SATUES REPORT FOR JUNE 1969

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79B00873A001400010006-3
Release Decision: 
RIPPUB
Original Classification: 
K
Document Page Count: 
75
Document Creation Date: 
December 28, 2016
Document Release Date: 
August 24, 2012
Sequence Number: 
6
Case Number: 
Publication Date: 
July 3, 1969
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79B00873A001400010006-3.pdf1.83 MB
Body: 
Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 ;40 Cuot4 1 0 3 F Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approvedfor Release 2012/08/24: CIA-RDP79B00873A001400010006-3 fl STATUS REPORT for Period 111JNE through 30 JUNE 1969 Submitted under Contract to TT S C4nvPrn mPn t File No. 11038 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 STAT E Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 fl k=i1 77: 4=1 771 Li This document is presented as the Monthly Status Report under Contract to the U. S. Government, The report period represented herein covers the period 1 June through 30 June 1969. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 STAT STAT STAT lit.J Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 I I 17 I 1 II ?=1 c=i Ln j 1? 17! , t=i .i 1 I in 1=1 E 1.7 ; 1:3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Program Status INDEX Page Summary 1 Task 1 Statements of Work, Specifications, Report Preparation 2 Task 2 Scheduling and Planning 3 Task 3 Test and Inspection Procedures 4 Task 4 Management, Administration and Supervision 5 Task 5 Meetings 6 Task 6 Facilities Requirements 7 Task 7 Main Frame 8 Task 8 Skin 9 Task 9 Granite and Ways Assembly for Stages 10 Task 10 Air Bearings 11 Task 11 Stage Drives 12 0 Task 12 Film Drives 13 Task 13 Film Platen 14 Task 14 Film Cooling 15 Tasks 16, 17, 18 Optics 16 Task 20 General Platen Illumination 17 Task 21 Optical Bridge 18 Task 22 Interferometer Assembly 19 Task 23 Optics Drives 20 Task 24 Image Analysis System 21 Task 26 Digitizing Logic 22 Task 27 Metric Readout 23 Task 28 Output Logic and Interface 24 Task 29 Cabling 25 Task 30 Control Console and Chair 26 Task 32 Computer 27 Task 33 Electronic Racks and Control Cabinets 28 : Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Ctl 1:=11 Index (cont'd) Page Task 34 Utilities, Vacuum and Air Systems 29 Task 35 Vibration Absorption and Leveling 30 Task 36 Overall Assembly 31 Task 37 R.F.I. Suppression 32 Task 38 Environmental Control 33 Task 39 Reliability Analysis 34 Task 40 Installation 35 Task 42 Breadboards and Test Services 36 Task 43 Computer Programming and Services 37 Task 44 Preacceptance Test in Fabrication Plant 38 Task 45 Acceptance Test in Fabrication Plant 39 Task 46 Acceptance Test after Installation 40 Task 47 Instruction Manuals 41 Task 48 Spare Parts Lists 42 Task 49 Operator Training 43 ii Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 APPENDICES Trip Report Appendix I STAT Report - for period ending STAT Progress May 31, 1969 Appendix II STAT Progress Report - for period ending May 31, 1969 Appendix III iii Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 rn s=i Fl ? 7 r71 PROGRAM SUMMARY Scheduled Percentage of Completion Actual Percentage this Date 67.2% 62.2% There have been several major accomplishments to the program during this reporting period each of which are discussed more fully under the individual task headings. In summary these achievements are: 1. Completion of the utilities cabinet. 2. Installation of inter-cabinet cabling and hook-up. 3. Air conditioning to the assembly area is in operation and provides environmental control which can be used for interferometer checkout. 4. The Optical Subcontractor has performed several preliminary tests which indicate satisfactory resolution in the system. - 1 - Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 1 fl Task 01 Statements of Work, Specifications, Report Preparation i Scheduled percentage of completion 70% Actual percentage this date 70% No new specifications were developed or issued during this report period. Monthly reports from our subcontractors are incorporated into this document under appropriate task headings or in the Appendix. -2- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 I? , K=; Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 t=:1 I=:1 Task 02 Scheduling and Planning Scheduled percentage of completion 70% Actual percentage this date 70% Detailed schedules for systems checkout and tests which will be implemented when the Optical system is received are currently being worked out. It is anticipated that these schedules will be ready in August. -3- F k= Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 r L=i Task 03 Test and Inspection Procedures Scheduled percentage of completion 56% Actual percentage this date 50% Work is progressing in the development of test procedures to be implemented in the various subcontractor's plants. It is expected that the first of these tests will be conducted al during August 1969. -4- STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 04 Management, Administration and Supervision i Scheduled percentage of completion 70% ' i=A Actual percentage this date 70?A Management and Administrative functions are proceeding normally with no major departures from the original Management plan. -5- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 7 Task 05 Meetings, c=i Scheduled percentage of completion 70% Actual percentage of completion 70% The program manager met with various customer representatives at the building site on June 11th for the purpose of coordinating installation and environmental control activities. -6- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 06 Facilities Requirements Scheduled percentage of completion 98% Actual percentage this date 88% The assembly area air conditioning is 'on line' on a 'coarse control' basis. Room cooling, ventilating and heating is operating as planned but the system for environmental control of the electronic cabinets is not yet activated. This is due to the fact that the electronic systems are presently being tested and the electronic cabinets cannot be closed up. We anticipate that the complete system will be in operation during the latter part of July. -7- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 L. