STATUS REPORT FOR PERIOD 1 MARCH THROUGH 31 MARCH 1969 SUBMITTED UNDER CONTRACT TO U.S. GOVERNMENT CONTRACT NO. (SANITIZED)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79B00873A001500010006-2
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
69
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 17, 2012
Sequence Number: 
6
Case Number: 
Publication Date: 
April 4, 1969
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79B00873A001500010006-2.pdf1.59 MB
Body: 
91?=1 r- 90???? Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 - z). B c Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 7 STATUS REPORT for Period 1 March through 31 March 1969 Submitted under Contract to U. S. Government File No. 11038 STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 This document is presented as the Monthly Status Report under Contract to the U. S. Government, The report period represented herein covers the period 1 March through 31 March 1969. STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 t-=.1 Program Status INDEX Page Summary 1 Task 1 - Statements of Work, Specifications, Report 2 Preparation Task 2 - Scheduling and Planning 3 Task 3 - Test and Inspection Procedures Task 4 - Management, Administration and Supervision 5 Task 5 - Meetings 6 Task 6 - Facilities Requirements 7 Task 7 I. Main Frame 8 Task 8 - Skin 9 Task 9 - Granite and Ways Assembly for Stages 10 Task 10 - Air Bearings 11 Task 11 - Stage Drives 12 Ta sk 12 - Film Drives 13 Task 13 - Film Platen 14 Task 14 - Film Cooling 15 Tasks 16, 17, 18 - Optics 16 Task 20 - General Platen Illumination 17 Task 21 - Optical Bridge 18 Task 22 - Interferometer Assembly 19 Task 23 - Optics Drives 20 Task 24 - Image Analysis System 21 Task 26 - Digitizing Logic 22 Task 27 - Metric Readout 23 Task 28 - Output Logic and Interface 24 Task 29 Cabling 25 Task 30 - Control Console 26 Task 32 - Computer -27 Task 33 - Electronic Racks & Control Cabinets 28 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 34 - Utilities, Vacuum and Air Systems 29 Task 35 - Vibration Absorption and Leveling 30 Task 36 - Overall Assembly 31 Task 37 - R.F.I. Suppression 32 Task 38 - Environmental Control 33 Task 39 - Reliability Analysis 34 r-, Task 40 - Installation 35 1=i Task 42 Breadboards and Test Services 36 Task 43 - Computer Programming and Services 37 Task 44 Preacceptance Test in Fabrication Plant 38 Task 45 - Acceptance. Test in Fabrication Plant 39 Task 46 - - Acceptance Test after Installation 40 Task 47 - Instruction Manuals 41 Task 48 - Spare Parts Lists 42 Task 49 - Operator Training 43 t=i -71 H ,E 'E Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 APPENDICES Letter dated 7 March 1969 Trip Report to Progress Report for February 1969 Trip Report tc 1 Progress Report for February in App,, I. App. II. App. III. App. IV. 1969 App. V. STAT STAT STAT STAT EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 I ? " IL; t=t PROGRESS SUMMARY . Scheduled percentage of completion - 53.9% Actual percentage this date - 51.5% ? This month's report marks the achievement of attaining over 50% of the predicted program effort. Activity has been high during this report period in the areas of subassembly, subassembly test, and completion of delivery of many electronic chassis and components. We are currently preparing for shipment of the electronic cables and components which are required for installation of the optical system in the optical bridge, and the assembly of the stages and other components at is proceeding as required. STAT These items are covered in more detail under individual task headings. -1- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 fl Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 r- r9 Task 01 Statements of Work, Specifications, Report Preparation Scheduled percentage of completion 55% Percent completed this date 55% No new work statements or specifications have been prepared or issued during this report period. -2- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 ^ Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 02 Scheduling and Planning Scheduled percentage of completion Actual percentage this date 55% 55% A new schedule for preparation and submittal of documentation has been prepared and incorporated into Program Plan. A formal request for changes to the contract to reflect the new schedule was submitted on 7 March 1969. A copy of this request is included as Appendix I. - STAT Lj Declassified in Part - Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010006-2 n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 03 Test and Inspection Procedures Scheduled percentage of completion 33% Actual percentage this date 35% Test procedures are currently being prepared for the servo simulation program which will provide information on electrical and mechanical characteristics of the optical drive chain and attendant systems. year. E ir ? These tests are scheduled for April and May of this -4- .4 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Li fl Task 04 Managemerit, Administration and Supervision Scheduled percentage of completion 55% Actual percentage this date 55% During the current month the various elements of the program maintained their scheduled status. Film cooling and clamping details are being worked out at this time, and are covered in more detail under the individual task headings. -5- Fr: I Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 i17 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 t=i :=J Li Task 05 Meetings Scheduled percentage of completion Actual percentage of completion 55% 55% During the month of March, a meeting was held with the customer at the discussed: facilities. Following is a list of the items STAT 1. Review of job schedule. 