STATUS REPORT FOR PERIOD 1 SEPT. THROUGH 30 SEPT. 1968 SUBMITTED UNDER CONTRACT TO U.S. GOVERNMENT CONTRACT NO. (SANITIZED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP79B00873A001500010003-5
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
53
Document Creation Date:
December 28, 2016
Document Release Date:
August 17, 2012
Sequence Number:
3
Case Number:
Publication Date:
October 4, 1968
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP79B00873A001500010003-5.pdf | 1.17 MB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
I I V -3 4
ri\cts4.
ER'ri
STAT
Lem -
Declassified in Part -Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
LT71
1
STATUS REPORT
for Period
1 Se it. through 30 Sei_pl.,_11?_b
Submitted under Contract to
U. S. Government
File No. 11038
STAT
STAT.
1,?; Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
L
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
F1'
7
tJ
1
fl
Li
fl
7:1
This document is presented as the Monthly
Status Report under contract to the Ti. S.
Government,
The report period represented herein covers the
period of 1 September through 30 September 1968.
STAT
STA
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
INDEX
Page'
Program Status Summary 1
Task 01 Statements of Work, Specifications, Report
Preparation 2
Task 02 Scheduling and Planning 3
Task 03 Test and Inspection Procedures 4
Task 04 Management, Administration and Supervision 5
Task 05 Meetings 6
Task 06 Facilities Requirements
Task 07 Main Frame and Structural Elements 8
Task 08 Skin 9
Task 09 Granite and Ways Assembly for Stages 10
Task 10 Air Bearings 11
Task 11 Stage Drives 12
Task 12 Film Drive and Transport System 13
Task 13 Film Platen and Film Clamping 14
Task 14 Film Cooling 15
Tasks 16,
17,18 Optics - Viewing Optics, Viewing Illumination,
Reticle Projector and Illumination 16
Task 20 General Platen Illumination 0 17
Task 21 Optical Bridge and Supports 18
Task 22 Interferometer Assembly 19
Task 23 Optics Drive Assembly 20
Task 24 Image Analysis System 21
Task 26 Digitizing Logic Subassembly 22
Task 27 Metric Readout 23
Task 28 Output Logic and Interfaces 24
Task 29 Cabling 25
Task 30 Control Console and Chair 26'
Task 32 Computer 27 '
Task 33 Electronic Racks and Control Cabinets 28
Li Declassified in Part- Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 34 Utilities, Vacuum and Air Systems 29
Task 35 Vibration Absorption and Leveling 30
Task 36 Overall Assembly 31
Task 37 Radio Frequency Noise Suppression 32
Task 38 Environmental Control S 33
.Task 39 Reliability Analysis 34
Task 40 Installation S 35
Task 42 Breadboards and Test Services 36
Task 43 Computer Programming and Services 37
Task 44 Preacceptance Test in Fabrication Plant 38
Task 45 Acceptance Test in Fabrication Plant 39
Task 46 Acceptance Test after Installation 40
Task 47 Instruction Manual and Drawing Submittal 41
Task 48 Spare Parts List S. 42
Task 49 Operator Training 43
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
1 APPENDICES
i 1
I
11 Progress Report, ? : STAT. .
eptem er 968 Appendix I
I
ii
1
IDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
iii
7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
PROGRAM STATUS
Summary as of September 30, 1968
Scheduled percentage of program completed - 28.5%
Actual percentage completed this date - 28.0%
Overall program progress, with the exception of several
minor adjustments, has been proceeding according to plan. Several
,vendors have reported that they anticipate some delay in their delivery
schedules which necessitated our making some revision to detailed
plan. These revisions, however, are of a work-around nature which do
not affect the total program.
As the individual task reports show, inspection and
checkout of electronic chassis is proceeding normally, and in-plant
production is on schedule.
We anticipate no major problems in the immediate future.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 01 Statements of Work, Specifications, Report
Preparation
Scheduled percentage of completion 27%
Actual percentage of completion
27%
Subcontractor's progress reports are being received
and transmitted with each monthly status report submitted by
These status reports, which are included under
the appropriate task headings, indicate that schedule requirements
are being met.
Any revision to, or additional specifications which
may be required, will be prepared and submitted immediately for
approval.
STAT
Declassified in Part- Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
-7)? Task 02 Scheduling and Planning
n ?
Scheduled percentage of completion 27%
Actual percentage of completion
27%
Detailed schedules for machine assembly, mounting
the optical bridge and for shipment of the bridge to th sub-
contractor have been implemented. These schedules incorporate the
latest information from vendors and suppliers, and are designed to
meet the
subcontractor's requirement that the optical bridge
be available in December or before.
