STATUS REPORT FOR PERIOD 1 MARCH THROUGH 31 MARCH 1969 SUBMITTED UNDER CONTRACT TO U.S. GOVERNMENT CONTRACT NO. (SANITIZED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP79B00873A001500010006-2
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
69
Document Creation Date:
December 28, 2016
Document Release Date:
August 17, 2012
Sequence Number:
6
Case Number:
Publication Date:
April 4, 1969
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP79B00873A001500010006-2.pdf | 1.59 MB |
Body:
91?=1
r-
90????
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
-
z).
B
c Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
7
STATUS REPORT
for Period
1 March through 31 March 1969
Submitted under Contract to
U. S. Government
File No. 11038
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
This document is presented as the Monthly
Status Report under Contract to the U. S.
Government,
The report period represented herein covers
the period 1 March through 31 March 1969.
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
t-=.1
Program Status
INDEX
Page
Summary
1
Task 1
-
Statements of Work, Specifications, Report
2
Preparation
Task 2
-
Scheduling and Planning
3
Task 3
-
Test and Inspection Procedures
Task 4
-
Management, Administration and Supervision
5
Task 5
-
Meetings
6
Task 6
-
Facilities Requirements
7
Task 7
I.
Main Frame
8
Task 8
-
Skin
9
Task 9
-
Granite and Ways Assembly for Stages
10
Task 10
-
Air Bearings
11
Task 11
-
Stage Drives
12
Ta sk 12
-
Film Drives
13
Task 13
-
Film Platen
14
Task 14
-
Film Cooling
15
Tasks 16,
17, 18
-
Optics
16
Task 20
-
General Platen Illumination
17
Task 21
-
Optical Bridge
18
Task 22
-
Interferometer Assembly
19
Task 23
-
Optics Drives
20
Task 24
-
Image Analysis System
21
Task 26
-
Digitizing Logic
22
Task 27
-
Metric Readout
23
Task 28
-
Output Logic and Interface
24
Task 29
Cabling
25
Task 30
-
Control Console
26
Task 32
-
Computer
-27
Task 33
-
Electronic Racks & Control Cabinets
28
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 34
- Utilities, Vacuum and Air Systems
29
Task 35
- Vibration Absorption and Leveling
30
Task 36
- Overall Assembly
31
Task 37
- R.F.I. Suppression
32
Task 38
- Environmental Control
33
Task 39
- Reliability Analysis
34
r-,
Task 40
- Installation
35
1=i
Task 42
Breadboards and Test Services
36
Task 43
- Computer Programming and Services
37
Task 44
Preacceptance Test in Fabrication Plant
38
Task 45
- Acceptance. Test in Fabrication Plant
39
Task 46 -
- Acceptance Test after Installation
40
Task 47
- Instruction Manuals
41
Task 48
- Spare Parts Lists
42
Task 49
- Operator Training
43
t=i
-71
H
,E
'E Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
APPENDICES
Letter dated 7 March 1969
Trip Report to
Progress Report for February 1969
Trip Report tc
1
Progress Report for February
in
App,, I.
App. II.
App. III.
App. IV.
1969 App. V.
STAT
STAT
STAT
STAT
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
I
? "
IL;
t=t
PROGRESS SUMMARY .
Scheduled percentage of completion - 53.9%
Actual percentage this date - 51.5%
? This month's report marks the achievement of attaining
over 50% of the predicted program effort.
Activity has been high during this report period in the areas
of subassembly, subassembly test, and completion of delivery of many
electronic chassis and components.
We are currently preparing for shipment of the electronic
cables and components which are required for installation of the optical
system in the optical bridge, and the assembly of the stages and other
components at
is proceeding as required. STAT
These items are covered in more detail under individual
task headings.
-1-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
fl Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
r-
r9
Task 01 Statements of Work, Specifications, Report
Preparation
Scheduled percentage of completion 55%
Percent completed this date 55%
No new work statements or specifications have
been prepared or issued during this report period.
-2-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
^
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 02 Scheduling and Planning
Scheduled percentage of completion
Actual percentage this date
55%
55%
A new schedule for preparation and submittal
of documentation has been prepared and incorporated into
Program Plan.
A formal request for changes to the contract to
reflect the new schedule was submitted on 7 March 1969.
A copy of this request is included as Appendix I.