2. Review of deliverable items schedule. 3. Stereocomparator air bearings and stages, includ- ing demonstration. 4. Clean room facility and demonstration. 5. Operator Training Manual. 6. Spare Parts List and Mainte.nance Program. 7. Review of servo simulation program. 8. System acceptance tests. 9. Film cooling and film clamping mechanism and demonstration. Additionally, a meeting was held with the customer's site preparation consultant. This meeting is discussed in detail under Tasks 38 and 40. rl LJ Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 E. Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 06 Facilities Requirements 7 Scheduled percentage of completion 95% 1=2 Actual percentage of completion 75% 1 fl The air conditioning equipment installation has L= been completed into the Clean Room. All filters have been installed and both units have been run under "no load" conditions to determine the location of any leaks or unequal pressures within the ducts. The initial tests were satisfactory, 1 Li Installation of inside ductwork and "start up" is expected by April 15, with another week required in which to balance the air flow through the system. EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 07 Main Frame and Structural Elements Scheduled percentage of completion 98% Actual percentage of completion 93% No additional work was scheduled for this task for the month of February. Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 08 Skin Scheduled percentage of completion ? 35%, Actual percentage this date 30% As reported last month, the fabrication of the skin coverings for both the right and left stages will be scheduled to coincide with the overall assembly of the Stereocomparator. No additional work was scheduled for this task during the month of March. -9- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 '71 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 t=1 7-11 Task 09 Granite and Ways Assembly for Stages Scheduled percentage of completion 98% Actual percentage this date 95% The two granite laser supports were received from the vendor during the month of March. Delivery of the granite sections is now complete. The drilling and tapping of the granite laser supports will be scheduled upon completion of the Clean Room facilities. -10- b Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 fl Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Q7J Task 10 Air Bearings Scheduled percentage of completion 62% Actual perceqtage this date 75% As reported previously, the air bearings required to guide and support the stages have been installed. No work was scheduled on this task for the month of March. Z.= -11- r- , Declassified in Part- Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 11 Stage Drives Scheduled percentage of completion 60% Actual percentage this date 55% Because of the necessity to complete the Clean Room facilities before the Stereocomparator eg.uipment.assembly can be continued, it has been necessary to re-schedule the installation of the stage drives. This is because the confusion of the Clean Room constkuction prevents making delicate assemblies such as.the stage drives. March. No work Was scheduled on this task for the month of - 12 - EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 I 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 ^ LI ^ ^ 1=1 Task 12 Film Drive and Transport System Scheduled percentage of completion 50% Actual completion this date 65% Minor modifications are being made to the film drive and transport system to insure a closer compatibility with the film platen and film clamping system. -13- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 13 Film Platen and Film Clamping Scheduled percentage of completion 55% Actual percentage this date 49% A prototype of a film holddown device to assist the vacuum clamping system was built by the shop and STAT demonstrated to the customer during their last visit. While the device performed its function, it was ?Ker........eaa.bewattcnb..at.cwmea.a.szvzinimkax-a...t..eoote,a..t4r.E,PV..kturuao.az.Aak.xr.ewhaoaneuatgafiaimr.ahe..,Sa.eaer.,.. considered too large and was generally unsuitable. An air jet method for performing this operation is being explored before a definite decision will be made with regard to the system to be used on the Stereocomparator. -14- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 ? r-- Task 14 Film Cooling Scheduled percentage of completion 40% Actual percentage this date 40% A determination of the volume and temperature of the air required for the film cooling assembly was made, using the prototype device fabricated by the. shop. The new valving required to give optimum film cooling is presently being installed in the film cooling system. In addition, Polaroid photographs of the objective lens mounts and the film cooling arrangement were sent to for their use in providing for the air flow surrounding the objective lenses. -15- S TAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 STAT (-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 fl Tasks 16, 17 ? and 18 Viewing Optics, Viewing Illumination, Reticle Projector and Illumination t=i Scheduled percentage of completion 64% Actual percentage this date 65% During the month of March, to the optical vendor drawings were sent STAT detailing the wiring installations to be made by them to interface the optical subassemblies in the optical bridge. Interfacing connectors required between the optical bridge and the power supply for the optics were also sent for installation in the designated placed on the o6tical bridge. A monitoring trip is planned for the third week of April 1959. -16- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 STAT 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 fl t=. n Task 20 General Platen Illumination Scheduled percentage of completion 61% Actual percentage this date 41% As reported previously, the general platen illumina- tion assembly is ready for installation on to the Stereocomparator. No additional work was scheduled for the month of March on this task. 4 ? Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 21 Optical Bridge and Supports Scheduled percentage of completion Actual percentage this date 90% 90% As mentioned under Tasks 16, 17 and 18, drawings detailing the wiring installations and wiring connectors were sent to for their use in interfacing the optical bridge with the optics system. -18- S TAT I[r- ILD Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 :I Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 1=0 1,0 Task 22 Interferometer Assembly Scheduled percentage of completion 61% Actual percentage this date 57% The interferometer assembly is ready for installation on to the Stereocomparator. Installation will be scheduled upon completion of the Clean Room. -19-- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 t= L, H. 1-i 1 c=1 F) I I-1 1 I 0 Task 23 Optic's Drive Assembly Scheduled percentage of completion 57% Actual percentage this date 45% The chassis interfacing the optics drive assembly with the optics have been received and were unit tested in the shop. It was determined that minor modifications will be necessary to interface with the optics assembly. We anticipate that these changes will be implemented and the chassis ready for breadboard testing by the end of April? Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010006-2 771 fl EZ= Task 24 Image Analysis System March to System. Scheduled percentage of completion Actual percentage this date 43% 55% A monitoring visit was made during the month of the subcontractor supplying the Image Analysis The trip report covering this visit is included as Appendix II. A copy of progress report for the month of February 1969 is included as Appendix III. -21- S TAT flDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 STAT ? 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 7 L,J fl Task 26 Digitizing Logic Subassembly Scheduled percentage of completion 90% Actual percentage this date 86% The digitizing logic subassembly is ready for installation. After installation of the interferometers on to the stages, the digitizing logic chassis will be installed, and the final system check out will begin. 22 - Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 r- I E Task 27 Metric Readout Scheduled percentage of completion 94% Actual percentage this date 92% Additional testing of the metric readout with the control console display panel was done during the month of March. The results of these tests were satisfactory. There will be some additional testing of the metric readout to determine that the program counting sequence which converts one quarter wave lengths to metric units is within the required accuracy tolerance. This testing is scheduled for the month of April. -23- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 7 Declassified in Pirt'r Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010006-2 Task 28 Output Logic and Interfaces Scheduled percentage of completion 98% Actual percentage this date 72% The revisions necessary to insure compatibility between the computer programming and the output logic circuitry are now substantially complete. Most of the circuitry has been checked out and debugged. The checkout of the logic drawers in combination with the control console, computer and servo drives is scheduled for the months of April and May. -24- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 n- 1I In r=i I n I Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 29 Cabling Scheduled percentage of completion 98% Actual percentage this date 91% In order to route the cables around the optical components in the optical bridge, it was necessary to modify some of the cable assemblies used in the optical bridge. These modifi- cations are now in process, and the cables are being made ready to ship to the optics subcontractractor. The percent progress of the cabling required to inter- connect the various electrical and electronic elements being assembled in the shop is as follows: STAT Cabinet (Stage drives, film drive and transport system) 100% Cabinet #2 (Optics drive, interface with Image Analysis System) 100% E Cabinet #3 (Metric readout, output logic and interfaces) 89% ;73 Electrical arrangement (floor interconnection of all cables) Control Console Display Panel Optical Bridge Stage Assembly 89% 97% 95% 50% 73% 2 5 1 7 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 30 Control Console and Chair n Scheduled percentage of completion 79% Actual percentage of completion 62% The wiring of the control console has been I completed, and the console is now being tested in conjunction ? with the logic drawers with which it interfaces. I-J The checkout of the analog controls for the optic, servos in the console is expected to be finished by the end of April. n j Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 32 ? Computer Scheduled percentage of completion 95% Actual percentage this date 95% The cleaning and disassembly of the computer has been deferred until April in order to accommodate the program efforts of program. schedule. 