Schedules for the test programs are currently being
detailed and will be issued in November.
-3-
S TAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 03 Test and Inspection Procedures
? Scheduled percentage of completion 20%
Actual percentage of completion 17%
Test procedures are being written as required for
inspection and test of completed subassemblies/assemblies.
Many of these procedures will be incorporated into the overall
test procedure which is scheduled to be written during the early
part of 1969.
-4-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
nI Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
77.
Task 04 Management, Administration and Supervision
Scheduled percentage of completion 27%
Actual percentage of completion 27%
During this report period,
visited with
sponsor personnel at the installation site to review and resolve
technical situations relative to computer programming and associated
problems. In addition,
STAT
attended a meeting at the STAT
installation site to resolve various questions pertaining to layout
and installation, and to coordinate future interface work. This
meeting resulted in mutual agreement on the solution to these questions,
and our plans for installation will be formulated on this agreement.
Other management effort during this report period has
been routine, with no major problems other than those reported in the
individual tasks.
-5-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
fl
L.J
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 05 Meetings
Scheduled percentage of completion 27%
Actual percentage of completion 27%
There were no formal meetings scheduled for this
report period. However,
Program Manager, and
Technical Director, met with customer representa-
tives to discuss several items of interest which were disclosed
in the facilities design of the installation site.
This meeting and the results of same are discussed
under Task 04 - Management, Administration and Supervision.
-6-
STAT
-STAT
Declassified in Part -Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 06 Facilities Requirements
Scheduled percentage of completion 50%
Actual percentage of completion 45%
During this report period, the machine pad has been
poured and the layout of air conditioning equipment on this pad has
been prepared and approved.
Purchase orders have been placed and satisfactory
delivery dates obtained for all required Clean Room equipment.
Detailed schedules for Clean Room start-up have
also been prepared and approved.
-7-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
fI I Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 07 Main Frame and Structural Elements
Scheduled percentage of completion 98%
Actual percentage of completion 93%
As reported last month, the main frame which is
the basis for the Stereocomparator has been installed in the
Clean Room.
Subassemblies, as they are completed, will be
mounted to this structure.
Additional work on this task will include the
removal of the optical bridge support for transfer to the optics
subcontractor for installation of the optios. Upon return of the
assembly to
additional work will be required to remount the
bridge to the main frame.
STAT
0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
I Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
i=1
Task 08 Skin
Scheduled percentage of completion 20%
Actual percentage this date 18%
The aluminum skin which will form the protective
covering for the various subassemblies of the Stereocomparator is
being fabricated by th
hop. STAT
During the month of September, portions of the skin
which will house the utilities and electronics on the rear of the
machine were fabricated.
Fabrication of the skin is scheduled to coincide with
the completion of the various subassemblies.
-9-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
:7)
Le Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
7-1
AE
fl
Task 09 Granite and Ways Assembly for Stages
Scheduled percentage of completion 78%
Actual percentage this date 72%
The right hand granite base, one of the .twelve granite
sections required by this task, was received and installed during
the month of September. The holes and brass plugs necessary for
the mounting of subassemblies onto the granite were drilled and
tapped by the shop.
Because of production difficulties, it was necessary
for the vendor to reschedule the left hand granite base for the week
of October 4, with remaining sections to be delivered the week of
October 2 1 .
-10-
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
rn
Lj Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
^
Task 10 Air Bearings
Scheduled percentage of completion 50%
Actual percentage this date 50%
The first portion of this task, fabrication of
the air bearings used to support and guide the two stages, was
completed in June.
Assembly and installation of the air bearings
which consitutes the second half of this task is scheduled to
coincide with the mounting of the stages to the granite bases.
We anticipate this work to begin during the next month.
-11-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 11 Stage Drives
Scheduled percentage of completion 51%
Actual percentage this date 44%
A portion of the mechanical components of the stage
drives has been assembled. The work done so far includes assembling
the "Y" axis stage drive to the castings and the assembly of the "X"
axis stage drive to the drive motor support.
A total of 12 servo and control chassis are required
for this task. These consist of:
4 - servo amplifiers
4 - 23-Bit D/A converters
2 - stage test chassis used
2 - stage limit relay interlock chassis (safety
devices to control stages)
All of these chassis have been received from the vendor
with the exception of one stage test chassis which is scheduled for
delivery the first week in October.
Approximately 50% of the chassis received have been
bench tested in th shop.
The shop is in the process of fabricating and
assemblying inter-connecting plugs on the chassis. Completion of this
work is expected to be within two weeks.