-
STAT
Lj Declassified in Part - Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010006-2
n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 03 Test and Inspection Procedures
Scheduled percentage of completion 33%
Actual percentage this date
35%
Test procedures are currently being prepared for
the servo simulation program which will provide information on
electrical and mechanical characteristics of the optical drive chain
and attendant systems.
year.
E
ir ?
These tests are scheduled for April and May of this
-4-
.4 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Li
fl
Task 04 Managemerit, Administration and Supervision
Scheduled percentage of completion 55%
Actual percentage this date 55%
During the current month the various elements of
the program maintained their scheduled status.
Film cooling and clamping details are being worked
out at this time, and are covered in more detail under the individual
task headings.
-5-
Fr: I
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
i17 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
t=i
:=J
Li
Task 05 Meetings
Scheduled percentage of completion
Actual percentage of completion
55%
55%
During the month of March, a meeting was held with
the customer at the
discussed:
facilities. Following is a list of the items STAT
1. Review of job schedule.
2. Review of deliverable items schedule.
3. Stereocomparator air bearings and stages, includ-
ing demonstration.
4. Clean room facility and demonstration.
5. Operator Training Manual.
6. Spare Parts List and Mainte.nance Program.
7. Review of servo simulation program.
8. System acceptance tests.
9. Film cooling and film clamping mechanism and
demonstration.
Additionally, a meeting was held with the customer's
site preparation consultant. This meeting is discussed in detail under
Tasks 38 and 40.
rl
LJ Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
E. Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 06 Facilities Requirements
7 Scheduled percentage of completion 95%
1=2
Actual percentage of completion 75%
1
fl The air conditioning equipment installation has
L=
been completed into the Clean Room. All filters have been installed
and both units have been run under "no load" conditions to determine
the location of any leaks or unequal pressures within the ducts.
The initial tests were satisfactory,
1
Li
Installation of inside ductwork and "start up" is
expected by April 15, with another week required in which to balance
the air flow through the system.
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 07 Main Frame and Structural Elements
Scheduled percentage of completion 98%
Actual percentage of completion 93%
No additional work was scheduled for this task
for the month of February.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 08 Skin
Scheduled percentage of completion
? 35%,
Actual percentage this date 30%
As reported last month, the fabrication of the skin
coverings for both the right and left stages will be scheduled to
coincide with the overall assembly of the Stereocomparator.
No additional work was scheduled for this task
during the month of March.
-9-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
'71
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
t=1
7-11
Task 09 Granite and Ways Assembly for Stages
Scheduled percentage of completion 98%
Actual percentage this date 95%
The two granite laser supports were received from
the vendor during the month of March.
Delivery of the granite sections is now complete.
The drilling and tapping of the granite laser supports
will be scheduled upon completion of the Clean Room facilities.
-10-
b Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
fl Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Q7J
Task 10 Air Bearings
Scheduled percentage of completion 62%
Actual perceqtage this date 75%
As reported previously, the air bearings required
to guide and support the stages have been installed.
No work was scheduled on this task for the month
of March.
Z.=
-11-
r-
,
Declassified in Part- Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 11 Stage Drives
Scheduled percentage of completion 60%
Actual percentage this date 55%
Because of the necessity to complete the Clean
Room facilities before the Stereocomparator eg.uipment.assembly
can be continued, it has been necessary to re-schedule the
installation of the stage drives.
This is because the confusion of the Clean Room
constkuction prevents making delicate assemblies such as.the stage
drives.
March.
No work Was scheduled on this task for the month of
- 12 -
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
I 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
^
LI
^
^
1=1
Task 12 Film Drive and Transport System
Scheduled percentage of completion 50%
Actual completion this date 65%
Minor modifications are being made to the film
drive and transport system to insure a closer compatibility
with the film platen and film clamping system.
-13-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 13 Film Platen and Film Clamping
Scheduled percentage of completion 55%
Actual percentage this date 49%
A prototype of a film holddown device to assist
the vacuum clamping system was built by the
shop and STAT
demonstrated to the customer during their last visit.
While the device performed its function, it was
?Ker........eaa.bewattcnb..at.cwmea.a.szvzinimkax-a...t..eoote,a..t4r.E,PV..kturuao.az.Aak.xr.ewhaoaneuatgafiaimr.ahe..,Sa.eaer.,..
considered too large and was generally unsuitable.
An air jet method for performing this operation is
being explored before a definite decision will be made with regard
to the system to be used on the Stereocomparator.