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 ICJ Task 07 Main Frame and Structural Elements Scheduled percentage of completion 98% Actual percentage this date 93% The main frame for the Stereocomparator was completed in September 1968. No additional work will be scheduled for this Task until the return of the Optical Bridge by the optics sub- contractor. -8- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 1=1 Task 08 Skin Scheduled percentage of completion 35% Actual percentage this date . 30% The fabrication of the external skin sections has been completed to the point where the total assembly is needed in order to finish this Task. No further work is anticipated until the Stereocomparator has been completely assembled. -9- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 09 Granite and Ways Assembly for Stage this time. Scheduled percentage of completion 98% Actual percentage this date 9 8cYc No further work is anticipated on this Task at -10- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 L.! GI Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 10 Air Bearings Scheduled percentage of completion 98% Actual percentage this date 90% As previously reported, the air bearings were Installed on .both stages in February. No further work will be scheduled until the utility cabinet is completed following which, the bearings will be tested with the interferometers. -11- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 11 Stage Drives Scheduled percentage of completion 89% Actual percentage this date 65% Installation of the stage drive assemblies on the right and left hand stages was completed during this report period. Testing of the assemblies will be conducted after the utilities cabinet has been completed. -12- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 F '72 r 1 i 7 I f 7 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 12 Film Drive and Transport System Scheduled percentage of completion 73% Actual completion this date 68% The modified film drive and transport system has been installed. Formal testing will be accomplished during the next report period. -13- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 II=1" 1=ar g=i Task 13 Film Platen and Film Clamping Scheduled percentage of completion 98% Actual percentage this date 85% The platen holders with film handling equipment have been installed and are scheduled for testing during the next report period. -14- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 ezd Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 14 Film Cooling 111 Scheduled percentage of completion 81% Actual percentage this date 55% The utilities cabinet design has been modified to provide the additional valves and tubing required for film cooling. These valves have been installed. -15-- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Tasks 16, 17 and 18 Viewing Optics, Viewing Illumination, Reticle Projector and Illumination Scheduled percentage of completion 87% Actual percentage this date 79% A visit was made to the optical subcontractor's plant during the week of June 16th. The subcontractor, has completed all parts both mechanical and optical required for the Stereocomparator. The work remaining is to assemble the parts together with the electronic and drive components supplied tests. STAT STAT and make the definitive optical and electromechanical STAT The present work schedule contains no slack time, thus in the event of technical difficulties during assembly or test delay could be anticipated. The monitor's Trip Report for the visit is included in the Appendices. -16- S TAT plant STAT l=1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 20 General Platen Illumination Scheduled percentage of completion 97% Actual percentage this date 55% No additional work was scheduled for this task for the month of Tune. -17- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 21 Optical Bridge and Supports 771I Li Li Scheduled percentage of completion 96% Actual percentage this date 90% During this report period, continued to inter- STAT face with the Optics subcontractor on items relating to the installa- tion of internal cabling and controls. It is anticipated that this phase of the task will be completed in the month of July. -18- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 ' 7:1 t i=# Task 22 Interferometer Assembly Scheduled percentage of completion 78% Actual percentage this date 65% The interferometer checkout, which was scheduled to begin during this report period, has been delayed in order to provide additional time for the Optics drives checkout and computer program integration. Checkout has been rescheduled for the month of August. -19- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 23 Optics Drive Assembly Scheduled percentage of completion 77% Actual percentage this date 70% Work continued on the systems checkout of the optics servo drives using the optics servo breadboards and the D/A - A/D converters. The systems were driven by the computer and its interface circuitry. With the optics drives being simulated by the servo breadboard assembly this is, in effect, a test of the actual computer controller optics drives. Various noise and timing problems associated with the inclusion