STATUS REPORT FOR PERIOD 1 SEPT. THROUGH 30 SEPT. 1968 SUBMITTED UNDER CONTRACT TO U.S. GOVERNMENT CONTRACT NO. (SANITIZED)

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79B00873A001500010003-5
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
53
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 17, 2012
Sequence Number: 
3
Case Number: 
Publication Date: 
October 4, 1968
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79B00873A001500010003-5.pdf1.17 MB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 I I V -3 4 ri\cts4. ER'ri STAT Lem - Declassified in Part -Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 LT71 1 STATUS REPORT for Period 1 Se it. through 30 Sei_pl.,_11?_b Submitted under Contract to U. S. Government File No. 11038 STAT STAT. 1,?; Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 L Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 F1' 7 tJ 1 fl Li fl 7:1 This document is presented as the Monthly Status Report under contract to the Ti. S. Government, The report period represented herein covers the period of 1 September through 30 September 1968. STAT STA STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 INDEX Page' Program Status Summary 1 Task 01 Statements of Work, Specifications, Report Preparation 2 Task 02 Scheduling and Planning 3 Task 03 Test and Inspection Procedures 4 Task 04 Management, Administration and Supervision 5 Task 05 Meetings 6 Task 06 Facilities Requirements Task 07 Main Frame and Structural Elements 8 Task 08 Skin 9 Task 09 Granite and Ways Assembly for Stages 10 Task 10 Air Bearings 11 Task 11 Stage Drives 12 Task 12 Film Drive and Transport System 13 Task 13 Film Platen and Film Clamping 14 Task 14 Film Cooling 15 Tasks 16, 17,18 Optics - Viewing Optics, Viewing Illumination, Reticle Projector and Illumination 16 Task 20 General Platen Illumination 0 17 Task 21 Optical Bridge and Supports 18 Task 22 Interferometer Assembly 19 Task 23 Optics Drive Assembly 20 Task 24 Image Analysis System 21 Task 26 Digitizing Logic Subassembly 22 Task 27 Metric Readout 23 Task 28 Output Logic and Interfaces 24 Task 29 Cabling 25 Task 30 Control Console and Chair 26' Task 32 Computer 27 ' Task 33 Electronic Racks and Control Cabinets 28 Li Declassified in Part- Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 34 Utilities, Vacuum and Air Systems 29 Task 35 Vibration Absorption and Leveling 30 Task 36 Overall Assembly 31 Task 37 Radio Frequency Noise Suppression 32 Task 38 Environmental Control S 33 .Task 39 Reliability Analysis 34 Task 40 Installation S 35 Task 42 Breadboards and Test Services 36 Task 43 Computer Programming and Services 37 Task 44 Preacceptance Test in Fabrication Plant 38 Task 45 Acceptance Test in Fabrication Plant 39 Task 46 Acceptance Test after Installation 40 Task 47 Instruction Manual and Drawing Submittal 41 Task 48 Spare Parts List S. 42 Task 49 Operator Training 43 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 1 APPENDICES i 1 I 11 Progress Report, ? : STAT. . eptem er 968 Appendix I I ii 1 IDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 iii 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 PROGRAM STATUS Summary as of September 30, 1968 Scheduled percentage of program completed - 28.5% Actual percentage completed this date - 28.0% Overall program progress, with the exception of several minor adjustments, has been proceeding according to plan. Several ,vendors have reported that they anticipate some delay in their delivery schedules which necessitated our making some revision to detailed plan. These revisions, however, are of a work-around nature which do not affect the total program. As the individual task reports show, inspection and checkout of electronic chassis is proceeding normally, and in-plant production is on schedule. We anticipate no major problems in the immediate future. Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 01 Statements of Work, Specifications, Report Preparation Scheduled percentage of completion 27% Actual percentage of completion 27% Subcontractor's progress reports are being received and transmitted with each monthly status report submitted by These status reports, which are included under the appropriate task headings, indicate that schedule requirements are being met. Any revision to, or additional specifications which may be required, will be prepared and submitted immediately for approval. STAT Declassified in Part- Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 -7)? Task 02 Scheduling and Planning n ? Scheduled percentage of completion 27% Actual percentage of completion 27% Detailed schedules for machine assembly, mounting the optical bridge and for shipment of the bridge to th sub- contractor have been implemented. These schedules incorporate the latest information from vendors and suppliers, and are designed to meet the subcontractor's requirement that the optical bridge be available in December or before. Schedules for the test programs are currently being detailed and will be issued in November. -3- S TAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 03 Test and Inspection Procedures ? Scheduled percentage of completion 20% Actual percentage of completion 17% Test procedures are being written as required for inspection and test of completed subassemblies/assemblies. Many of these procedures will be incorporated into the overall test procedure which is scheduled to be written during the early part of 1969. -4- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 nI Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 77. Task 04 Management, Administration and Supervision Scheduled percentage of completion 27% Actual percentage of completion 27% During this