7 the subcontractor supplying the computer This deferment will not interfere with the overall -27- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 ? Task 33 Electronic Racks and Control Cabinets fl K=1 Scheduled percentage of completion 88% Percentage completed this date 88% The installation of the electronic chassis into the racks and control cabinets has been rescheduled to coincide with the completion of the Clean Room. -28- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 E. i=i ? Task 34 Utilities Scheduled percentage of completion 56% Actual percentage this date 55% The shop is in the process of installing the mechanical components comprising the utilities assembly. The electronics required to operate the utilities are virtually complete and are scheduled to be installed in the cabinet during the month of April. -29- S TAT in Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 1E Task 35 Vibration Absorption and Leveling Scheduled percentage of completion 90% Actual percentage this date 85% No additional work was scheduled for this task during the month of March. -30- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 7. Task 36 Overall Assembly Scheduled percentage of completion 31% Actual percentage this date 18% No additional work was scheduled for this task during the month of March. Installation of the completed subassemblies is scheduled for the month of April. -31- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 wm [11 1 ! ?F-? Task 37 Radio Frequency Noise Suppression ? ( ? :1 Scheduled percentage of completion Actual percentage this date ? 0 ok No work was scheduled on this task for the month of March. -32- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 , 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 C.D fl ? fl Ii t=i Task 38 Environmental Control Scheduled percentage of completion 75% Actual percentage this date 58% During the month of March, a meeting was held with the customer's site preparation consultant to discuss the final drawings detailing the environmental control requirements. A copy of the trip report covering the discussions held is included as Appendix IV. EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 39 Reliability Analysis Scheduled percentage of completion Actual percentage this date ID% No work was scheduled on this task for the month of February. -34- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 'fl Task 40 Installation Scheduled percentage of completion Actual percentage this date 10% A meeting was held in March between the customer representatives, including the air conditioning and site preparation consultant, and representatives STAT A copy of the trip report covering the discussions held is included as Appendix IV. -35- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 1=3 Task 42 Breadboards and Test Devices Scheduled percentage of completion 45% Actual percentage this date 25% Breadboarding and prototype testing of the various subassemblies is continuing in the 27 and 30. -36- shop. See Tasks 138 14, STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 ? Task 43 Computer Programming and Services Scheduled percentage of completion 75% Actual percentage this date 60% Personnel from the subcontractor STAT supplying the computer program for the Stereocomparator; are continuing with the development of the program, using the computer installed at the facilities. A copy of their Progress Report for the month of February is included as Appendix X of this report. ? , Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 44 Preacceptance Test in Fabrication Plant Scheduled percentage of completion Actual percentage this date Aol No work was scheduled for this task during the month of March. -38-- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 IDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 45 Acceptance Test in Fabrication Plant Scheduled percentage of completion Actual percentage this date 0% No work was scheduled for this task during the month of March. -39-- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 I Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 46 Acceptance Test after Installation Scheduled percentage of completion 0% Actual percentage this date 0% No work was scheduled for this task during the month of March. -40-- I Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 1=1 1=i t=i Li :=11 It=i Task 47 Instruction Manual and Drawing Submittal Scheduled percentage of completion 21% Actual percentage this date 12% is continuing to revise the design drawings to cover the "as built" status of the various subassemblies. Work is also continuing on the preparation of the Operators Manual. -4 1- S TAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 48 Spare Parts List Scheduled percentage of completion 6% Actual percentage this date 20% A preliminary spare parts list, covering both the recommended mechanical and electronic spares, has been completed. However, as the program progresses, we anticipate there will be additions and deletions to the present list. -42- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 1.7] h Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Task 49 Operator Training Scheduled percentage of completion Actual percentage this date 48% During the month of March, work continued on the manual which will be used in training the operators to use the Stereocomparator. -43- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010006-2 fl Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 fl LI r- Li U. S. Government Subject: Gentlemen: 7 March 1969 STAT As stated in the recently monthly technical Status Reports, certain items of the Deliverable Items will be delayed. hereby STAT requests amendment to the above referenced contract to reflect the following delivery schedule: 1. Operating High Precision Stereocomparator. 2. Final Acceptance/Test Plan in a format approved by the Contracting Officer's Technical Represen- tative. 14 June 1970 No change 3. One (1) set of Operating Instruction Manuals in a format approved by the Technical Representa- 24 Nov. 1969 tive of the Contracting Officer. (Draft) 4. One (1) set of Programming Instruction Manuals in a format approved by the Contracting Officer's 6 Apr. 1970 Technical Representative. (Draft) 5. One (1) set of Maintenance Instruction Manuals in a format approved by the Technical Representa- 24 Nov. 1969 tive of the Contracting Officer. (Draft) 6. One (1) recommended Spare Parts List to include manufacturer's expected lifetime per part, and In a format approved by the Technical Representa- 24 Nov. 1969 tive of the Contracting Officer. (Draft) 7. One (1) Master Set of Contractor's shop draw- ings, drawn to an as built" status, for the High Precision Stereocomparator, which shall be in accordance with industry standards for said drawings. 31 July 1970 7 1, Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 ?1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 U.S. Government Page 2. 7 March 1969 8. One (1) Blue-line copy of Contractor's shop 31 July 1970 drawings as set forth in Item No. 7 above. 9. Monthly Financial/Technical Progress Report, No change generally in the format required by Specification DB-1001, revised, attached hereto, which is incorporated herein by reference and made a part hereof. 10. Any and/or all informal technical reports, drawings, ray traces, optical designs, and other technical data acquired by the Contractor either directly or by reason of any subcontract or consulting agreement entered into in performance of work hereunder. 11. Any and/or all Alignment Targets, Resolution Targets and Target Film generated by either the Contractor or his subcontractor for use in testing the High Precision Stereocomparator Optics. 12. Any and/or all components, modules, or systems either fabricated, furnished, or purchased as part of the performance of work hereunder. 31 July 1970 31 July 1970 31 July 1970 No other changes to the contract are anticipated at this time. If we can furnish any additional information, please do n9t hesitate to contact the undersigned. BCJ:jm Very truly yours, Administration Manager Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 U Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 00 00 n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 t=1 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Company Contacted: Contacted by: Persons Contacted: Date Contacted: Subject: TRIP REPORT March 19, 1969 Job 4342 - Tasks 24-25 showed the package of drawings that they were sending to together with their monthly report for February which shows that they have completed 55% of their program. STAT STAT They expect to have their manuals in first draft from by the end of March 1969. Their present schedule also calls for completion of acceptance testing by June 30, 1969. They indicated that their overall schedule was quite tight, and no one should be surprised if some additional 1=1 1=1 slippages occur. At this point in the program, is not on the STAT critical path, and no schedule problem is anticipated. 1=1 D Two months ago presented various aerial photographs from which selected three for the acceptance testing of the image analyzer. These three photographs were then printed b and STAT in the form of enlargements, STAT selected three areas on the prints for use in the fabricationSTATT 1= Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 k=i Trip Report STAT 2 . of the test imagery. These three photographs represented three fundamentally different types of photography: one a mosiac of houses and streets in a fairly regular pattern; another was a mountainous terrain, with various topographical features including roads and buildings; the third was a wooded area with rather weak features. was directed to make up these three photographs in the form of STAT positive transparencies with various degrees of magnification and anamorphic distortion. Some of this work has been completed by STAT and two of the photographic series were acceptable. The third series differed in density with each magnificafion change, ie., as the magnification became greater, the density of the film became less. This was not considered an acceptable condition, since it would mean comparing photographs considerably different in density. was requested to make this particular series of photographs over STAT again, using a technique which would result in equal density for all of the photographs. In reviewing the connecting the work, it was noted that the high voltage cable image dissector tube to the STAT chassis was equippedSTAT with two female plugs which would have to be mated for installation. Since two female plugs could not be connected together, was advised STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 n I ? 