of the computer and inter- face into the system have been resolved. The final checkout of this system for sensitivity, noise immunity, cross-talk and stability will be completed in the next report period. This test will be driven by a specially prepared test program. The automatic brightness control loop is in the computer model stage. The system parameters are known and the hardware related to these sections has been specified. There is further work to do but no difficulty is expected. -20- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 t.; Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 1=11 Task 24 Image Analysis System Scheduled percentage of completion 75% Actual percentage this date 90% Progress on this task is detailed in Progress Report for the period ending May 31, 1969, which is included as Appendix II to this report. The date for acceptance testing of this system is tentatively scheduled for the week of August 18 or August 25. -21- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 fl I 71 1 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 26 Digitizing Logic Subassembly Scheduled percentage of completion 98% Actual percentage this date 90% This Task is now covered under the discussion in Task 28 - Output Logic and Interfaces. Please refer to this Task. -22- 117 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 27 Metric Readout Scheduled percentage of completion 98% Actual percentage this date 95% This Task is now covered under the Output Logic and Interfaces Task 28. Please refer to this task for progress discussion. LU, LU, , Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 CDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 28 Output Logic and Interface Scheduled percentage of completion 98% Actual percentage this date 80% During this report period work continued in the testing of computer interface with the AD/DA converter and the resulting information utilized in the optics simulation tests (Task 23). We anticipate that these tests will be completed during July, after which the logic checkout of film and stage drives will be started. U. 0. -24- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 L.. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 29 Cabling Scheduled percentage of completion 98% Actual percentage this date 94% Manufacture of all required cables and checkout of over 70% of installed cables has been accomplished during the month of June. It is anticipated that checkout of the remaining cables will be completed during the next report period. -25- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 r- I=1 r- 1=1 Task 30 Control Console and Chair Scheduled percentage of completion 97% Actual percentage of completion 83% Work continued on checkout and tests of controls and interfaces between console and cabinets during this report period. All functions and operational modes, which were checked, have proven to be in order. Cable interconnection between the control console, utility distribution panel and cabinets have been completed. -26- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 YDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 17:1 Task 32 Computer Scheduled percentage of completion 98% Actual percentage this date 95% The computer system is operating as planned with the punch/teletype interface completed. -27-- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 t. 1=1 Task 33 Electronic Racks and Control Cabinets Scheduled percentage of completion 98% Percentage completed this date 90% This task has been completed during this report period with all chassis installed, internal cabling completed and external power connected to the utilities control panel. -28- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 mi Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 r.- t=i t., fl 1. Task 34 Utilities, Vacuum and Air Systems Scheduled percentage of completion 80% Actual percentage this date 75% The air and vacuum lines for the mechanical portions of the utilities cabinet have been installed and the valves and piping completed. We anticipate that the electrical hook-up of the valves and meters will be completed in July. All electrical connections have been made to the main and subbreakers in the electronic portion of the utilities cabinet. -29- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 35 Vibration Absorption and Leveling Scheduled percentage of completion 90% Actual percentage this date 85% No further work is scheduled for this Task until the Optical Bridge is received from Sopelem. At this time, full tests of response time and stage deflection will be conducted. This delay is necessitated by the requirement for full weight loading of the stages during these tests. -30- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 36 Overall Assembly Scheduled percentage of completion 56% Actual percentage this date 33% , Steady progress toward the overall assembly of the Stereocomparator and related components is being made. 0 This report period was highlighted by the following accomplishments: 1. Completion of the utilities cabinet and putting 01 it 'on line' as the power source of all electronic components. 2. Installation of the utilities (vacuum and air) piping to the rear of the Stereocomparator to provide the source of cooling air which is required. 3. Completion of all underfloor cabling. 