report period, visited with sponsor personnel at the installation site to review and resolve technical situations relative to computer programming and associated problems. In addition, STAT attended a meeting at the STAT installation site to resolve various questions pertaining to layout and installation, and to coordinate future interface work. This meeting resulted in mutual agreement on the solution to these questions, and our plans for installation will be formulated on this agreement. Other management effort during this report period has been routine, with no major problems other than those reported in the individual tasks. -5- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 fl L.J Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 05 Meetings Scheduled percentage of completion 27% Actual percentage of completion 27% There were no formal meetings scheduled for this report period. However, Program Manager, and Technical Director, met with customer representa- tives to discuss several items of interest which were disclosed in the facilities design of the installation site. This meeting and the results of same are discussed under Task 04 - Management, Administration and Supervision. -6- STAT -STAT Declassified in Part -Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 06 Facilities Requirements Scheduled percentage of completion 50% Actual percentage of completion 45% During this report period, the machine pad has been poured and the layout of air conditioning equipment on this pad has been prepared and approved. Purchase orders have been placed and satisfactory delivery dates obtained for all required Clean Room equipment. Detailed schedules for Clean Room start-up have also been prepared and approved. -7- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 fI I Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 07 Main Frame and Structural Elements Scheduled percentage of completion 98% Actual percentage of completion 93% As reported last month, the main frame which is the basis for the Stereocomparator has been installed in the Clean Room. Subassemblies, as they are completed, will be mounted to this structure. Additional work on this task will include the removal of the optical bridge support for transfer to the optics subcontractor for installation of the optios. Upon return of the assembly to additional work will be required to remount the bridge to the main frame. STAT 0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 I Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 i=1 Task 08 Skin Scheduled percentage of completion 20% Actual percentage this date 18% The aluminum skin which will form the protective covering for the various subassemblies of the Stereocomparator is being fabricated by th hop. STAT During the month of September, portions of the skin which will house the utilities and electronics on the rear of the machine were fabricated. Fabrication of the skin is scheduled to coincide with the completion of the various subassemblies. -9- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 :7) Le Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 7-1 AE fl Task 09 Granite and Ways Assembly for Stages Scheduled percentage of completion 78% Actual percentage this date 72% The right hand granite base, one of the .twelve granite sections required by this task, was received and installed during the month of September. The holes and brass plugs necessary for the mounting of subassemblies onto the granite were drilled and tapped by the shop. Because of production difficulties, it was necessary for the vendor to reschedule the left hand granite base for the week of October 4, with remaining sections to be delivered the week of October 2 1 . -10- STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 rn Lj Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 ^ Task 10 Air Bearings Scheduled percentage of completion 50% Actual percentage this date 50% The first portion of this task, fabrication of the air bearings used to support and guide the two stages, was completed in June. Assembly and installation of the air bearings which consitutes the second half of this task is scheduled to coincide with the mounting of the stages to the granite bases. We anticipate this work to begin during the next month. -11- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 11 Stage Drives Scheduled percentage of completion 51% Actual percentage this date 44% A portion of the mechanical components of the stage drives has been assembled. The work done so far includes assembling the "Y" axis stage drive to the castings and the assembly of the "X" axis stage drive to the drive motor support. A total of 12 servo and control chassis are required for this task. These consist of: 4 - servo amplifiers 4 - 23-Bit D/A converters 2 - stage test chassis used 2 - stage limit relay interlock chassis (safety devices to control stages) All of these chassis have been received from the vendor with the exception of one stage test chassis which is scheduled for delivery the first week in October. Approximately 50% of the chassis received have been bench tested in th shop. The shop is in the process of fabricating and assemblying inter-connecting plugs on the chassis. Completion of this work is expected to be within two weeks. -12- S TAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 -1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 L.7 Li Li r- t.7 :71 Task 12 Film Drive and Transport System Scheduled percentage of completion 50% Actual completion this date 42% The film drive assemblies which were fabricated in June have now been released from storage and assembled with the platen frame. Breadboard test services have been set