STATUS REPORT SEPTEMBER 1969

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79B00873A001400010010-8
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
54
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 24, 2012
Sequence Number: 
10
Case Number: 
Publication Date: 
October 3, 1969
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79B00873A001400010010-8.pdf1.08 MB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CI RDP79B00873A001400010010-8 0 0 0 0 a 0 r1119 944b 0 1103 STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 In f ,~ 71 STATUS REPORT for Period 1 SEPTEMBER through 30 SEPTEMBER 1969 U.S. Government STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 This document is presented as the Monthly Status Report under. Contract to the U. S. The report period represented herein covers the period 1 September through 30 September, 1969. Government, STAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 1 11 ~ 11 INDEX Status Summary Statements of Work, Specifications, Report Preparation Scheduling and Planning Test and Inspection Procedures Management, Administration and Meetings Facilities Requirements Main Frame Skin Supervision Granite and Ways Assembly for Stages Air Bearings Stage Drives Film Drives Film Platen Film Cooling Tasks 16, 17 & 18 Task 20 Task 21 Task 22 Task 23 Task 24 Task 26 Task 27 Task 28 Task 29 Task 30 Task 32 Task 33 Progra m Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Task 9 Task 10 Task 11 Task 12 Task 13 Task 14 Optics General Platen Illumination Optical Bridge Interferometer Assembly Optics Drives Image Analysis System Digitizing Logic Metric Readout Output Logic and Interface Cabling - Control Console and Chair Computer Electronic Racks and Control Cabinets Page 1 T1-1 T2-1 T3-1 T4 - 1 T5-1&-2 T6 - 1 T7 - 1 T8-1 T9 - 1 T10 - 1 T1.1-1 T12-1 T13 - 1 T14-1 T16, 17 & 18-3. T20-1 T21-1 T22-1 T23 - 1 T24 - 1 T26-1 T27* - 1 T28-1 T29 - 1 T30-1 T32 - 1 T33-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 L- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Ell Index (cont'd) Page Task 34 Utilities, Vacuum and Air Systems T34-1 Task 35 Vibration Absorption and Leveling T35 - 1 Task 36 Overall Assembly T3 6 - 1 Task 37 Electrical Noise Suppression T37 1 Task 38 Environmental Control T38-1 Task 39 Reliability Analysis T39 - 1 Task 41 Tape Punch and Reader Assembly T41-1 Task 42 Breadboards and Test Services T42-1 Task 43 Computer Programming and Services T43 - 1 Task 47 Instruction Manuals T47 - 1 Task 48 Spare Parts List T48-1 Task 49 Operator Training: T49-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Progress Report - for period ending August 31, 1969 Appendix I Revised PERT Chart Appendix II Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 STAT L Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 PROGRAM SUMMARY Scheduled Percentage of Completion 79.2% Actual Percentage this Date 71.7% During September a monitoring visit was made to LJ LI by the Contracting Officer's Technical Representative for the purpose of reviewing the program status. The performance of the Stereocomparator fabrication program is proceeding normally and with no schedule changes affecting the critical path. . A visit was made to by the customer's Technical Representative concerned with instrument maintenance. During this visit it was recommended that a minimum number of spare parts items requiring a long lead for procurement be ordered as soon as possible. This was specially with reference to certain optical parts subject to catastrophic failure. During September, the (Image Analysis equipment subcontractor), slipped their acceptance testing commencement schedule from September 8, 1969,. to October 6, 1969, and then to October 27, 1969. This is a very unsatisfactory situation, however the overall schedule of the Stereocomparator is not affected.at this time. Strong representation is being made to attempt to arrive at a firm schedule for their work. -1- STAT STAT STAT in an STAT - Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 F I C STATEMENT OF WORK, SPECIFICATIONS, REPORT PREPARATION Scheduled percentage of completion 840/, Actual percentage this date 84% No new specifications were developed or issued during this report period. Monthly reports from our subcontractors are incorporated into this document under appropriate task headings or in the Appendix. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 L. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 P : El SCHEDULING AND PLANNING Scheduled percentage of completion 84% Actual percentage this date 84% A revised PERT chart has been prepared showing the schedules for the various tasks that are anticipated through July, 1970, and is included as Appendix II to this report. There are no fundamental changes in the overall program and the completion date remains the same. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 L TEST AND INSPECTION PROCEDURES Scheduled percentage of completion 74% Actual percentage this date 58% Work is continuing on the tests and procedures related to the optical subassemblies. '~m Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 MANAGEMENT, ADMINISTRATION AND SUPERVISION Scheduled percentage of completion 84% Actual percentage this date 84% Management and administrative functions are proceeding normally with the work effort directed primarily to the coordination requirements of the optical subcontract. ~- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 -o Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Scheduled percentage of completion 84% Actual percentage this date 84% A meeting was held with the customer, representative during the week of September 8th, during which certain details of the output interface. to the central computer facility were discussed and clarified. In particular, the logic voltage levels and modes of operation were discussed and the transmission line characteristics between the Stereocomparator equipment and the central computer facility were established. The Teletype interface to the customer's equipment was also discussed, (the ASR 35 Teletype unit incorporated in the Stereocomparator is shared between the Stereocomparator computer and the central computer facility). The logic levels and mode of operation (full duplex) were established as well as the transmission line characteristics. It