4. Completion of chassis installation in the electronic cabinets. -31- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 h., Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 ri Task 37 Radio Frequency Noise Suppression 1=1 i=1 e., of June. Scheduled percentage of completion Actual percentage this date 0% No work was scheduled on this Task for the month -32- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 c=s IF Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 38 Environmental Control Scheduled percentage of completion 81% Actual percentage this date 87% The program manager met with the customer during this report period for general discussions related to the site preparation requirements. -33- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 39 Reliability Analysis of June. Scheduled percentage of completion Actual percentage this date No work was scheduled on this Task for the month -34- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 fc., Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 40 Installation Scheduled percentage of completion 0% Actual percentage this date 1 5 Oh During the month of June, a general discussion of installation procedures was held at the customer's site. Please see Task #5- Meetings, and Task #38- Environmental Control. -35- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 r L% Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 C=1 1=1 Task 42 Breadboards and Test Devices Scheduled percentage of completion 54% Actual percentage this date 55% Woit is continuing on servo compensation and performance tests at this writing. It is anticipated that the tests for compatibility of computer tracking program and the servo motors will be conducted during July. 736- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 ? ri i=s Task 43 Computer Programming and Services Scheduled percentage of completion 70% Actual percentage this date 65% progress report for the period May 1 to May 31, 1969, is included as Appendix III to this report. It will be noted that the percentages shown for scheduled and actual completion for the month of June are lower than those reported in the May Status Report. This discrepancy is due to a rescheduling of the Informatics effort to include certain changes in scope which have been requested period. thus lengthening the expected performance This rescheduling will not have any adverse effect on the overall program schedule. -37- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 STAT STAT L Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 44 Preacceptance Test in Fabrication Plant month of June.. Scheduled percentage of completion Actual percentage this date 0% No work was scheduled for this task for the -38- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 45 of June. Acceptance Test in Fabrication Plant ? Scheduled percentage of completion Actual percentage this date 0% No work was scheduled for this task for the month -39- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 46 Acceptance Test after Installation of June. Scheduled percentage of cornpietion 0% Actual percentage this date 0% No work was scheduled on this task for the month -40- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 47 Instruction Manual and Drawing Submittal Scheduled percentage of completion 50% Actual percentage this date 25% The revision of the design drawings to cover the "as built" status of the various subassemblies of the Stereocomparator is proceeding according to schedule. -41- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 ' e=i Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 48 Spare Parts List Scheduled percentage of completion 38% Actual percentage this date 40% Work is continuing on the compilation of the recommended spares for the Stereocomparator, both mechanical and electronic components. The preliminary spares list with parts priced was delivered to the customer on June 11, 1969. -42- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 u[j Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Task 49 Operator Training Scheduled percentage of completion 30% Actual percentage this date 70% Work is continuing on the Operator Training Manual which will be used in training personnel to operate the Stereocomparator. A transmittal of the preliminary manual (approxi- mately 80% complete) is planned for the end of June. -43- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 a Do Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Company Contacted: Contacted by: Contact dates: Purpose: Persons Contacted: Representing Zoom Potentiometer TRIP REPORT Week of June 16, 1969 Monitoring the Sopelem Optical Contract Item 281 on drawing E4961B for the 5 cup rotatable potentiometers presents a problem in that the potentiometer is so long that it interferes with the frame of the zoom mount. It will be necessary to cut back the frame in order to provide for the 5 cup potentiometer. has undertaken to do this work. There is a further interference between the potentiometer and a new angle electrical plug, will have to relocate the plug receptacle so that when the plug is installed it will pot interfere with any of the remainder of the assembly. They felt that this could be done without particular difficulty. s attempting to locate a smaller potentiometer that will not require to modify the frame. A Telex has been sent to giving the new dimensions. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 STAT STAT STAT STAT STAT STAT STAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Potentiometer Connection Error On drawing C8052D there is an error shown on the connections for cup 1 of the potentiometer. The positive and negative connections are shown reversed. This is item 283 on drawing 4961B. In general, when finds a situation with problems in the wiring continuity, they will match the wiring throughout the cable and local internal optical bridge wiring by means of color or pin number or some other means available to them. Drawing E4830D This drawing shows four micro switches at each end of the Geneva Drive. The arrangement of the four micro switches is unique in that while there are three switching positions, at the middle of the three positions there are two micro switches which must operate simultaneously. The pre-limit cam which actuates the first micro switch is 12-1/2 degrees ahead of the final position of the drive, however this cam must keep the micro switch engaged while the drive operates to its terminal point. That is, there cannot be a momentary make followed by a break; it must be a continuous make condition after actuation. The same situation applies to the two micro switches which next are actuated and again it must apply to the final micro switch which provides for a five to ten degree overrun. This switch also must not open again by a continuation of the drive action. The cam must hold the switch closed even if exceeds the five to ten degrees of the over- travel. -2- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Drawing 08053/2-A On drawing 08053/2-A there are various shielded wires shown. From the slip ring plug out to the main interconnecting receptacle for the optical bridge cables, the slip ring wiring is not shielded even though the mating cable contains shielded wiring elements. was directed to ignore the shielding requirements in the wiring that they are installing for the slip ring assemblies. It has been noted by that the slip ring friction was much greater than the five inch ounces specified on the slip ring drawing. The question was whether or not the slip rings were defective or had become defective since receipt It turned out that STAT STAT had STAT not determined or checked the slip ring torque requirements and, there- fore, there was no information as to the friction at the time the rings were received A Telex was sent to so that they might question the manufacture to determine what was the proper rotation torque for the slip rings. It developed that the manufacturer's specification was 85 inch ounces for a normal operating torque. The manufacturer had not determined the torque either. The torque was then determined at STAT and approximately STAT 35 inch ounces was the value found. Since the ultimate torque value might well be the 85 inch ounces, or greater, suggested by the manufacturer of the slip rings, it became clear that the drive as presently designed was not adequate; that the motor was too *small and the gearing was not suited to the actual friction. A new gear head motor was ordered -3- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 U Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 the specifications for this were given to so that they might change the appropriate parts of the anamorph rotation assembly. The motor selected was from the Globe catalog, type LL-3 with the gear head planetary arrangement of catalog 5A2357 and additionally with a tachometer mounted at the rear of the motor. The gear head output shaft is 1/4 inch diameter and the gear ratio is 352.6 to 1. The motor voltage is 12 volts DC with a no load speed of 10,200 RPM. The rated torque Was 1 ounce inch; this is at the motor end while the breakaway torque was 5.1 ounce inches. The no load current was .415 amps; the rated torque was 1.80 amps. The estimated stall current was 4.0 amps. The maximum continuous torque from the gear box is 145 ounce inches with a nominal efficiency of 41%. With the voltage and current rating for this new motor, it will be possible to power the system from the existing servo power amplifier. Actually, the stall amperage is slightly too high, however it merely means that the stall torque of the system may not reach the maximum design value. In any event, it should be fully adequate to operate the anamorph rotation system. Drawing E5387-B A Ledex shutter light control at a 28 volt value is shown in the drawing E5387B. There was a problem here in that in the interests of rapid action, STAT wished to have a 12 volt Ledex rotary solenoid STAT installed. The 12 volt Ledex would be driven by a 24 volt system. There seemed to be considerable confusion concerning this particular situation and was done. was requested to call in the Ledex distributor which -4- STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 L Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 I I The representative had additional catalogs not available to either and it was learned that there were 24 volts rotary solenoids with the appropriate torque to handle the work. On this basis a unit was selected and was directed to order a total of four units including two spares. The appropriate unit is slightly larger than the original Item. However, it will fit in the space and will operate satisfactorily from the 24 volt supply on th lectronic system. The Ledex rotary solenoid selected for the eye piece shutter assembly is a 25 volt type 2E model 33. Ibis provides twice the torque of the model 32 which was originally selected. ordering a model 33 and ill connect it to the 24 volt system. STAT STAT STAT is STAT STAT The allowable duty cyCle, at this rating, is about 50% which is ample for the requirements. STAT Light Level Control & Correlation Tubes is required to focus and otherwise provide images for the operation of the image dissector tubes and the photo multiplier tubes. Since does not have available the completed items, it will be necessary to send to mockups containing the mounting arrangement of the real devices and equipped with small screens that would simulate the surfaces upon which the optical images would be located. of August. requires these parts in their plant at the beginning -5- STAT STAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Drawing D6940C The micro switch and cam for actuation, as shown on drawing D6940C, is not required by rand can be left out of the assembly by Drawing E53878 Drawing E53.878 shows no micro switches on the