up, connecting the film drive to a substitute electronic control system for checkout. A field engineering trip was made to the vendor who is supplying the various electronic chassis required for the film drive assembly. Although all of the chassis have been essentially completed, was not able to accept them for delivery because of minor corrections which were necessary. Another field engineering trip is planned for the first week in October, and it is expected that the chassis can be released for delivery at that time. As soon as these are received, bench tests will be set up for chassis checkout performance. - 1 3- S TAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 13 Film Platen and Film Clamping Scheduled percentage of completion 27% Actual percentage this date 12% The film platen and clamp were released from storage for trial assembly. The substitute glass platen which was ordered for use in the trial assembly has been received and installed. The vacuum clamp has been installed to the platen and checkout of this subassembly will begin this month. -14- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 14 Film Cooling Scheduled percentage of completion 18% Actual percentage this date 16% During the recent meeting with the customer, discussions were held on the air supply and refrigeration for the film cooling system. As soon as the requirements for this system are resolved, ill incorporate these specifications into the film cooling system. -15- 0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 STAT 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 r- 711 r- Tasks 16, 17, and 18 Viewing Optics, Viewing Illumination Reticle Projector and Illumination Scheduled percentage of completion 16% Actual percentage this date 14% The monitoring trip to optical sub- contractor performing the above tasks, was postponed until the month of October. It was felt that inasmuch as STAT had STAT just returned to work the first of September following their annual one-month shutdown, it would be more effective to check their progress after they had resumed operation for a month or more. One of the major points which STAT lana to discuss Li with is the interface of the optical system with the other STAT subassemblies of the Stereocomparator. A list of details concerning this interface was prepared and sent to personnel in October. for discussion with STAT STAT -16-- 1 ? Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 pi Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 1 7- 7 Task 20 General Platen Illumination 7 Scheduled percentage of completion 45% ?kJ Actual percentage this date 41% As reported previously, the platen illumination system has been fabricated, parts inspected, and is in storage awaiting final assembly. The electrical chassis required for this system has been completed by th hop with the exception of the installation of two RPI-proof, high voltage connectors. Delivery of these connectors is expected within the next month at which time the shop will complete this assembly. -17- S TAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 ' been received. Th granite bases. Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 21 Optical Bridge and Supports Scheduled percentage of completion 78% Actual percentage this date 69% The optical bridge, consisting of the center bridge, right and left hand bridges, and optical supports (castings) has hop is now in the process of painting the STAT castings per government specifications before mounting on the The actual mounting of the optical bridge in position is scheduled to begin the first week of October. EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 22 Interferometer Assembly Scheduled percentage of completion 39% Actual percentage this date 32% As reported last month, the mechanical components for the interferometer assembly, consisting of the lasers, mirrors and beamsplitters, have been received. These components have been assembled in the shop. STAT ?The electronic circuitry required for this assembly has also been received and stored. The assembly of the mechanical components to the electronic circuitry will begin in the -1 9: shop in October. STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 fl Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 7 Task 23 Optics Drive Assembly Scheduled percentage of completion 28% Actual percentage this date 26% The optics drive control system consists of 18 servo and control chassis assemblies used to control the optics portion of the Stereocomparator. Two servo amplifiers have been received from-the- -vendor. Since the optics drive mechanical assembly is an integral part of the complete optics system, the assembly of the drives will coincide with the delivery of the optics system. In order to perform operational checks on the various control system components, a breadboard simulation of each control loop will be constructed from stock gears and mountings. All of the special motor- tachometer assemblies have been received and tested, and most of the special feedback and control potentiometers have been received. It is expected that the simulation effort will allow preliminary servo loop stabilization. This work will be completed in the early months of 1969. -20- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 1; I=r 1=1 ^ t=i 7 7 Task 24 Image Analysis System visited Scheduled percentage of completion 9% Actual percentage this date 9% During the early part of September, personnel facilities to negotiate the subcontract covering the fabrication of the Image Analysis System. Modifications t STAT STAT Specification No. 10, Image STAT Analysis System Requirements for the Ultra-High Precision Stereocomparator