was found that the Teletype unit purchased with the Honeywell DDP 516 computer used in the Stereocomparator did not include a n"ALT MODE" key. The Stereocomparator system does not use this particular key although the customer data transmission system does and it was T5-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 if agreed that, since the customer has the necessary parts for installation of this key available in their plant facility, they would make the installation after delivery of the instrument to the customer's site. E G E F e I E 6 E Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 TASK 6 FACILITIES REQUIREMENTS g Scheduled percentage of completion 98% Actual percentage this date 92% An analysis of the clean room system has demonstrated that the electric heaters, for reheating and temperature control of the air conditioning system, were inadequately sized. Larger heaters have been ordered to correct this A high sensitivity recording thermistor thermometer has been purchased for use in determining the stability of the clean room air temperature. This will allow[::]to optimize the ambient STAT air conditions for the Stereocomparator, with particular reference to the testing program. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 E Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 E TASK 7 Scheduled percentage of completion 98% Actual percentage this date 93% The main frame for the Stereocomparator was completed in September, 1968. No additional work will be scheduled for this, Task until the return of the Optical. Bridge by the optics sub- contractor. T7-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 TASK 8 SKIN Scheduled percentage of completion 78% Actual percentage this date 30% The fabrication of the external skin sections has- been completed to the point where the total assembly is needed in order to finish this Task. No further work is anticipated until the Stereo- comparator has been completely assembled.. ~-l Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 GRANITE AND WAYS ASSEMBLY FOR STAGE Scheduled percentage of completion 98% Actual percentage this date No further work is anticipated on this Task at Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 AIR BEARINGS Scheduled percentage of completion Actual percentage this date 96% E The original air bearing filters leaked high pressure air to the atmosphere and suffered frequent rupture of the 'filter New filters of (design and fabrication have been STAT installed and on the basis of the limited experience with their use, appear to be fully satisfactory. T10-1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Scheduled percentage of completion 98% Actual percentage this date 78% Ell The installation of the new air line filters (Task 10) has been completed and preliminary testing of the stage drive assemblies has begun. Phasing of the various safety limit switches has been accomplished although it was found necessary to mechanically relocate some of these limit switch assemblies due to interferences at the extreme limits of stage travel'. The 23-bit digital-to-analog converters, which are used to convert the computer signals into voltages suitable for driving the servo amplifiers, have been tested under-computer control and are satisfactory. Measurements of the breakaway torque and running friction have commenced; also, the design of the velocity feed back loop is proceeding. d Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 E r 6 TASK 12 FILM DRIVE AND TRANSPORT SYS''EM Scheduled percentage of completion 98% Actual percentage this date 70% Testing of the film drive and transport system is continuing and no significant difficulties have appeared. It was found that the limited resolution of the joy- stick film slewing control does not permit operation of the film transport at sufficiently low velocities to allow proper film positioning on the platen. This problem is under review. Final chassis cleanup and testing has been per- formed and the adjustment of the system with the pneumatic lift-off and vacuum clamping apparatus will begin shortly. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 E E Ell TASK 13 FILM PLATEN AND FILM CLAMPING Scheduled percentage of completion , 98% Actual percentage this date 92% Checkout and test of the system is proceeding. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 FILM COOLING Scheduled percentage of completion 98% Actual percentage this date 60% There will be no further work on Film Cooling until the optical system arrives. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 TASKS 16, 17 & 18 VIEWING OPTICS, VIEWING ILLUMINATION, RETICLE PROJECTOR and ILLUMINATION Scheduled percentage of completion 97.5% Actual percentage this date Correspondence with the optical vendor has indicated that their optical subassembly tests are showing success in meeting and exceeding the expected performance specifications. They are presently starting optical tests with individual subassemblies combined into systems. =is presently reviewing the electromechanical interface with the optical system to be sure that the final assembly will be properly coordinated. T16, 17&18-1 STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 TASK 20 Scheduled percentage of completion 98% Actual percentage this date 86% The platen illumination equipment has been installed on the Stereacomparator and has been tested. The units performed satisfactorily under the specified range of illumination and appear to cause no radio- frequency inter- ference in the system. This Task is therefore substantially completed. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 6 I 11 I fi E TASK 21 OPTICAL BRIDGE AND SUPPORTS Scheduled percentage of completion. 98% Actual percentage this date 98% No further work is scheduled until receipt of the optical bridge and the optics from subcontractor. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 INTERFEROMETER ASSEMBLY Scheduled percentage of completion 960/, Actual percentage this date Tests have begun with the Interferometer system although definite measurements cannot be made until the clean room temperature control system is fully satisfactory. The optical wedge units in the photo field effect transistor assemblies, which had corroded, have been repolished and coated and are ready for use. - It has been found that some wiring problems exist in the cable assemblies between the laser power suppliers and the laser plasm tube assemblies proper. In particular, a 120 hertz spike has been found in the servo correction feedback signal which is used to control the frequency stabilizing system for the laser cavity. Also, some difficulty has been found in getting one of the lasers to operate reliably. These problems are being investigated and will be M L resolved as soon as possible. T22 - 1 STAT P Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 OPTICS, DRIVE ASSEMBLY Scheduled percentage of completion 98% Actual percentage this date 90% Phasing of the manual operator controls is complete and checkout of the slaved servo systems (e.g, reticle projector system) is proceeding. All components in this system are performing satisfactorily . The.automatic illumination control system design is complete and fabrication of the modified circuit boards is nearly finished. Testing of these assemblies is being held up pending El. receipt of certain components for the circuit boards. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Scheduled percentage of completion 88% Actual percentage this date 95% Progress on this task is detailed in Progress STAT Report for the period ending August 31, 1969, which is included as Appendix I to this report. has suffered several setbacks in their checkout STAT effort. This has required revision to circuit boards and procurement of additional parts. Presently,= has rescheduled their acceptance STAT tests for October 27, 1969. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 TASK 2 6 DIGITIZING LOGIC SUBASSEMBLY Scheduled percentage of completion 98% Actual percentage this date 9,6% The checkout of the individual subsystem is essentially complete. Further work is reported in Task 36, Overall Assembly. Please refer to this Task. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Scheduled percentage of completion 98% Actual percentage this date 95% E The checkout of the individual subsystem is essentially complete. Further work is reported in Task 36, Overall Assembly. Please refer to this Task. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 OUTPUT LOGIC AND INTERFACE Scheduled percentage of completion 98% Actual percentage this date 98% The checkout of the individual subsystem is essentially complete. Further work is reported in Task 36, Overall Assembly. Please refer to this Task. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 CABLING Scheduled percentage of completion 98% Actual percentage this date 97% Modification of the harnesses for the stage drives, in order to accommodate the range of motions required, has occurred during this report period. Several additional-cables are being fabricated for shipment to~ for their optical testing programs. STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Scheduled percentage of completion 98% Actual percentage of completion 90% Final checkout of the function and readout push- buttons is complete. The track ball circuitry has been checked out and is operating satisfactorily and the joystick control has been adjusted for proper operation. The only remaining work to be done in the control console is connected with the film drive joysticks (see Task 12) Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 H TASK 3-2 Scheduled percentage of completion - 98% Actual percentage this date 95% The modifications to the computer circuitry,. made and described in the August, 1969, report, have been found entirely satisfactory and no further revisions to the computer are anticipated at this time. ''.L Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 ELECTRONIC RACKS AND CONTROL CABINETS Scheduled percentage of completion 98% Actual percentage this date Certain changes in the Electronics Cabinet #3 (digital equipment) wiring are continuing in order to reduce noise and transmission losses in the digital logic systems. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24 CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 UTILITIES, VACUUM AND AIR SYSTEMS Scheduled percentage of completion 90% Actual percentage this date 90% 73 The testing of the valves, pressure switches, and air control solenoids is almost complete. - Adjustment of the trip points for the various alarm (failure) sensors is being carried out as the associated systems become operational. T34 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 fl III 171 VIBRATION ABSORPTION AND LEVELING Scheduled percentage of completion 930/, Actual percentage this date 85% No further work is scheduled for this Task until the Optical Bridge is received from At this time, full STAT tests of response time and stage deflection will be conducted. This delay is necessitated by the requirement for full weight loading of the stages during these tests. T35-1 I- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 OVERALL ASSEMBLY Scheduled percentage of completion 76% Actual percentage this date 50% Systematic checkout of the interface functions is Through modifications to the ground bussing system, described in the August, 1969, report, it has been found 'Ppssible to reduce the noise levels in the system to within acceptable levels for proper operation. Propagation delays which were effecting the performa1nce of the digital logic, as described in the August, 1969, report, have been overcome and the interface system appears to be operating entirely satisfactorily. Work is now proceeding on the digital logic associated with the manual modes of operation of the Stereocomparator. T36 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 P r73 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 ELECTRICAL NOISE SUPPRESSION Scheduled percentage of completion Actual percentage this date 50% E El I In Noise generation in terms of internally generated unwanted signals, appears as crosstalk and spurious switching signals. This noise is being systematically eliminated and the work is reported in other Tasks, (32, 29, etc.). - 1 T37 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 E, Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Scheduled percentage of completion. 