STATUS REPORT JULY 1969
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP79B00873A001400010008-1
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
59
Document Creation Date:
December 28, 2016
Document Release Date:
August 24, 2012
Sequence Number:
8
Case Number:
Publication Date:
August 3, 1969
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 1.14 MB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
VP'i C 0?y
I 03
s...
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
STATUS REPORT
for Period
1 JULY through 31 JULY 1969
Submitted under Contract to
U. S. Government
File No. 11038
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
STAT
et,
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
7 ,
7
'71
k=
fl
This document is presented as the Monthly
Status Report under Contract to the U. S.
Government,
? The report period represented herein covers
the period 1 July through 31 July, 1969.
1=' Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
STAT
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
r-
i=1
t=1
Program Status
Task 1
INDEX
Page
Summary
Statements of Work, Specifications, Report Preparation
1
Ti - 1
Task 2
Scheduling and Planning
T2 - 1
Task 3
Test and Inspection Procedures
T3 - 1
Task 4
Management, Administration and Supervision
T4 - 1
Task 5
Meetings
T5 - 1
Task 6
Facilities Requirements
T6 - 1
Task 7
Main Frame
T7 - 1
Task 8
Skin
T8 - 1
Task 9
Granite and Ways Assembly for Stages
T9 - 1
Task 10
Air Bearings
T10 - 1
Task 11
Stage Drives
T11 - 1
Task 12
Film Drives
T12 - 1
Task 13
Film Platen
T13 - 1
Task 14
Film Cooling
T14 - 1
Tasks 16,
17 & 18
Optics
T16,17
&
18
Task 20
General Platen Illumination
T20 - 1
Task 21
Optical Bridge
T21 - 1
Task 22
Interferometer Assembly
T22 - 1
Task 23
Optics Drives
T23 - 1
Task 24
Image Analysis System
T24 - 1
Task 26
Digitizing Logic
T26 - 1
Task 27
Metric Readout
T27 - 1
Task 28
Output Logic and Interface
T28 - 1
Task 29
Cabling
T29 - 1
Task 30
Control Console and Chair
T30 - 1
Task 32
Computer
T32 - 1
Task 33
Electronic Racks and Control Cabinets
T33 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Index (cont'd)
Page
Task 34 Utilities, Vacuum and Air Systems T34 - 1
Task 35 Vibration Absorption and Leveling T35 - 1
Task 36 Overall Assembly T36 - 1
Task 37 R.F.I. Suppression T37 - 1
Task 38 Environmental Control T38 - 1
Task 39 Reliability Analysis T39 - 1
Task 40 Installation T40 - 1
Task 42 Breadboards and Test Services T42 - 1
Task 43 Computer Programming and Services T43 - 1
Task 44 Preacceptance Test in Fabrication Plant T44 - 1
Task 45 Acceptance Test in Fabrication Plant T45 - 1
Task 46 Acceptance Test after Installation T46 - 1
Task 47 Instruction Manuals T47 - 1
Task 48 Spare Parts Lists T48 - 1
Task 49 Operator Training T49 - 1 i
i
ii
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
APPENDICES
ri)rogress Report - for period ending
June 30, 1969 Appendix I
S TAT '
Progress Report - for period STAT
ending June 30, 1969 Appendix II
lit
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
'73
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
1=,
PROGRAM SUMMARY
Scheduled Percentage of Completion 71.2%
Actual Percentage this Date 65.3%
There have been no significant completed activities
during the month of July. The work has been proceeding on schedule
fl
with particular reference to assembly of the stage utilities and the
C:2
checkout of the electronics as an integrated system.
All aspects of the Stereocomparator project are
proceeding in a manner fully compatible with the requirements of
the program.
I=1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
"21
i=
Task 1 Statements of Work, Specifications,
Report Preparation
Scheduled percentage of completion 74%
Actual percentage this date 74%
No new specifications were developed or issued
during this report period.
Monthly reports from our subcontractors are
incorporated into this document under appropriate task headings
or in the Appendix.
Ti - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
0
0
0
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 2 Scheduling and Planning
month.
Scheduled percentage of completion
Actual percentage this date
74%
74%
No change in schedule has been made during the
The optical vendor's schedule has been brought
up-to-date and indicates that the equipment will be provided for
testing, at the
plant, by December 15, 1969.
T2 - 1
ES TAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
.?; Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
1=1
C=1
Task 3 Test and Inspection Procedures
Scheduled percentage of completion 61%
Actual percentage this date 53%
All test targets and photography, for the use of the
optical and correlation vendors, have been delivered to the vendors.