-14-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
?
r--
Task 14 Film Cooling
Scheduled percentage of completion 40%
Actual percentage this date 40%
A determination of the volume and temperature of
the air required for the film cooling assembly was made, using
the prototype device fabricated by the. shop.
The new valving required to give optimum film
cooling is presently being installed in the film cooling system.
In addition, Polaroid photographs of the objective
lens mounts and the film cooling arrangement were sent to
for their use in providing for the air flow surrounding the objective
lenses.
-15-
S TAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
STAT
(-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
fl Tasks 16, 17
? and 18 Viewing Optics, Viewing Illumination, Reticle
Projector and Illumination
t=i
Scheduled percentage of completion 64%
Actual percentage this date 65%
During the month of March,
to the optical vendor
drawings were sent STAT
detailing the wiring installations to
be made by them to interface the optical subassemblies in the
optical bridge.
Interfacing connectors required between the optical
bridge and the power supply for the optics were also sent for
installation in the designated placed on the o6tical bridge.
A monitoring trip is planned for the third week of
April 1959.
-16-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
STAT
7
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
fl
t=.
n
Task 20 General Platen Illumination
Scheduled percentage of completion
61%
Actual percentage this date 41%
As reported previously, the general platen illumina-
tion assembly is ready for installation on to the Stereocomparator.
No additional work was scheduled for the month of
March on this task.
4
?
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 21 Optical Bridge and Supports
Scheduled percentage of completion
Actual percentage this date
90%
90%
As mentioned under Tasks 16, 17 and 18, drawings
detailing the wiring installations and wiring connectors were sent
to
for their use in interfacing the optical bridge with the
optics system.
-18-
S TAT
I[r-
ILD Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
:I Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
1=0
1,0
Task 22 Interferometer Assembly
Scheduled percentage of completion 61%
Actual percentage this date 57%
The interferometer assembly is ready for
installation on to the Stereocomparator.
Installation will be scheduled upon completion
of the Clean Room.
-19--
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
t=
L,
H.
1-i 1
c=1
F)
I
I-1 1
I 0
Task 23 Optic's Drive Assembly
Scheduled percentage of completion
57%
Actual percentage this date 45%
The chassis interfacing the optics drive assembly
with the optics have been received and were unit tested in the
shop. It was determined that minor modifications will be
necessary to interface with the optics assembly.
We anticipate that these changes will be implemented
and the chassis ready for breadboard testing by the end of April?
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010006-2
771
fl
EZ=
Task 24 Image Analysis System
March to
System.
Scheduled percentage of completion
Actual percentage this date
43%
55%
A monitoring visit was made during the month of
the subcontractor supplying the Image Analysis
The trip report covering this visit is included
as Appendix II.
A copy of progress report for the month of
February 1969 is included as Appendix III.
-21-
S TAT
flDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
STAT
?
7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
7
L,J
fl
Task 26 Digitizing Logic Subassembly
Scheduled percentage of completion 90%
Actual percentage this date 86%
The digitizing logic subassembly is ready for
installation.
After installation of the interferometers on to
the stages, the digitizing logic chassis will be installed, and
the final system check out will begin.
22 -
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
r-
I E
Task 27 Metric Readout
Scheduled percentage of completion
94%
Actual percentage this date 92%
Additional testing of the metric readout with the
control console display panel was done during the month of
March. The results of these tests were satisfactory.
There will be some additional testing of the
metric readout to determine that the program counting sequence
which converts one quarter wave lengths to metric units is within
the required accuracy tolerance.
This testing is scheduled for the month of April.
-23-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
7 Declassified in Pirt'r Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010006-2
Task 28 Output Logic and Interfaces
Scheduled percentage of completion 98%
Actual percentage this date 72%
The revisions necessary to insure compatibility
between the computer programming and the output logic circuitry
are now substantially complete. Most of the circuitry has been
checked out and debugged.
The checkout of the logic drawers in combination
with the control console, computer and servo drives is scheduled
for the months of April and May.
-24-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
n-
1I
In
r=i
I n
I
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 29 Cabling
Scheduled percentage of completion 98%
Actual percentage this date 91%
In order to route the cables around the optical
components in the optical bridge, it was necessary to modify some
of the cable assemblies used in the optical bridge. These modifi-
cations are now in process, and the cables are being made ready to
ship to the optics subcontractractor.