-12-
S TAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
L.7
Li
Li
r-
t.7
:71
Task 12 Film Drive and Transport System
Scheduled percentage of completion 50%
Actual completion this date 42%
The film drive assemblies which were fabricated in
June have now been released from storage and assembled with the
platen frame.
Breadboard test services have been set up, connecting
the film drive to a substitute electronic control system for checkout.
A field engineering trip was made to the vendor who is
supplying the various electronic chassis required for the film drive
assembly. Although all of the chassis have been essentially completed,
was not able to accept them for delivery because of minor corrections
which were necessary. Another field engineering trip is planned for the
first week in October, and it is expected that the chassis can be
released for delivery at that time.
As soon as these are received, bench tests will be set
up for chassis checkout performance.
- 1 3-
S TAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 13 Film Platen and Film Clamping
Scheduled percentage of completion 27%
Actual percentage this date 12%
The film platen and clamp were released from
storage for trial assembly. The substitute glass platen which
was ordered for use in the trial assembly has been received and
installed.
The vacuum clamp has been installed to the
platen and checkout of this subassembly will begin this month.
-14-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 14 Film Cooling
Scheduled percentage of completion 18%
Actual percentage this date 16%
During the recent meeting with the customer,
discussions were held on the air supply and refrigeration for
the film cooling system.
As soon as the requirements for this system are
resolved, ill incorporate these specifications into the
film cooling system.
-15-
0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
STAT
7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
r-
711
r-
Tasks 16, 17,
and 18 Viewing Optics, Viewing Illumination
Reticle Projector and Illumination
Scheduled percentage of completion 16%
Actual percentage this date 14%
The
monitoring trip to
optical sub-
contractor performing the above tasks, was postponed until the
month of October. It was felt that inasmuch as
STAT
had STAT
just returned to work the first of September following their annual
one-month shutdown, it would be more effective to check their
progress after they had resumed operation for a month or more.
One of the major points which
STAT
lana to discuss
Li
with
is the interface of the optical
system with the other
STAT
subassemblies
of the Stereocomparator.
A list of
details concerning
this
interface was prepared and sent to
personnel in October.
for discussion with
STAT
STAT
-16--
1
? Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
pi Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
1
7-
7
Task 20 General Platen Illumination
7
Scheduled percentage of completion 45%
?kJ
Actual percentage this date 41%
As reported previously, the platen illumination
system has been fabricated, parts inspected, and is in storage
awaiting final assembly.
The electrical chassis required for this system
has been completed by th
hop with the exception of the
installation of two RPI-proof, high voltage connectors. Delivery
of these connectors is expected within the next month at which
time the
shop will complete this assembly.
-17-
S TAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
'
been received. Th
granite bases.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 21 Optical Bridge and Supports
Scheduled percentage of completion 78%
Actual percentage this date 69%
The optical bridge, consisting of the center bridge,
right and left hand bridges, and optical supports (castings) has
hop is now in the process of painting the STAT
castings per government specifications before mounting on the
The actual mounting of the optical bridge in position
is scheduled to begin the first week of October.
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 22 Interferometer Assembly
Scheduled percentage of completion 39%
Actual percentage this date 32%
As reported last month, the mechanical components
for the interferometer assembly, consisting of the lasers, mirrors
and beamsplitters, have been received. These components have
been assembled in the
shop. STAT
?The electronic circuitry required for this assembly
has also been received and stored.
The assembly of the mechanical components to the
electronic circuitry will begin in the
-1 9:
shop in October. STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
fl
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
7
Task 23 Optics Drive Assembly
Scheduled percentage of completion 28%
Actual percentage this date 26%
The optics drive control system consists of 18 servo
and control chassis assemblies used to control the optics portion
of the Stereocomparator. Two servo amplifiers have been received
from-the- -vendor.
Since the optics drive mechanical assembly is an
integral part of the complete optics system, the assembly of the drives
will coincide with the delivery of the optics system.
In order to perform operational checks on the various control
system components, a breadboard simulation of each control loop will
be constructed from stock gears and mountings. All of the special motor-
tachometer assemblies have been received and tested, and most of the
special feedback and control potentiometers have been received. It is
expected that the simulation effort will allow preliminary servo loop
stabilization. This work will be completed in the early months of 1969.
-20-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
1;
I=r
1=1
^
t=i
7
7
Task 24 Image Analysis System
visited
Scheduled percentage of completion 9%
Actual percentage this date 9%
During the early part of September,
personnel
facilities to negotiate the subcontract covering the
fabrication of the Image Analysis System.