Work is proceeding on the development of the detailed
test procedures utilizing the targets and photography.
T3 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
1=
171
CM
CI
Task 04 Management, Administration and Supervision
Scheduled percentage of completion 74%
Actual percentage this date 74%
Management and administrative functions are
proceeding normally with no major departures from the original
Management plan.
T4 - 1
1= Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
? Ca
Task 5 Meetings
Scheduled percentage of completion 74%
Actual percentage of completion 74%
Meetings were held with customer representatives
the week of July 7th and the week of July 14th. During these periods,
the computer programing details and the equipment installation
environment were discussed.
In addition, dirt particle counts were made on the
Clean Room supply air and in the room during its periods of
activity and inactivity. It appeared that the Clean Room system
was compatible with the requirements of the Stereocomparator.
However, special cleaning of all surfaces of the
room were indicated to maintain a suitable condition during work
activity.
T5 - 1
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 6 Facilities Requirements
Scheduled percentage of completion
Actual percentage this date
The
? 98%
90%
Clean Room is in operation with respect to STAT
the work area in the room and the electronic cabinet air systems.
The temperature control for these two systems failed
due to control instrument defects and replacement parts are being
provided by the vendor. It is hoped that the temperature controls
will be back in operation by the end of July.
T6 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
i= Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
k=
r-
?=i
Task 7 Main Frame and Structural Elements
Scheduled percentage of completion 98%
Actual percentage this date 93%
The main frame for the Stereocomparator was
completed in September 1968.
No additional work will be scheduled for this
Task until the return of the Optical Bridge by the optics sub-
contractor.
T7 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
1=7
1=S
t=i
1=,
fl
ict
Task 8 Skin
Scheduled percentage of completion 44%
Actual percentage this date 30%
The fabrication of the external skin sections has
been completed to the point where the total assembly is needed
in order to finish this Task.
No further work is anticipated until the
Stereocomparator has been completely assembled.
T8 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 9 Granite and Ways Assembly for Stage
this time.
Scheduled percentage of completion 98%
Actual percentage this date 98%
No further work is anticipated on this Task at
T9 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
E
1
p=i
41=1
Task 10 Air Bearings
Scheduled percentage of completion
Actual percentage this date
98%
92%
As previously reported, the air bearings were
installed on both stages in February.
No further work will be scheduled until the
utility cabinet is completed, following which the bearings
will be tested with the interferometers.
T10 - 1
1-7
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24 : CIA-RDP79B00873A001400010008-1
ine$
6=1
1=1
i=1
fl
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task. 11 Stage Drives
Scheduled percentage of completion 98%
Actual percentage this date 70%
Installation of the stage drive assemblies on
the right and left hand stages was completed during the month
of June.
Testing of the assemblies will be conducted
after the utilities cabinet has been completed.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
L Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 12 Film Drive and Transport System
Scheduled percentage of completion 86%
Actual completion this date 70%
The wiring for the film drive and transport system
has been partially completed.
The left stage film drive wiring is complete.
After completion of the wiring systems, servo
compensation of these units can proceed.
T12 - 1
I=1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
=71i
L:3
tzsl
Task 13 Film Platen and Film Clamping
Scheduled percentage of completion 98%
Actual percentage this date 88%
The film clamping and film platen assemblies are
awaiting dynamic testing pending completion of the air relay logic
wiring.
begun.
The wiring for the modified air control system has
T13 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
=;1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 14 Film Cooling
Scheduled percentage of completion 93%
Actual percentage this date 60%
There will be no further work on Film Cooling
until the optical system arrives.
T14 - 1
E:2 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Tasks 16, 17
and 18 Viewing Optics, Viewing Illumination, Reticle
Projector and Illumination
Scheduled percentage of completion 91%
Actual percentage this date 86%
?
The work of integrating the
supplied optical
STAT
drive equipment
continued.
with
the vendor's
supplied
optical systems was
has sent to
approximately 95% of the
STAT
servo components
for
installation
in the
STAT
optical bridge.
is also performing the necessary wiring and
cabling work involved
In the installation.
has scheduled
assembly and test activities
STAT
during their regular August annual vacation and the
be in their plant during this period.
T16, 17 & 18 - 1
monitor will
c' Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
STAT
I
L, Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 20 General Platen Illumination
Scheduled percentage of completion 98%
Actual percentage this date
70%
The platen illumination equipment has been installed
on the Stereocomparator and will be tested on the machine when its
wiring is complete. The units were previously bench tested and
performed satisfactorily.
T20 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1 .