The percent progress of the cabling required to inter-
connect the various electrical and electronic elements being assembled
in the shop is as follows: STAT
Cabinet (Stage drives, film drive and
transport system) 100%
Cabinet #2 (Optics drive, interface with
Image Analysis System) 100%
E Cabinet #3 (Metric readout, output logic
and interfaces) 89%
;73
Electrical arrangement (floor interconnection
of all cables)
Control Console
Display Panel
Optical Bridge
Stage Assembly
89%
97%
95%
50%
73%
2 5
1 7
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 30 Control Console and Chair
n
Scheduled percentage of completion 79%
Actual percentage of completion 62%
The wiring of the control console has been
I
completed, and the console is now being tested in conjunction
? with the logic drawers with which it interfaces.
I-J
The checkout of the analog controls for the optic,
servos in the console is expected to be finished by the end of
April.
n
j Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 32 ? Computer
Scheduled percentage of completion 95%
Actual percentage this date 95%
The cleaning and disassembly of the computer has
been deferred until April in order to accommodate the program
efforts of
program.
schedule.
7
the subcontractor supplying the computer
This deferment will not interfere with the overall
-27-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
? Task 33 Electronic Racks and Control Cabinets
fl
K=1 Scheduled percentage of completion 88%
Percentage completed this date 88%
The installation of the electronic chassis into
the racks and control cabinets has been rescheduled to coincide
with the completion of the Clean Room.
-28-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
E.
i=i
? Task 34 Utilities
Scheduled percentage of completion 56%
Actual percentage this date 55%
The
shop is in the process of installing the
mechanical components comprising the utilities assembly.
The electronics required to operate the utilities
are virtually complete and are scheduled to be installed in the
cabinet during the month of April.
-29-
S TAT
in Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
1E
Task 35 Vibration Absorption and Leveling
Scheduled percentage of completion
90%
Actual percentage this date 85%
No additional work was scheduled for this
task during the month of March.
-30-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
7.
Task 36 Overall Assembly
Scheduled percentage of completion 31%
Actual percentage this date 18%
No additional work was scheduled for this
task during the month of March.
Installation of the completed subassemblies
is scheduled for the month of April.
-31-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
wm
[11
1
!
?F-? Task 37 Radio Frequency Noise Suppression
?
(
?
:1
Scheduled percentage of completion
Actual percentage this date
?
0 ok
No work was scheduled on this task for the
month of March.
-32-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 ,
7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
C.D
fl
?
fl
Ii
t=i
Task 38 Environmental Control
Scheduled percentage of completion 75%
Actual percentage this date 58%
During the month of March, a meeting was held
with the customer's site preparation consultant to discuss the
final drawings detailing the environmental control requirements.
A copy of the trip report covering the discussions
held is included as Appendix IV.
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 39 Reliability Analysis
Scheduled percentage of completion
Actual percentage this date
ID%
No work was scheduled on this task for the
month of February.
-34-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
'fl
Task 40 Installation
Scheduled percentage of completion
Actual percentage this date 10%
A meeting was held in March between the customer
representatives, including the air conditioning and site preparation
consultant, and
representatives STAT
A copy of the trip report covering the discussions
held is included as Appendix IV.
-35-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
1=3
Task 42 Breadboards and Test Devices
Scheduled percentage of completion 45%
Actual percentage this date 25%
Breadboarding and prototype testing of the various
subassemblies is continuing in the
27 and 30.
-36-
shop. See Tasks 138 14, STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
?
Task 43 Computer Programming and Services
Scheduled percentage of completion 75%
Actual percentage this date 60%
Personnel from
the subcontractor STAT
supplying the computer program for the Stereocomparator; are
continuing with the development of the program, using the
computer installed at the
facilities.
A copy of their Progress Report for the month of
February is included as Appendix X of this report.
?
, Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 44 Preacceptance Test in Fabrication Plant
Scheduled percentage of completion
Actual percentage this date
Aol
No work was scheduled for this task during the
month of March.
-38--
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
IDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 45 Acceptance Test in Fabrication Plant
Scheduled percentage of completion
Actual percentage this date 0%
No work was scheduled for this task during
the month of March.
-39--
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
I
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 46 Acceptance Test after Installation
Scheduled percentage of completion 0%
Actual percentage this date 0%
No work was scheduled for this task during
the month of March.