98% Actual percentage this date 92% L, E The temperature sensors (microthermistors) have been selected for the film cooling air temperature control. The customer's environmental air conditioning consultant has been advised of the choice and he is now in a position to procure the temperature control system for the film cooling air supply. T38-l Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 TASK 39 RELIABILITY ANALYSIS Scheduled percentage of completion 34% Actual percentage this date 20% .There is no formal reliability analysis planned for the project. The system testing program presently under way has shown that the component and subassembly reliability actually achieved is fully compatible with the needs of the program. ? Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Scheduled percentage of completion 70% Actual percentage this date 70% The high speed tape punch and reader assembly is operating satisfactorily with the computer system in the Stereo- comparator system. It was found necessary, during the last reporting period, to resharpen the high speed punch dies which had become dulled through use. T41-1 ? Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 TASK 42 Scheduled percentage of completion 90% Actual percentage this date 65% Design work on a test panel to be used in the optical acceptance tests at has begun. Construction and ship- STAT ment of this test panel, servo amplifier, and associated cables will be completed as rapidly as possible. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 rMj Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 TASK 43 COMPUTER PROGRAMMING AND SERVICES Scheduled percentage of completion 97'% Actual percentage this date 80% The programming effort has been terminated until about November 1, 1969, to permit completion of the computer interface checkout and integration with the overall Stereocomparator electronic assembly. E T43 - 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 TASK 4 7 INSTRUCTION MANUAL AND DRAWING SUBMITTAL Scheduled percentage of completion 79% Actual percentage this date 32% The revision of the design drawings to cover the "as built" status of the various subassemblies of the Stereo- comparator is continuing. V Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 TASK 48 Scheduled percentage of completion 39% Actual percentage this date 65% A short list of spare parts has been prepared representing the most critical and longest lead items. The customer has indicated these critical items will be ordered as soon as possible. T48 - 1 e Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Scheduled percentage of completion 40% Actual percentage this date 70% e I E The 80% complete manual, which was submitted to the customer previously, has been informally reported to be satis- factory. visit to the customer for October 23rd & 24th, 1969, to discuss details of this and related tasks. has tentatively scheduled a STAT - Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 a 0 a a 0 a 0.0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 PROGRESS REPORT FOR PERIOD ENDING 31 AUGUST 1969 e I A Li 60 STAT 1,0 PROGRESS DURING REPORTING PERIOD Debuciginq activities continued in August. As-described in the July report, the reference phasing was corrected, and the analyzer reference delay adjustment range established, The activities had converged on removing interaction problems, setting the gain and scale factors in order, a checkout of the time base generator, a clean-up, and test considerations. A voltage and temperature cycling of the time base generator was performed. AF described previously, this was done as an adjunct to correcting suspicious behavior of the synchronized time base. The unsynchronized oscillator frequency variation was not significant with line voltage changes because of the mollifying effects of the intervening line-to-load regulation provided by the power supplies. A net change of 0.2% in frequency resulted from a line change from 103 to 126.5 volts. The variation with temperature, however, was -0.5%/?C. Tem- perature compensation was added to reduce the net variation to + 1.1% from 25? to 50?C. No further difficulty was experienced with synchronization. Electrical crosstalk between outputs was excessive. The inter- action was not only between error signals associated with common axes but also between axes. The on-axis distortion was mainly resulting from frequency distortion in the parallax analyzer multiplier. The addition of external sag compensation offered considerable relief from this interaction. A general level of e. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 6,,, Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 .interference on both axes was traced to the level sensitivity of the video correlator multipliers. To prevent the direct feedthrough of video which accompanied the product of the two correlator inputs, the input levels should be below 0.25 volts nns. The deflection current which shares the power ground with signal current in the 77 feet of cable to the image dissector assemblies was adding unwanted components to the signal, which were analyzed as offsets.. An independent double-back connection through the signal-ground line reduced this source of inter- ference. An additional source of interaction between X and Y scale errors was traced to the lack of control of the aspect ratios of the two rasters. To affect the equality Y1/X1 Y2/X2, a fixed attenuation was inserted in the X1 line and an adjustment in the X2 line to the deflection amplifiers. The remaining crosstalk is below the maximum allowable level with the AC threshold removed. who designed the original correlator circuitry, began working on the system on September 16. Don will be making the final setting to assure that the intent of the original design is realized. 2.0 PLANS FOR NEXT PERIOD Some additional time will be given to as explained above. The installation of the component board, wiring clean- up and inspection will follow. In the interim, the system drawings and the software submissions will be corrected. STAT STAT t. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 } Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 'Special attention will be given to the improvement of the test procedure. A later contact will advise you of the test date and any further considerations related to the acceptance tests. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A0014000.10010-8 a a Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873AO01400010010-8