Jn
f=i
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 21 Optical Bridge and Supports
Scheduled percentage of completion 96%
Actual percentage this date 90%
No further work is scheduled until receipt
of optics from subcontractor.
T21 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Y=1
k,d
Task 22 Interferometer Assembly
Scheduled percentage of completion 84%
Actual percentage this date 68%
Concern exists regarding the laser interferometer
return beam effecting the cavity servo control on the laser. A
report was prepared
concerning this problem. STAT
In addition, a polaroid and quarter wave plate
sandwich has been received and will be tried out as a means of
minimizing the effects of the laser on the return beam.
Tests cannot be performed on the interferometer
until the temperature control system is performing to the
proper specifications, (see Task 6).
T22 - 1
STAT
1=1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
fl
I=1
Task 23 Optics Drive Assembly
Scheduled percentage of completion
84%
Actual percentage this date 80%
The main optics drive assembly tests were completed
during this report period. The simulated optics systems were driven
by the computer, the A/D - D/A converters, and the computer inter-
face circuitry. The entire system displayed an accuracy of 1 bit.
The crosstalk and noise present was not sufficient to cause a, 1 bit
change.
The slaved and non-servo optics drives tests were
started and should be completed during the next report period.
The automatic brightness control loop computer model
was completed and it is now in the fabrication stage.
?T23- 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 24 Image Analysis System
Scheduled percentage of completion 78%
Actual percentage this date 90%
Progress on this task is detailed in
Progress STAT
Report for the period ending June 30, 1969, which is included as
Appendix I to this report.
The date for acceptance testing of this system is
tentatively scheduled for the week of August 18 or August 25.
T24 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
0.
0
Lu
0
0
0.
Task 26 Digitizing Logic Subassembly
Scheduled percentage of completion 98%
Actual percentage this date
-93%
This Task is now covered under the discussion in
Task 28 - Output Logic and Interfaces.
Please refer to this Task.
T2'6 -
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
t=t
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
b=J
r7
Task 27 Metric Readout
Scheduled percentage of completion 98%
Actual percentage this date 95%
This Task is now covered under the Output Logic
and Interfaces, Task 28.
Please refer to this Task for a progress report.
T27 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
7
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 28 Output Logic and Interface
Scheduled percentage of completion 98%
Actual percentage this date 85%
The tests of the computer interface and AD/DA
converters, which was done for a simulated optics drive test,
was completed.
A test of the film and stage drive logic and metric
readout has begun.
T28 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
k=; Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
-21
fl
Task 29 Cabling
Scheduled percentage of completion 98%
Actual percentage this date 96%
Additional manufacture and checkout of cables was
done during the last report period.
T29 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 30 Control Console and Chair
Scheduled percentage of completion 97%
Actual percentage of completion 85%
The checkout and testing ofthe console and its
associated interface circuitry continued during this last month.
This includes testing of the manual optical controls and readout
digits as well as the function control pushbuttons.
The IBM 526 punch will be used to aid in the testing
of the readout characters which will begin next month.
T30 - I
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 32 Computer
Scheduled percentage of completion 98%
Actual percentage this date 95% .
No new work was done to the computer circuitry during
this last report period since the computer is already installed and
working.
T32 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
i0
0
Declassified
Task 33 Electronic Racks and Control Cabinets
Scheduled percentage of completion 98%
Actual percentage this date 90%
The internal cables in the electronic racks were
installed and harnessed.
T33 - 1
in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
t=7,
Task 34 Utilities, Vacuum and Air Systems
fl Scheduled percentage of completion 87%
Actual percentage this date 80%
The electrical wiring for the valves, pressure
switches and air control solenoids was begun during this report
period.
T34 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
.1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
PI ?
1=1
Task 35 Vibration Absorption and Leveling ,
Scheduled percentage of completion 90%
Actual percentage this date 85%
No further work is scheduled for this Task until
the Optical Bridge is received from
At this time, full
tests of response time and stage deflection will be conducted.
This delay is necessitated by the requirement for
full weight loading of the stages during these tests.
T35 - 1
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
rj Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 36 Overall Assembly
Scheduled percentage of completion 62%
?=i
Actual percentage this date 38%
? 1
C =
7
=
7_7
Work is continuing on the mechanical assembly of
the stages with respect to the vacuum, air and wiring facilities.
The electrical cable connection panel and air bearing
air connection panel is being installed in the rear of the Stereo-
comparator.
The electronic assembly work was essentially
completed previous to this month and the work currently consists
of checkout and testing of the many subassemblies as an integrated
System.
T36 - 1
c=1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
I Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
o
Task 37 Radio Frequency Noise Suppression
month of July.
0.