-40--
I Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
1=1
1=i
t=i
Li
:=11
It=i
Task 47 Instruction Manual and Drawing Submittal
Scheduled percentage of completion 21%
Actual percentage this date 12%
is continuing to revise the design drawings
to cover the "as built" status of the various subassemblies.
Work is also continuing on the preparation of
the Operators Manual.
-4 1-
S TAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 48 Spare Parts List
Scheduled percentage of completion
6%
Actual percentage this date 20%
A preliminary spare parts list, covering both the
recommended mechanical and electronic spares, has been
completed. However, as the program progresses, we anticipate
there will be additions and deletions to the present list.
-42-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
1.7]
h
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Task 49 Operator Training
Scheduled percentage of completion
Actual percentage this date 48%
During the month of March, work continued on
the manual which will be used in training the operators to use
the Stereocomparator.
-43-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010006-2
fl Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
fl
LI
r-
Li
U. S. Government
Subject:
Gentlemen:
7 March 1969
STAT
As stated in the recently monthly technical Status Reports, certain items of
the Deliverable Items will be delayed. hereby STAT
requests amendment to the above referenced contract to reflect the following
delivery schedule:
1. Operating High Precision Stereocomparator.
2. Final Acceptance/Test Plan in a format approved
by the Contracting Officer's Technical Represen-
tative.
14 June 1970
No change
3. One (1) set of Operating Instruction Manuals in
a format approved by the Technical Representa- 24 Nov. 1969
tive of the Contracting Officer. (Draft)
4. One (1) set of Programming Instruction Manuals
in a format approved by the Contracting Officer's 6 Apr. 1970
Technical Representative. (Draft)
5. One (1) set of Maintenance Instruction Manuals
in a format approved by the Technical Representa- 24 Nov. 1969
tive of the Contracting Officer. (Draft)
6. One (1) recommended Spare Parts List to include
manufacturer's expected lifetime per part, and
In a format approved by the Technical Representa- 24 Nov. 1969
tive of the Contracting Officer. (Draft)
7. One (1) Master Set of Contractor's shop draw-
ings, drawn to an as built" status, for the High
Precision Stereocomparator, which shall be in
accordance with industry standards for said
drawings. 31 July 1970
7
1, Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
?1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
U.S. Government Page 2.
7 March 1969
8. One (1) Blue-line copy of Contractor's shop 31 July 1970
drawings as set forth in Item No. 7 above.
9. Monthly Financial/Technical Progress Report, No change
generally in the format required by Specification
DB-1001, revised, attached hereto, which is
incorporated herein by reference and made a part
hereof.
10. Any and/or all informal technical reports, drawings,
ray traces, optical designs, and other technical
data acquired by the Contractor either directly or
by reason of any subcontract or consulting agreement
entered into in performance of work hereunder.
11. Any and/or all Alignment Targets, Resolution
Targets and Target Film generated by either the
Contractor or his subcontractor for use in testing
the High Precision Stereocomparator Optics.
12. Any and/or all components, modules, or systems
either fabricated, furnished, or purchased as part
of the performance of work hereunder.
31 July 1970
31 July 1970
31 July 1970
No other changes to the contract are anticipated at this time.
If we can furnish any additional information, please do n9t hesitate to
contact the undersigned.
BCJ:jm
Very truly yours,
Administration Manager
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
U
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
00
00
n
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
t=1
7
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Company Contacted:
Contacted by:
Persons Contacted:
Date Contacted:
Subject:
TRIP REPORT
March 19, 1969
Job 4342 - Tasks 24-25
showed the package of drawings that they were sending to
together with their monthly report for February which shows that they
have completed 55% of their program.
STAT
STAT
They expect to have their manuals in first draft from by the end of
March 1969. Their present schedule also calls for completion of
acceptance testing by June 30, 1969. They indicated that their overall
schedule was quite tight, and no one should be surprised if some additional
1=1
1=1
slippages occur. At this point in the program,
is not on the
STAT
critical path, and no schedule problem is anticipated.
1=1
D
Two months ago
presented various aerial photographs from which
selected three for the acceptance testing of the image analyzer. These
three photographs were then printed b
and
STAT
in the form of enlargements, STAT
selected three areas on the prints for
use in the fabricationSTATT
1= Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
k=i
Trip Report
STAT
2 .
of the test imagery. These three photographs represented three
fundamentally different types of photography: one a mosiac of houses
and streets in a fairly regular pattern; another was a mountainous terrain,
with various topographical features including roads and buildings; the
third was a wooded area with rather weak features.
was directed to make up these three photographs in the form of STAT
positive transparencies with various degrees of magnification and
anamorphic distortion. Some of this work has been completed by STAT
and two of the photographic series were acceptable.