1 I .7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Trip Report that this was an unsatisfactory condition. was the responsibility of 3STAT stated that installation STAT recommended that S TAT buy an adaptor or cut off the plugs on the cable and replace them with whatever configuration was necessary for A controversy developed at this point which was not settled during the visit, took the position that this matter was firmly within the requirements of the contract and was one of the deliverable items of the contract, and as such, it was necessary for in such a way that it could be used. Even though STAT STAT to build the cable STAT took a very strong negative position in this matter, it is hard to believe that this can result in a real problem because of the ridiculousness of the situation. The next visit with of May. STAT is tentatively scheduled during the first half STAT LJ Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 jDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 tz o E 0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 -7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Uj fl tzJ HO . fl Ii, 1 PROGRESS REPORT FOR PERIOD ENDING 28 FEBRUARY 1969 1.0 Progress during Reporting Period Checkprints received on layouts performed by outside vendors were determined to be satisfactory. Subsequent schematic modifications were made on the distortion analyzer, parallax analyzer, video correlators, and channel selection logic circuitry. The layout work of these assemblies was purchased. Source control drawings were corrected on all assemblies in which outside layouts were performed. Drawings were released on image dissector assembly, correlator chassis assembly and cable drawings. Purchase orders were placed on these items. Sub assembly construction began 'during this period. The extender board and the sum and difference boards were completed. Work also progressed on the time base generator, modulator, dynode regulator, and video amplifier boards. Schedule delays have resulted from various sources. Delays in sign offs have resulted from customer requests related to chassis assembly, cables and image dissector holder. The was closed on six days because of weather conditions and the intervening holiday. Vendors have also indicated longer delivery times on the remaining board layouts. Overall progress to the end of this reporting period is approximately 55%. STAT STAT 2.0 Plans for Next Period Layouts on the proprietary modules, test fixture and image dissector holder are expected to be completed and procurement of these items started during March. 7 ? li Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 L.1 fl L.3 fl 7 ! LJ ? r- It will be necessary to check the layout drawings from outside vendors and to make final adjustments to the formats to agree with previous drawings. Drafts of the test procedures, operating manual, and spare parts list will be generated for approval. Sub assembly construction and testing are expected to continue through May. Acceptance test at week of June. is tentatively expected to occur during the last SI-AT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 LIDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 e oo Jie Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 TRIP REPORT Company Contacted: STAT Contacted by: fl Persons Contacted: and Customer Representative STAT Date Contacted: March 20, 1969 Subject: Job #342 - Task #40 This visit was for the purpose of reviewing the site preparation mechanical, environmental, and electrical drawings. Specification No 13, covering the air conditioning requirements for the Stereocomparator installation had been issued some time ago. This: specification made reference to, but did not include, the conditioned air requirements for film handling and optical bridge cooling. Revision #1 to the specification has just been completed, bringing up to date the film cooling requirements based on experiments performed at and including the information on optical bridge cooling. This revision was given to STAT STAT STAT The film cooling and film handling air conditioner was specified to have a capacity of 50 cfm at .35 psig and the equipment procurement will proceed on that basis. In general, the specifications prepared by appear to be fully compatible with the nstallation. Suggestions were made by for minor changes and improvements with reference to: STAT STATT ElDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 - -1 Trip Report a) handling the heavy components of the Stereocomparator during installation, i.e., the services of a rigging contractor will be retained to shore up a floor over the "pit" to move the Stereocomparator heavy parts into position. This