0
.0
Scheduled percentage of completion .
Actual percentage this date
No work was scheduled on this Task for the
? Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 38 Environmental Control
Scheduled percentage of completion 83%
Actual percentage this date 89%
Meetings were held with the customer site prepara-
tion consultant with special reference to the film cooling air system.
This equipment has been designed and is ready for
fabrication as part of the site preparation. The device appears to
be fully compatible with the needs of the Stereocomparator.
T38 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 39 Reliability Analysis
of July.
Scheduled percentage of completion 17%
Actual percentage this date
No work was scheduled on this Task for the month
T39 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 40 Installation
Scheduled percentage of completion
Actual percentage this date 18%
No work was scheduled or performed on this task
T40 - 1
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
i= Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
szml
7
Task 42 Breadboards and Test Devices
Scheduled percentage of completion 65%
Actual percentage this date 55%
The servo compensation and performance tests were
completed during this report period (see Task 23).
The servo breadboards have been disassembled and
the required components have been shipped
The remaining testing of the tracking program can be
done without the breadboards.
T42 - 1
7
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 43 Computer Programming and Services
Scheduled percentage of completion
Actual percentage this date
89%
70%
progress report for the period June 1
to June 30, 1969, is included as Appendix II to this report.
Informatics' computer programming personnel was
included in the meetings between
STAT
nd the customer concerning STAT
the review of the computer program concepts for the Stereocomparator.
T43 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
: Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 44 Preacceptance Test in Fabrication Plant
month of July.
Scheduled percentage of completion
Actual percentage this date 0%
No work was scheduled for this Task for the
T44 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 45 Acceptance Test in Fabrication Plant
month of July.
Scheduled percentage of completion
Actual percentage this date
No work was scheduled for this Task for the
T45 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 46 Acceptance Test After Installation
of July.
Scheduled percentage of completion 0%
Actual percentage this date 0%
No work was scheduled on this Task for the month
T46 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
I Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
r=!
r=1
Task 47 Instruction Manual and Drawing Submittal
Scheduled percentage of completion 59%
Actual percentage this date 27%
The revision of the design drawings to cover
the "as built" status of the various subassemblies of the
Stereocomparator is proceeding according to schedule.
T47- 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Task 48 Spare Parts List
Scheduled percentage of completion 39%
Actual percentage this date 50%
An addendum to the Spare Parts List has been
completed. This updates the Spare Parts List through this report
period.
The anticipated life and replacement time of the
spares is presently being computed.
T48 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
C=11
fl
Task 49 Operator Training
Scheduled percentage of completion 40%
Actual percentage this date 70%
During July, the first 80% of the Operator Training
Manual was delivered to the customer for their review.
? Some preliminary discussions were held relative to
the sending of customer representatives to
or orientation with
respect to the actual operation and the computer programing aspects
of the Stereocomparator.
It is indicated that, at about the end of 1969, the
Stereocomparator would be sufficiently complete :to make an operat-
ing review (operator training program) of the equipment feasible.
This problem is thus not critical at this time. However,
as the completion date approaches, the necessity for planning for
customer orientation is apparent.
T49 - 1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Do
0
0
n kit.)
D
Declassified in in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
PROGRESS REPORT FOR PERIOD ENDING 30 JUNE 1969
1.0 PROGRESS DURING REPORTING PERIOD
The test fixture support was redone using black anodized 3/8 inch
aluminum tool plate. The fixture was reassembled with new gussetts
and shock mounting on the blower assembly. The fixture is more rigid
and durable with no noticable vibration. The plywood support was
discarded.
Preacceptance testing was started in June. This phase of the pro-
ject is used to correct wiring difficulties and to affect circuit
adjustments and changes which enable the system to perform to speci-
fications. As a Quality Assurance measure, the test equipment
used during this phase was sent out for calibration. The untimeliness
of this procedure, however, caused some delays in testing. A suitable
illumination meter was detained until 8 July in the process.
The S20 image dissector tubes required rewiring because of dissimilar
socket connections and additional voltage requirements over the Sll
tubes.
Mutual coupling effects from the 77 foot cable runs made it necessary
to modify the circuit boards in the image dissector.astemblies to
accommodate bypass capacitors on the power supply lines and resistive
bias dividers. Decoupling was extended to both modules in each video
amplifier.