The third series differed in density with each magnificafion change, ie.,
as the magnification became greater, the density of the film became less.
This was not considered an acceptable condition, since it would mean
comparing photographs considerably different in density.
was requested to make this particular series of photographs over STAT
again, using a technique which would result in equal density for all
of the photographs.
In reviewing the
connecting the
work, it was noted that the high voltage cable
image dissector tube to the
STAT
chassis was equippedSTAT
with two female plugs which would have to be mated for installation.
Since two female plugs could not be connected together,
was advised STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
n
I
?
1
I .7
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Trip Report
that this was an unsatisfactory condition.
was the responsibility of
3STAT
stated that installation STAT
recommended that
S TAT
buy an
adaptor or cut off the plugs on the cable and replace them with whatever
configuration was necessary for
A controversy developed at this point which was not settled during the
visit,
took the position that this matter was firmly within the
requirements of the contract and was one of the deliverable items of
the contract, and as such, it was necessary for
in such a way that it could be used.
Even though
STAT
STAT
to build the cable STAT
took a very strong negative position in this matter,
it is hard to believe that this can result in a real problem because of
the ridiculousness of the situation.
The next visit with
of May.
STAT
is tentatively scheduled during the first half STAT
LJ Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
jDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
tz
o
E 0
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
-7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Uj
fl
tzJ
HO
.
fl
Ii,
1
PROGRESS REPORT FOR PERIOD ENDING 28 FEBRUARY 1969
1.0 Progress during Reporting Period
Checkprints received on layouts performed by outside vendors were
determined to be satisfactory. Subsequent schematic modifications were
made on the distortion analyzer, parallax analyzer, video correlators,
and channel selection logic circuitry. The layout work of these assemblies
was purchased. Source control drawings were corrected on all assemblies
in which outside layouts were performed.
Drawings were released on image dissector assembly, correlator chassis
assembly and cable drawings. Purchase orders were placed on these items.
Sub assembly construction began 'during this period. The extender board
and the sum and difference boards were completed. Work also progressed
on the time base generator, modulator, dynode regulator, and video
amplifier boards.
Schedule delays have resulted from various sources. Delays in sign
offs have resulted from customer requests related to chassis assembly,
cables and image dissector holder.
The was closed on six days because of weather
conditions and the intervening holiday. Vendors have also indicated
longer delivery times on the remaining board layouts.
Overall progress to the end of this reporting period is approximately 55%.
STAT
STAT
2.0 Plans for Next Period
Layouts on the proprietary modules, test fixture and image dissector holder
are expected to be completed and procurement of these items started
during March.
7 ?
li Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
L.1
fl
L.3
fl
7
!
LJ ?
r-
It will be necessary to check the layout drawings from outside vendors
and to make final adjustments to the formats to agree with previous
drawings. Drafts of the test procedures, operating manual, and
spare parts list will be generated for approval.
Sub assembly construction and testing are expected to continue through
May.
Acceptance test at
week of June.
is tentatively expected to occur during the last SI-AT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
LIDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
e
oo
Jie
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
TRIP REPORT
Company Contacted:
STAT
Contacted by:
fl
Persons Contacted:
and Customer Representative
STAT
Date Contacted:
March 20, 1969
Subject: Job #342 - Task #40
This visit was for the purpose of reviewing the site preparation mechanical,
environmental, and electrical drawings.
Specification No 13, covering the air conditioning requirements for
the Stereocomparator installation had been issued some time ago. This:
specification made reference to, but did not include, the conditioned air
requirements for film handling and optical bridge cooling. Revision #1 to
the specification has just been completed, bringing up to date the film
cooling requirements based on experiments performed at
and including
the information on optical bridge cooling. This revision was given to
STAT
STAT
STAT
The film cooling and film handling air conditioner was specified to have a
capacity of 50 cfm at .35 psig and the equipment procurement will proceed
on that basis.