eye. piece light control disc. STAT STAT has been able to modify the wiring system STAT to take care of this situation. A marked print showing the wiring change for the cables has been given Drawing E6970C On drawing E6970C, all micro switches are shown arranged for momentary contact. contact and requires that the micro switches maintain does not know, at this time, if it is possible to provide for this condition. If Is required to do this with electronic logic, it can be done but it will be quite complex, costly and taking a lot of space. The matter is presently being investigated Drawing E7220C Drawing E7220C shows that has removed the STAT STAT STAT STAT STAT STAT micro switches from the assembly. The cable drawing C8048A does STAT not show this situation and, therefore, will have to be revised to be compatible with the assembly. STAT -6- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified Drawing E7470D In drawing E7470D, the items shown as 160 and 178 Indicate a plug receptacle with only I pin. requires at least 3 STAT wires to this sub assembly and to accommodate this, the receptacle. must be MS 3102A-10 SL 3S. The proper plug and socket must be procured by and the plug will have to be fixed to a new cable A new bracket must be fabricated STAT to accommodate STAT the receptacle. The drawing specifications fpr the cable system will who will make up a new cable drawing. STAT be sent Drawing E7469D Drawing E740D shows momentary contact micro switch actuators. These will have to be changed to actuators that maintain the contact of the micro switch once the micro switch has been actuated. This is a similar situation to that described in the above earlier items. Drawing E7539C Drawing E7539C shows two driving motor systems and several sets of micro switches. will have to make a cable drawing and send the new cable and part -7- in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Drawing E7540C There is a further problem of cables and plugs must order two new plugs and sockets; this is, of course, times two for both sides of the Stereocomparator. the cable end sockets and sending it on to Drawing E7639C will hold back one of will manufacture the cable before . The other plugs, etc.; will be send directly The special function potentiometer for the light filter wheel is at least 3 months away. Meanwhile must calibrate the light filter wheel aricIrsuggested that they can do this by the use of -a linear potentiometer and plot the resulting graph for their own purposes. Linear potentiometers will, therefore, be ordered for delivery by about the middle of July and ? and then can install them STAT STAT STAT STAT STAT STAT STAT STAT STAT will have to exchange them later for the final potentiometers. STAT Drawing E7639C Drawing E7639C shows that there are pre-limit micro switches; that is an initial micro switch which is actuated to slow down the servo motor system prior to the final stop load micro switch actuation. In the case of the drawing in question, the pre-limit switch is not necessary because the servo system does not require it. Therefore, there will be no wiring for micro switch number one. This is ture, also, -8- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 [ Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 for the green filter and the diaphragm assemblies in the objective switching nodes of the assemblies. That is, the switching modes are operated by on off motors rather than controlled servo motors. Potentiometer Shafts All potentiometer shafts, with the exception of the 10 turn potentiometers, will be of 1/4 inch diameter instead of the 1/8 inch diameter as shown on the drawings. The 10 turn potentiometers will be 1/8 diameter and these are, therefore, correct as shown by the drawings. STAT Is going to change all STAT their mating parts to accommodate to the 1/4 inch diameter potentiometer; shafts. Drawing E7750C Drawing E7750C shows there must be four limit switches for each side. In this case, the pre-limit, or number one micro switch which is the slowing down lead micro switch, is followed by a pair of micro switches actuated together at the normal shut off point of the assembly and then a final safety shut off micro switch actuation of this cuts off the system and manual return to the operating position is required. Note that all respective contact cams must maintain contact with the micro switches once the micro switch activation has been initiated. -9- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Completion of Part Fabrication has completed all parts of both the glass lenses and the mechanical items. the The main zoom assemblies are fully assembled up to supplied gear reducers and certain other must expedite the gear reducers, etc., so that Main Condenser Lenses STAT supplied parts. STAT can proceed. STAT The main condenser assemblies are in the same situation as the zooms; that is, thersupplied motor, potentiometers and gear reducers so that the assembly can continue. This equipment will be expedited has completed all parts and requires Main Condenser Diaphragm The main condenser diaphragm unit also is missing the 10 turn potentiometers, the gearing and motors. also. Objective Lens Switching must expedite here, The objective lens switching unit containing the objective lenses has been largely assembled. The key parts have been tested -10- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 STAT STAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Including the optical system of objective lenses and it has been found that during focusing and switching the axial alignment is maintained within 1/4 micron. Objective Lens The objective lens optical characteristics have been checked with respect to resolution for various field sizes and positions. kvas