Modifications t
STAT
STAT
Specification No. 10, Image STAT
Analysis System Requirements for the Ultra-High Precision
Stereocomparator were mutually agreed upon by both
personnel.
A copy of the
-
Was sent
to the customer and subsequently approved. Three copies of the
subcontract were then sent to
We have been advised by
for their approval and signature.
that signed contract would be
returned to us the first week in October.
-21-
STAT
STAT
STAT
STAT
STAT
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 26 Digitizing Logic Subassembly
Scheduled percentage of completion 46%
Actual percentage this date 48%
The electronic chassis required f6i- the digitizing
logic subassembly are being bench tested and are nearly 'ready
for assembly into the system.
-22-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 27 Metric Readout
Scheduled percentage of completion 50%
Actual percentage this date 55%
? All of the components required for the metric readout
have been received.
The plugs required to interconnect the electronic
chassis for this system with other chassis in the control console
have been installed.
Bench tests of the chassis are being performed.
-23-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 28 Output Logic and Interfaces
Scheduled percentage of completion 27%
Actual percentage this date 45%
Work is in progress in the
shop on checking STAT
out the various electronic chassis required by this task. The
installation of the interconnecting plugs is also being accomplished
by the
shop.
The remaining chassis required for the interface
of the output logic with other systems are in the process of being
fabricated by an outside vendor. Delivery date scheduled for these
chassis is scheduled for the first week of November 1968.
-24-
STAT
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
, Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
171
1=1
1 1
; 1='
r-
t=1
Task 29 Cabling
Scheduled percentage of completion 32%
Actual percentage this date 37%
The percent progress of the cabling required to
interconnect the various electrical and electronic elements being
assembled in th
shop is as follows: STAT
Cabinet 4t1 78%
(Stage drives, film drive and
transport system)
Cabinet #2 17%
(Optics drive, interface with Image
Analysis System)
Cabinet #3 60%
(Metric readout, output logic and
? interfaces) -
Electrical arrangement (floor interconnection of
all cables) 19%
Control Console 23%
Display Panel 10%
Optical Bridge 5%
Stage Assembly 11%
-25-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
-71
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
a=j
t=,
1=1
Task 30 Control Console and Chair
Scheduled percentage of completion 48%
Actual percentage of completion 4.6%
The control console base and the two control
panels have been fabricated and assembled with the mechanical
components. Completion of the mechanical portion of this
assembly has been delayed due to the delay in the delivery of
the switch assembly (keyboard) and meters in the display panel.
The vendor has promised delivery of these components the first
week of October.
The electronic chassis constituting the power
supply for the console is still scheduled for completion on
November 1, 1968.
-26-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
I=1
7
t=zr
r-
r-
7
Task 32 Computer
Scheduled percentage of completion 78%
Actual percentage this date 95%
The DDP
516 computer
and has
has been received
been installed in the Clean
spent one week at the
from
Room. STAT
facilities STASTAT
Representatives from
Installing the
computer
and explaining
various facets of
the
machine's
operations to
personnel.
STAT
The
computer
has been
mounted on a temporary
rack and is being used by
personnel in the development STAT
and preparation of the computer
program.
-27--
,E Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 33 Electronic Racks and Control Cabinets
Scheduled percentage of completion 38%
Actual percentage this date 25%
The electronic cabinets to house the electronic
assemblies and cables have been re-scheduled for delivery the
middle of October.
For the purpose of storage, temporary electronic
racks have been installed in the Clean Room and the various
electronic assemblies will be mounted in these racks pending the
delivery of the cabinets ordered for this task.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 34 Utilities, Vacuum and Air Systems
1-3
Scheduled percentage of completion 25%
Actual percentage this date 27%
Fabrication of the utilities, vacuum and air
systems has been delayed due to the re-scheduling of the
utilities cabinet by the vendor.
The electrical components required to opbrate
the utilities are in the process of fabrication by an outside vendor.
During a recent field engineering trip made to monitor the vendor's
progress, it was learned that 90% of the components necessary for
the electrical control chassis have been received, with delivery of
the completed chassis scheduled for November 1, 1968.
The
hop is building the lamp operating hours
meter panel which will show elapsed operating time for each of the
main illumination and reticle arc lamps in the machine.
-29-
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 35 Vibration Absorption and Leveling
Scheduled percentage of completion 60%
Actual percentage this date 60%
The vibration absorption and leveling equipment
has been installed in the Clean Room awaiting the mounting of
the right and left granite bases.