In general, the specifications prepared by
appear to be
fully compatible with the nstallation. Suggestions were made by
for minor changes and improvements with reference to:
STAT
STATT
ElDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
-
-1
Trip Report
a) handling the heavy components of the Stereocomparator
during installation, i.e., the services of a rigging contractor
will be retained to shore up a floor over the "pit" to move the
Stereocomparator heavy parts into position. This is in lieu of
the installation of an expensive overhead travelling crane.
b) in connection with the distribution of air required for the
equipment containing paper punching components.
c) for the location of the temperature sensing elements immediately
ahead of the Stereocomparator in the air stream.
It was noted that in connection with b) and c) above, detailed engineering
and possibly experimental work may have to be performed before some of
the situations can be resolved.
is planning to perform some experiments in the immediate future with
respect to the location of temperature sensing elements for ti-e
2 STAT
STAT
lean STAT
Room air conditioning-control. The results of this work will be turned over
to
as soon as the information is available. STAT
The supply and return duct system related to the air cooling requirements
for the optical bridge, the illumination systems and the control console
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
L.7
In.
'
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
?-????
Trip Report
were discussed in detail. A marked drawing was delivered to
showing the air distribution outlets with respect to the optical bridge.
There is a serious space problem for the duct work. To help alleviate this
problem, it was agreed that four to six approximately 3" conduits would
be laid through the Stereocomparator's foundations so that various service
and utility supplies may be furnished to the various portions of the Stereo-
comparator without interference with the air conditioning duct work.
It would seem that an appropriate site preparation schedule can be achieved
by
which will not conflict with the installation requirements of
the Stereocomparator.
3.STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
STAT
IDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
ID
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
MONTHLY PROGRESS REPORT
February, 1969
This technical report is for the reporting period from February 1
to February 28, 1969. The report is prepared according to
Specification number DB1001 (as modified).
1. During the month, the entire background program has been
coded, and each subroutine has been individually tested. A
special code-checking driver has been created for each routine
which tests all the permutations and limiting values of the sub-
routine's inputs. The checked-out routines are:
a. TMAT (without earth curvature)
b. MTS
c. XAI
d. T2PAN
e. T2STRP
f. XMX1
g. MATMAK
h. CAMATS
i. YMR
First draft documentation has been prepared for all the above
routines.
-1-
L Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
I
i
'
Subroutine PTOP, also part of the background system, has
been flowcharted and coded. It is presently in the debugging
stage.
Subroutine REORT has checked-out extensively. This work,
as well as the above, has been done on the CDC 6600 computer
in Palo Alto. Using this computer greatly facilitates debug-
ging, primarily because of the peripheral speeds.
In the non-real time portion of the program, subroutines
a. PARMOD
b. NOCAM and
c. TBSRCH
have been flowcharted and coded. Since these and most of
the other non-real time routines are in machine language,
they must be code-checked using the DDP-516 itself.
Subroutines
a. DA TAIN
b. SCANNER and
c. CONVRT,
which were flowcharted last month, have been coded this month.
-2-
17 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
TI
Lii
The foreground routines
a. EXECZ and
b. TRK
have been integrated and a PAL-AP system tape created so
that anyone may run them. Input is via the teletype, using
an octal corrector subroutine; output is via teletype, using
standard FORTRAN I/O routines. For this first "calibration
system," the routines
a. CVB
b. CVF
c. REORT
?d. TMAT
e. RDCR
f. RDCRX
g. RDOP
h. RDST
i. GTP
j. RECALL
k. FIXR and
I. LSTC
are all dummies which merely report via teletype each time
they are called.
-3-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
, Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
Approximately 55% of the total work has been completed as
of this reporting period.
2. Next month, the non-real time routines
f
a. TTIN
b. RECIN
c. FID1
d. FID2
e. STAGIN
f. TTIC
and
will be flowcharted, coded, and check-out will begin.
A total integration will be started shortly after the middle of
March. The first phase will consist of laying out core storage,
and integrating the real time background programs.
The only pending unresolved technical problem appears to be
how to filter the crosstalk out of the correlator, or whether
this is even necessary.
4. A change to subroutine TMAT has been proposed (incorporating
earth-curvature). Since it will not affect the system integration
and check-out, we are deferring this work until the correlator
filter model and other possible changes are completely specified.
-4-
7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
-7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2
fl
A
r-1
fl
At that time, (possibly early in June), we will estimate the total
additional work required 'and determine whether a change of
scope might be in order.
5. There have been no oral aLi
greements or understandings reached
during this reporting period.
6. No changes or agreements have been made requiring the con-
tracting officer's approval.
7. No other unresolved matters are known to exist.
Li