is in lieu of the installation of an expensive overhead travelling crane. b) in connection with the distribution of air required for the equipment containing paper punching components. c) for the location of the temperature sensing elements immediately ahead of the Stereocomparator in the air stream. It was noted that in connection with b) and c) above, detailed engineering and possibly experimental work may have to be performed before some of the situations can be resolved. is planning to perform some experiments in the immediate future with respect to the location of temperature sensing elements for ti-e 2 STAT STAT lean STAT Room air conditioning-control. The results of this work will be turned over to as soon as the information is available. STAT The supply and return duct system related to the air cooling requirements for the optical bridge, the illumination systems and the control console Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 L.7 In. ' Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 ?-???? Trip Report were discussed in detail. A marked drawing was delivered to showing the air distribution outlets with respect to the optical bridge. There is a serious space problem for the duct work. To help alleviate this problem, it was agreed that four to six approximately 3" conduits would be laid through the Stereocomparator's foundations so that various service and utility supplies may be furnished to the various portions of the Stereo- comparator without interference with the air conditioning duct work. It would seem that an appropriate site preparation schedule can be achieved by which will not conflict with the installation requirements of the Stereocomparator. 3.STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 STAT IDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 ID Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 MONTHLY PROGRESS REPORT February, 1969 This technical report is for the reporting period from February 1 to February 28, 1969. The report is prepared according to Specification number DB1001 (as modified). 1. During the month, the entire background program has been coded, and each subroutine has been individually tested. A special code-checking driver has been created for each routine which tests all the permutations and limiting values of the sub- routine's inputs. The checked-out routines are: a. TMAT (without earth curvature) b. MTS c. XAI d. T2PAN e. T2STRP f. XMX1 g. MATMAK h. CAMATS i. YMR First draft documentation has been prepared for all the above routines. -1- L Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 I i ' Subroutine PTOP, also part of the background system, has been flowcharted and coded. It is presently in the debugging stage. Subroutine REORT has checked-out extensively. This work, as well as the above, has been done on the CDC 6600 computer in Palo Alto. Using this computer greatly facilitates debug- ging, primarily because of the peripheral speeds. In the non-real time portion of the program, subroutines a. PARMOD b. NOCAM and c. TBSRCH have been flowcharted and coded. Since these and most of the other non-real time routines are in machine language, they must be code-checked using the DDP-516 itself. Subroutines a. DA TAIN b. SCANNER and c. CONVRT, which were flowcharted last month, have been coded this month. -2- 17 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 TI Lii The foreground routines a. EXECZ and b. TRK have been integrated and a PAL-AP system tape created so that anyone may run them. Input is via the teletype, using an octal corrector subroutine; output is via teletype, using standard FORTRAN I/O routines. For this first "calibration system," the routines a. CVB b. CVF c. REORT ?d. TMAT e. RDCR f. RDCRX g. RDOP h. RDST i. GTP j. RECALL k. FIXR and I. LSTC are all dummies which merely report via teletype each time they are called. -3- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 , Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 Approximately 55% of the total work has been completed as of this reporting period. 2. Next month, the non-real time routines f a. TTIN b. RECIN c. FID1 d. FID2 e. STAGIN f. TTIC and will be flowcharted, coded, and check-out will begin. A total integration will be started shortly after the middle of March. The first phase will consist of laying out core storage, and integrating the real time background programs. The only pending unresolved technical problem appears to be how to filter the crosstalk out of the correlator, or whether this is even necessary. 4. A change to subroutine TMAT has been proposed (incorporating earth-curvature). Since it will not affect the system integration and check-out, we are deferring this work until the correlator filter model and other possible changes are completely specified. -4- 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 -7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2 fl A r-1 fl At that time, (possibly early in June), we will estimate the total additional work required 'and determine whether a change of scope might be in order. 5. There have been no oral aLi greements or understandings reached during this reporting period. 6. No changes or agreements have been made requiring the con- tracting officer's approval. 7. No other unresolved matters are known to exist. Li -5- r Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010006-2