The checkout of the vibration absorption and
leveling system by
the month of October.
has been re-scheduled for STAT
-30-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
fl
;71
1=i
r-
1:3
71 ?
Task 36 Overall Assembly
Scheduled percentage of completion 02%
Actual percentage this date 02%
Overall assembly of the Stereocomparator has
begun with the mounting of the right hand granite base to the
main frame.
-31-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Li Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 37 Radio Frequency Noise Suppression
Scheduled percentage of completion 0%
Actual percentage this date 0%
No work was performed on this task during
September 1968.
-32-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
1'n
t=i
r-
Task 38 Environmental Control
Scheduled percentage' of completion 38%
Actual Percentage this date 39%
The environmental control system at the customer's
facility was discussed with the customer during meetings held
this month. A copy of a preliminary Engineering Report of New
Clean Room Facility was given to
personnel for their use.
The conditions incorporated i
will be duplicated at the customer's facility.
-33-
Clean Room
STAT.
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
"
t=i
Task 39 Reliability Analysis
Scheduled percentage of completion 0%
Actual percentage this date 0%
No work was performed on this task during the
month of September 1968.
-34-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 40 Installation
Scheduled percentage of completion 0%
Actual percentage this date 0%
No work was performed on this task during the
month of September.
-35-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 42 Breadboards and Test Devices
Scheduled percentage of completion 5%
Actual percentage this date 9%
Breadboard test services are being performed on
the film drive and transport system. See Task 41d2.
'
- 36-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 43 Computer Programming and Services
Scheduled percentage of completion 20%
Actual percentage this date 21%
The subcontract covering the computer programming
for the Stereocomparator
returned t
has
been signed by and
S TAT
STAT
During
the month of September,
STAT
personnel has been utilizing the computer installed
in the Clean
Room to develop
and prepare
their programming data.
STAT
progress report for September 1968
is included as Appendix I.
-37--
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 44 Preacceptance Test in Fabrication Plant
Scheduled percentage of completion
Actual percentage this date 0%
No work was performed on this task during the
month of September.
-38-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 45 Acceptance Test in Fabrication Plant
Scheduled percentage of completion
Actual percentage this date
No work was performed on this task during
the month of September 1968.
-39-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
...?
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 46 Acceptance Test after Installation
Scheduled percentage of, Completion
Actual percentage this date
No work was performed on this task during
the month 'of September 1968.
-40-
.] Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
trtP
Task 47 Instruction Manual and Drawing Submittal
Scheduled percentage of completion
Actual percentage this date 0%
During the month of September,
initiated
plans for the writing and production of the Instruction Manual
for the Stereocomparator?
Drawings for various subassemblies have
been revised to "as built" status for inclusion in the Instruction
Manual.
-41--
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
S TAT
1E
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 48 Spare Parts List
Scheduled percentage of completion 0%
Actual percentage this date -0%
No work has been performed on this task
during the month of September 1968.
-42-
r
.771,
t=ifl
t=i
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Task 49 Operator Training
Scheduled percentage of completion 0%
Actual perdentage this date 0%
Plans are in process at this time for the
compilation of information to be used in the Operator Training
Manual.
-43-
t=i
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
nDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010003-5
STAT
September 19, 1968
PR-68-1070-2
Attention:
Gentlemen:
Enclosed is a monthly progress report for the period September 1 -
September 30, 1968, for the computer programming for the Stereoscan.
Very truly, yours,
CDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003j5
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5
fl
MONTHLY PROGRESS REPORT
September, 1968
This technical report is for the rePortinci period from September 1 to
September 30, 1968 according to Speci-
fication number DB.-1001 (as modified).
1. This month the f011owirg activities have taken place on the project:
the examination of the "REORIENT" procedure, familiarization with
the DDP 516-computer, the creation of detailed flow charts for one
of the executive programs, and the coding of one of the Fortran sub?
-
programs. Approximately 15% of the work has been completed.
2. Next month detailed flow charts for the remaining subprograms will
be generated and all Fortran subprograms will be coded. Modifica-
tions to the released computer software will be undertaken to facil-
itate program development. The analysis of the "NO CAMERA DATA"
case will be [completed.
3. At this time there exist no pending, unresolved technical problems.
4. There are no pending, unresolved contractual problems.
STAT
5. It was orally agreed that a new filter would be designed to handle the
r probable cross-talk from the output of the correlator. A preliminary
model has been designed by and will be integrated this STAT
month.
rn
6. No changes or agreements have been made requiring approval of the
contracting officer.
7. No other unresolved matters are known to exist.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5