were mutually agreed upon by both personnel. A copy of the - Was sent to the customer and subsequently approved. Three copies of the subcontract were then sent to We have been advised by for their approval and signature. that signed contract would be returned to us the first week in October. -21- STAT STAT STAT STAT STAT EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 26 Digitizing Logic Subassembly Scheduled percentage of completion 46% Actual percentage this date 48% The electronic chassis required f6i- the digitizing logic subassembly are being bench tested and are nearly 'ready for assembly into the system. -22- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 27 Metric Readout Scheduled percentage of completion 50% Actual percentage this date 55% ? All of the components required for the metric readout have been received. The plugs required to interconnect the electronic chassis for this system with other chassis in the control console have been installed. Bench tests of the chassis are being performed. -23- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 28 Output Logic and Interfaces Scheduled percentage of completion 27% Actual percentage this date 45% Work is in progress in the shop on checking STAT out the various electronic chassis required by this task. The installation of the interconnecting plugs is also being accomplished by the shop. The remaining chassis required for the interface of the output logic with other systems are in the process of being fabricated by an outside vendor. Delivery date scheduled for these chassis is scheduled for the first week of November 1968. -24- STAT EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 , Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 171 1=1 1 1 ; 1=' r- t=1 Task 29 Cabling Scheduled percentage of completion 32% Actual percentage this date 37% The percent progress of the cabling required to interconnect the various electrical and electronic elements being assembled in th shop is as follows: STAT Cabinet 4t1 78% (Stage drives, film drive and transport system) Cabinet #2 17% (Optics drive, interface with Image Analysis System) Cabinet #3 60% (Metric readout, output logic and ? interfaces) - Electrical arrangement (floor interconnection of all cables) 19% Control Console 23% Display Panel 10% Optical Bridge 5% Stage Assembly 11% -25- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 -71 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 a=j t=, 1=1 Task 30 Control Console and Chair Scheduled percentage of completion 48% Actual percentage of completion 4.6% The control console base and the two control panels have been fabricated and assembled with the mechanical components. Completion of the mechanical portion of this assembly has been delayed due to the delay in the delivery of the switch assembly (keyboard) and meters in the display panel. The vendor has promised delivery of these components the first week of October. The electronic chassis constituting the power supply for the console is still scheduled for completion on November 1, 1968. -26- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 I=1 7 t=zr r- r- 7 Task 32 Computer Scheduled percentage of completion 78% Actual percentage this date 95% The DDP 516 computer and has has been received been installed in the Clean spent one week at the from Room. STAT facilities STASTAT Representatives from Installing the computer and explaining various facets of the machine's operations to personnel. STAT The computer has been mounted on a temporary rack and is being used by personnel in the development STAT and preparation of the computer program. -27-- ,E Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 33 Electronic Racks and Control Cabinets Scheduled percentage of completion 38% Actual percentage this date 25% The electronic cabinets to house the electronic assemblies and cables have been re-scheduled for delivery the middle of October. For the purpose of storage, temporary electronic racks have been installed in the Clean Room and the various electronic assemblies will be mounted in these racks pending the delivery of the cabinets ordered for this task. Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 34 Utilities, Vacuum and Air Systems 1-3 Scheduled percentage of completion 25% Actual percentage this date 27% Fabrication of the utilities, vacuum and air systems has been delayed due to the re-scheduling of the utilities cabinet by the vendor. The electrical components required to opbrate the utilities are in the process of fabrication by an outside vendor. During a recent field engineering trip made to monitor the vendor's progress, it was learned that 90% of the components necessary for the electrical control chassis have been received, with delivery of the completed chassis scheduled for November 1, 1968. The hop is building the lamp operating hours meter panel which will show elapsed operating time for each of the main illumination and reticle arc lamps in the machine. -29- STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 35 Vibration Absorption and Leveling Scheduled percentage of completion 60% Actual percentage this date 60% The vibration absorption and leveling equipment has been installed in the Clean Room awaiting the mounting of the right and left granite bases. The checkout of the vibration absorption and leveling system by the month of October. has been re-scheduled for STAT -30- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 fl ;71 1=i r- 1:3 71 ? Task 36 Overall Assembly Scheduled percentage of completion 02% Actual percentage this date 02% Overall assembly of the Stereocomparator has begun with the mounting of the right hand granite base to the main