The Reynolds Industries high voltage cable assemblies broke down
after a short period of relatively normal use. The cables were
purchased with certification of high-potential testing and not sub-
jected to unusual stress, which might destroy their high-voltage
integrity. Three of the four cables developed leakage in excess of
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
f=1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
?E
fl
500 microamperes at voltages under 500 volts (as indicated on an
Associated Research Inc, Hypot Junior meter). Arcing at low voltages
was also observed at the connectors. The Reynolds cable assemblies
will be replaced with RG 142 B/U which has a .116" core diameter as
opposed to the .050" diameter of Reynolds "L" cable. Both cores are
teflon (FEP). AMP connectors type 10-M-3000 panel, type 101-M-3800-75
bulkhead, and type 101-11-1800 cable connector will be used. Cable
drawings will be revised and cutout dimensions forwarded at
a later date.
Limited testing and debugging continue with temporary high voltage
lines. Since the image dissector assemblies are being tested without
their housings, an open frame fixture is used. Proper alignment to
make final derminations and adjustments cannot be maintained until
permanent connections make the use of the test fixture possible.
Notations of wiring and component changes are being maintained.
However, drawings will not be updated until the tests are complete.
2.0 PLANS FOR NEXT PERIOD
Preacceptance testing will continue:
acceptance testing is
currently projected to the last week of August.
Percentage of job completed to date - 90%.
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
1:1
pc)
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
fl
MONTHLY PROGRESS REPORT
June,' 1 9 69
This technical report is for the reporting period from June 1 to June 3
1969. The report is prepared according to
STAT
Specification number DB1001 (as modified).
1. At the end of the month, subroutines
a. CONVRT
b. DATAIN
c. PARMOD
d. SCANER
e. FID
f. TTIN
g. TTIC and
h. RECIN
_were checked out and documented.
During the month, these routines underwent considerable redesign.
As a result, the function of subroutine TBSRCH has been incorpor-
ated into PARMOD itself. Also, subroutine NOCAM's function has
been assumed by EXEC1.
A new entry ASCDEC has been coded into subroutine ASC BIN. While
ASCBIN decodes ASCII to floating point, ASCDEC decodes ASCII to
fixed point binary.
Although a system tape has been created for the real time program,
il it has been used very little because work on the computer interface
trj
?L. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
and D/A converters has not progressed sufficiently.
With most of the redesign of the non-real time program behind
us now.; work should soon begin proceeding at an encouraging rate.
As of this reporting period, approximately 70% of the total contract
work has been completed.
2. Next month, the redesign of the non-real time program will be com-
pleted. Completion involves:
a. Redesign of FIDZ and FID3.
b. Modifications to EXECI to accommodate the many changes of
its subordinates.
c. Checkout of the stage initialization supervisor STAGIN.
After completion of the redesign, the non-real time program will be
integrated. It should be completely operational by the end of July.
3. At the end of May the problem of how to filter the crosstalk out of
the correlator had not yet been resolved. This has a low priority
because it is not really clear that crosstalk will even be a problem.
4; At the time of this writing the contract extensions is in the final
stage of negotiation. will be transmitting
two signed copies of the agreement before the end of July.
will continue working second shift through the second
week of August. After that it has been agreed that he will return
to day shift for the duration of the contract.
6. No changes or agreements have been made requiring the contracting
officer's approval.
SISTAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
, ?
fl
7. No other unresolved matters are known to exist.
r-
fl
fl
171
'" Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Name
b C
?V V CAMATS
,-01 R-c-B1:1\3
CONVRT
. 1
CVB
CVF
)
t/e DATAIN
t VI EXEC I
EXEC 2
, ), ? .
E7X-14.44.
-14-----L---4H-S?S
1 i
i
V7 Vi FID I
: ,,,/ ? 1
1 ?
/I FID 2
/ I FIXR
V1 GTP
1
V I' LS TC /Ps ET
: v v" ',/ MATMAK
v")--MSGIN
: ?7 '-vIM'MSGOUT
, V 7 VI. MTS
ALPHABETICAL SUBPROGRAM INDEX
General Subprogram Flow Diagram Page 8
Page No.
118-123
44
130,131
132,133
27-31
17-19
20-25
152
56-58
59-62
157,158
80-82
145,146
127-129-
147,148
149151
100-104
I
,z4/ ,AARMOD 32-35
P S ET
Declassified in Part - Sanitized Copy Approved
/
Name Page No.
c
vl PTOP 105-111
it RDOP 140-142
'' RDST 143,144
RECALL 66-68
RECIN 45,46
REORT 83-88
SCANER 39,40
STAGIN 49-55
TIC T 1347136
TICX 137-139
,,' TMAT 89-99
TRK 69-79
,
TTIC 63765
TTIN 47,48
T 2 PAN
XMX I
YMR
112-115
124-126
116,117
for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1
tiDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010008-1