Reporting list was prepared STAT STAT Period spare parts A rough draft on and forwarded to the recommended Li Responding to a request by to furnish the High Voltage Connectors STAT to implement connections through an interveing bulkhead, and STAT installation information, purchased two of the bulkhead-mounted STAT Li connectors. A copy of Industry Drawing 167-4191 was STAT forwarded to for installation information. Two "Danger-High STAT. Li Voltage" stickers were also forwarded for use. STAT Li The remaining outside vendor layouts of the video correlators, parallax analyzer, and channel selection logic boards were received checked and considered satisfactory. Procurement delays on the subassembly boards and other miscellaneous system items delayed the completion of the top assemblies. Assembly of the chassis and both image dissector assemblies was started and near completion at the end of April. Assembly of the distortion analyzer board was completed. A temporary meter panel, required for atceptance testing, was designed, the materials purchased and its construction started. During acceptance testing the P1 connector of cable W3 (126912) plugs into a compatible connector on this panel. A short cable was also made to connect this panel witp the Image Analysis system through test connector J23 on the chassis assembly. This will permit the monitoring of error voltages, when the system interface cable, W3, is tied into the system. The load simulating resistors and capacitors inside the meter panel should be disconnected when the panel is used in thelast mentioned manner. STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 P DeClassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 fl Subassembly tests were completed on the Time Base Generator, Deflection Amplifiers, Video Amplifiers, Dynode Regulator, Integrators, Sum and Difference, and Raster Delay circuitry. Operation was generally satisfactory and only minor component changes were required in a few instances to get the desired performance. The drafting effort was reduced to adjusting outside vendor layouts to format and to servicing change notices to update drawings with follow-up information from assembly and/or testing. Overall progress to the end of this reporting period is approx- imately 80%. 2.0 Plans for Next Period The remaining boards should be received and assembly of all items completed. Drawing revisions and adjustments related to assembly should be concluded. Subassembly testing should be completed and preacceptance tests Started. Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 0 0 De Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 F\ Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP791300873A001500010008-0 7 MONTHLY PROGRESS REPORT May, 1969 This technical report is for the reporting period from April 1 to April 30, 1969. The report is prepared according to STAT Specification number DB1001 (as modified). STAT 1. At the end of the month, subroutines a. TTIC b. STAGIN c. FID2 ?d. PRESET e. RECR f. RDCRX were coded. With the completion of these, coding for the entire Stereoscan program was complete. At the turn of the month, was documenting while waiting for the computer to become available once again with high speed peripherals. All subroutines for the real time foreground (EXEC1 and its subordinates) were documented at month's end, with the exception of the input/output routines RDOP, RDST, and RDCR/X. Previously, all routines for the real time background were documented. The background is that portion of the program under control of TMAT. STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 ni Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 r- -1 t"- L. ^ ?-???? During April, a new subroutine was created, called FID3. a This routine computes the initial lens coordinates X10 and X20 from fiducial data prepared by FID1 and FID2. FID3 actually does the computations that FID2 would otherwise have done concerning these computations; it is written in FORTRAN (hence the status as a separate subroutine). Approximately 65% of the total work has been completed as of this reporting period. 2. Next month, the documentation effort will be continued until the computer is available. At that time, checkout will be undertaken for the non-real time portion of the program (under the control of EXEC1). Subroutines subject to checkout at that time will be: Required Checkout Time a. CONVR T 5 days b. DA TAIN 4 c. FID1 1 d. ?FID2 2 e. NOCAM 2 f. PARMOD 2 g. RECIN 2 h. SCANER 1 STAGIN 3 j. TBSRCH 1 k. TTIC 1 1. TTIN 2 Total required 26 days -2- 17 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Li 7 Li r- iLJ Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 Also at the same time, work on the above may be interrupted at request to create a real time foreground program for STAT actual servo checkout. The required time for this is one week. 3. At the end of April, the problem of how to filter the crosstalk out of the correlator had not yet been resolved. This has a low priority because it is not really clear that crosstalk will even be a problem. 4. Work on the earth-curvature addition to TMAT, the logic to avoid partial derivative blowups, and the "no camera data" alternatives are being deferred in lieu of a possible contract renegotiation. has written a proposal, which should STAT be transmitted to before the end of May. STAT 5. It has been orally agreed that when the computer is again available, will begin working second shift hours, and that will STATT schedule one of its personnel to work the same. 6. No changes or agreements have been made requiring the contracting officer's approval. 7. No other unresolved matters are known to exist. -3- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0 ? 7 ri c v Name CAMATS CONVU(X) CVB CVF DATAIN / V EXEC I V EXEC 2 ALPHABETICAL SUBPROGRAM INDEX General Subprogram Flow Diagram ,Page 8 Page No. 118-123 44 130,131 132,133 27-31 17-19 20-25 Li r-- L. L_J fl GTP LS TC /PSET MATMAK trIvISGIN V1MSGOUT MTS NOCAM PARMOD PRET S IMSG-tPUT 56-58 - 59-62 157,158 80-82 145,146 127-129 147,148 149-151 100-104 41-43 3235 Name Page No. PTOP 105-111 FtDOP 140-142 RDST 143,144 RECALL 66-68 RECIN 45,46 REORT 83-88 SCANER 39,40 STAGIN 49-55 TBSRCH 36-38 TIC T 134-136 TICX 137-139 TMAT 89-99 TRK 69-79 TTIC ,63-65 TTIN 47,48 T2 Rkl\T 112-115 VI XMX I 124-126 XAI YMR 116,117 tf. cix c /:fl D Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010008-0