pleased to report that the sagittal and tangential resolution obtained with a standard Air Force resolution target supplied gave resolution well within the requirements & the system. This applies, or course, to only the resolution data obtained from the objective lenses. There was no other optical elements in the viewing system during the determination of the resolution characteristics. Identifying Materials The problem of identifying materials sent to still presents a difficult situation In the case of the plugs and receptacles and other material recently sent to there were no tags on these items and Sopelem has difficulty in under- standing which assembly they are for. Slip Ring Receptacle The receptacle on the slip ring does not fit the anamorph drive electronic cable, drawing D6810. -11- S TAT STAT STAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 EDeclassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 k.; t=, 1.1 1=z 1=1 The slip rings were equipped with a female flanged receptacle MS 3102 A28-12S. The cable D6810 is equipped with an MS3106E24-28P plug which does not mate with the slip ring receptacle. Note that on the drawing made by on June 6, 1969, S TAT item 13 does not match the plug on the cable. STAT This plug on the cable must be replaced and STAT have to send an appropriate plug to i11 make STAT the exchange on the cable. The receptacle end of th has STAT cable on it a receptacle with the mark RNK-B23-31SL. Note that there is no identification with respect to the individual wires of the cable and the motor potentiometers, etc., that will be connecting to the slip rings. It will be necessary for to check continuity through the various cables and subwiring harness so that slip rings will maintain continuity. Cable D7901 cable D7901 on the list of June 6, 1969, shows a male plug on one end, NS3106E22-30P. There is no flanged female receptacle that the plug can fit into. Some research is necessary on the part of to determine whether there is an error in the cable or in the mating part. -12- STAT STAT QTAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Fabrication Schedule Many months ago, provided a fabrication schedule for all the mechanical and optical parts. This schedule has been completed and all mechanical and optical parts are completed and in storage awaiting assembly. There is some modification work but this is relatively minor. On the latest PERT chart there are certain stoppages of the assembly work due to changes in the micro switch assembly from momentary to maintained contact. In addition, there is the problem of non delivery of certain of the motors, potentiometers, gear boxes, etc. The assemblies a effected in this manner are #070, #310 and #320. In the case of assembly #230, it is the micro switches only that are effected. Assembly #080 is involved in the new larger drive motor because of the slip ring torque require- ment. Drawing D8650 On drawing D8650, .the 5 cup potentiometer cannot be supplied in time to be effectively used STAT STAT STAT We will, STAT therefore, send them suitable linear potentiometers so that they can perform their optical testing. -13- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24 : CIA-RDP79B00873A001400010006-3 it= opelem _Schedule of Completion There is one fundamental problem with the existing PERT parts at chart for in that there is no slack time. Any delays in and any delays due to technical the job. At this moment, it STAT STAT STAT . securing problems well delay may appears that an additional month will be required at that is, STAT the equipment will be completed by at the end of 1969 STAT Instead of by December 1, 1969.. Component Delivery STAT STAT equires a letter, specifying the date when the individual potentiometers, motors, gear boxes, etc., will be available. This is required for proper planning by assembly work. of their STAT Receiving Record sent fro has processed a receiving record for materials STAT on June 9, 1969. The receiving record has been brought back STAT and has been delivered to the shipping department. -14- S TAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Do 'U 0c) Cio Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 ja. Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 ,Ftil kg, 1:31 PROGRESS REPORT FOR PERIOD ENDING 31 MAY 1969 1.0 PROGRESS DURING REPORTING PERIOD The last layout drawings by outside vendors were received on the video Correlator and the channel selection logic sub- assemblies. The drawings were changed to the Itek format. Assepbly was completed on the remaining printed circuit boards, the meter panel: , the chassis wiring, the image dissector assemblies and the test fixture. The related drawings were adjusted to show changes made during assembly. To correct a clearance problem between the two boards, the locations of the parallax analyzer and the channel selection logic boards were interchanged. The reference designations of the assemblies were changed to A5 and A6, respectively and the interwiring diagram revised for convenience in tracing the circuit wiring. The chassis (with all boards inserted) weighs 63 pounds. Each Image Dissector Assembly weighs 7 pounds. Subassembly tests were completed on all boards before the end of May. However, the start of preacceptance testing was de- layed by the wiring interchange of A5 and A6 mentioned above. The work of introducing,simultaneous scale and skew distortions to the quantitative test slides was started. These slides and the qualitative slides selected are expected to be ready in mid-June. Progress to the end of this reporting period is approximately 90%. STAT STAT 6" Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3I Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 - 2 - 2.0 PLANS FOR NEXT PERIOD Preacceptance testing begins in June. The present schedule projects the acceptance test for the last week in July. Re- grettably, the delays coupled with the necessity for lengthly tests cycles, have made it difficult to accelerate that date as previously expected. 