frame. -31- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Li Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 37 Radio Frequency Noise Suppression Scheduled percentage of completion 0% Actual percentage this date 0% No work was performed on this task during September 1968. -32- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 1'n t=i r- Task 38 Environmental Control Scheduled percentage' of completion 38% Actual Percentage this date 39% The environmental control system at the customer's facility was discussed with the customer during meetings held this month. A copy of a preliminary Engineering Report of New Clean Room Facility was given to personnel for their use. The conditions incorporated i will be duplicated at the customer's facility. -33- Clean Room STAT. STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 n Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 " t=i Task 39 Reliability Analysis Scheduled percentage of completion 0% Actual percentage this date 0% No work was performed on this task during the month of September 1968. -34- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 40 Installation Scheduled percentage of completion 0% Actual percentage this date 0% No work was performed on this task during the month of September. -35- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 42 Breadboards and Test Devices Scheduled percentage of completion 5% Actual percentage this date 9% Breadboard test services are being performed on the film drive and transport system. See Task 41d2. ' - 36- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 43 Computer Programming and Services Scheduled percentage of completion 20% Actual percentage this date 21% The subcontract covering the computer programming for the Stereocomparator returned t has been signed by and S TAT STAT During the month of September, STAT personnel has been utilizing the computer installed in the Clean Room to develop and prepare their programming data. STAT progress report for September 1968 is included as Appendix I. -37-- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 44 Preacceptance Test in Fabrication Plant Scheduled percentage of completion Actual percentage this date 0% No work was performed on this task during the month of September. -38- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 45 Acceptance Test in Fabrication Plant Scheduled percentage of completion Actual percentage this date No work was performed on this task during the month of September 1968. -39- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 ...? Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 46 Acceptance Test after Installation Scheduled percentage of, Completion Actual percentage this date No work was performed on this task during the month 'of September 1968. -40- .] Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 trtP Task 47 Instruction Manual and Drawing Submittal Scheduled percentage of completion Actual percentage this date 0% During the month of September, initiated plans for the writing and production of the Instruction Manual for the Stereocomparator? Drawings for various subassemblies have been revised to "as built" status for inclusion in the Instruction Manual. -41-- Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 S TAT 1E Declassified in Part - Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 48 Spare Parts List Scheduled percentage of completion 0% Actual percentage this date -0% No work has been performed on this task during the month of September 1968. -42- r .771, t=ifl t=i Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Task 49 Operator Training Scheduled percentage of completion 0% Actual perdentage this date 0% Plans are in process at this time for the compilation of information to be used in the Operator Training Manual. -43- t=i EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 nDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17 : CIA-RDP79B00873A001500010003-5 STAT September 19, 1968 PR-68-1070-2 Attention: Gentlemen: Enclosed is a monthly progress report for the period September 1 - September 30, 1968, for the computer programming for the Stereoscan. Very truly, yours, CDeclassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003j5 Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 fl MONTHLY PROGRESS REPORT September, 1968 This technical report is for the rePortinci period from September 1 to September 30, 1968 according to Speci- fication number DB.-1001 (as modified). 1. This month the f011owirg activities have taken place on the project: the examination of the "REORIENT" procedure, familiarization with the DDP 516-computer, the creation of detailed flow charts for one of the executive programs, and the coding of one of the Fortran sub? - programs. Approximately 15% of the work has been completed. 2. Next month detailed flow charts for the remaining subprograms will be generated and all Fortran subprograms will be coded. Modifica- tions to the released computer software will be undertaken to facil- itate program development. The analysis of the "NO CAMERA DATA" case will be [completed. 3. At this time there exist no pending, unresolved technical problems. 4. There are no pending, unresolved contractual problems. STAT 5. It was orally agreed that a new filter would be designed to handle the r probable cross-talk from the output of the correlator. A preliminary model has been designed by and will be integrated this STAT month. rn 6. No changes or agreements have been made requiring approval of the contracting officer. 7. No other unresolved matters are known to exist. Declassified in Part - Sanitized Copy Approved for Release 2012/08/17: CIA-RDP79B00873A001500010003-5 rs[i