3.0 VISIT STAT On 23 May, STAT visited the facility. Available photographic material was scanned STAT an selected the representative stereoscopic pairs of slides STAT to be used for the qualitative acceptance test. The completed image analysis equipment and the meter panel and test fixture were examined. A discussion of the software submissions followed. In summary, the Operating Manual was satisfactory as it was written; the Maintenance Manual should have a troubleshooting section added similar to the section of Report #68-0002-1 dated 4 January 1968; the test procedures related to response characteristics should be reverted to the linearity requirements and should also incorporate items in the addendum and notations. To avoid future question, the recommendations of were to be repeated in writing. A reminder of this was later sent by The drawings which were completed since the last were available for perusal and were later forwarded visit 1- Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 STAT STAT STAT STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 0 00 ( Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 7 - t= Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 MONTHLY PROGRESS REPORT June, 1969 This technical report is for the reporting periodliom May.1 to May 31, 1969. The report is prepared according to Nuclear Research Instrument Specification number DB1001 (as modified). 1. The computer became available on May 9, and working 2nd shift since then. At the end of the month, subroutines a. CVB b. CVF c. MSGIN d. MSGOUT and e. RECALL were checked out and documented. has been A number of changes in theF7interface logic have necessitated the recoding of subroutine RDOP and changes to subroutines a. EXEC2 b. TRK c. RDST and d. RDCR. At month's end an effort was underway to create a self-loading tape for the real time foreground system which can be used to test the interfaces and demonstrate the servos. Problems with the D/A Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 STAT STAT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Li Li r- converters and a spurious DRLIN pulse have caused to redirect his efforts to another part of the program temporarily. A bug in the Honeywell FORTRAN IV compiler had stopped work on TRK, CAMATS, and FID3. The subroutines had been checked-out on a CDC 6600 computer, however. Ir May the compiler bug was found and corrective action taken. A new subroutine called ASC BIN has been designed, coded and checked-out. This subroutine decodes binary coded decimal info- mation from the ASR-35 into floating point binary. STAT 1 Subroutines CONVRT and DATAIN are being reviewed with a critical eye towards redesign. They have come under scrutiny because of the large amount of core they currently occupy. If they are redesigned then certain coding changes will doubtless propagate to their satellite subroutines NOCAM, PARMOD, SCANER and TBSRCH. Because of this pending redesign, I feel that progress on the project has faltered, and the percent-completed figure remains at last month's 65%. 2. Next month, the review of the non-real time routines will continue. The subroutines affected and the amount of time for each follow: a. CONVRT b. OATAIN c. NOCAM d. PARMOD e. SCANER f. TBSRCH Redesign Checkout 3 days 2 days 3 days 3 days 1 day Z days 1 day 2 days 1 day 2 days 1 day 2 days Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 7 ? Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 r- La r- The total time involved is 20 working days, or one calendar month. Also, work may be done, on an irregular basis on the real-time program to assist with servo and interface checkouts. 3:- At the end of May the problem of how to filter the crosstalk out of the correlator had not yet been resolved. This has a low priority because it is not really clear that crosstalk will even be a problem. STAT 4. Work on the earth-curvature addition to TMAT, the logic to avoid partial derivative blowups, and the "no camera data" alternatives are being deferred during a contract renegotiation; A proposal is now being revised, and should be transmitted before the end I STAT of ,Tune.. 5. It has been orally agreed that for any work-time lost by during the 2nd shift. ill back-charge Informatics employees accompanying Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 is now scheduled to continue working at September 18, 1969. 7. No other unresolved matters are known to exist. until STATT Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 L, Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 r- LJ Li ALPHABETICAL SUBPROGRAM INDEX General Subprogram Flow Diagram Page 8 Name sj v V ', CAMATS 118-123 Asc-1:31_1\) CONVRT 44 / CVB 130,131 132,133 DATAIN 27-31 / V EXEC I 17-19 ?-/ v. EXEC 2 20-25 OCINA62 151 EX3K3 1:.-r5'T15-6- 1 V `7 FID I 56-58 / V FID 2 59762 ,/ ,/ / Ft0 7 FIXR 157,158 GTP 80-82 V. LSTC/PSET 145,146 ,--. V / / MATMAK 127-129 MSGIN 147,148 V '/-MSGOUT 149-151 V / V MTS 100-104 NOCAM 41-43 'PARMOD 32-35 PRESET Name Page No. 105-111 140-142 143,144 RECALL 66-68 RECIN 45,46 vf REORT 83-88 SCANER 39,40 S TAG IN 49-55 TBSRCH 36-38 TIC T 134-136 TICX 137-139 v TMAT 89-99 69-79 63-65 TTIN 47,48 T 2 PAN 112-115 -r zsi-Rp XMX I 124-126 >CAI YMR 116,117 C as,-JA-A D cSt-0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24 : CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3 Declassified in Part - Sanitized Copy Approved for Release 2012/08/24: CIA-RDP79B00873A001400010006-3