STATUS REPORT FOR PERIOD 1 NOVEMBER THROUGH 30 NOVEMBER 1969 U.S. GOVERNMENT CONTRACT(SANITIZED)
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP79B00873A001300010020-8
Release Decision:
RIPPUB
Original Classification:
K
Document Page Count:
35
Document Creation Date:
December 28, 2016
Document Release Date:
August 29, 2012
Sequence Number:
20
Case Number:
Publication Date:
November 1, 1969
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP79B00873A001300010020-8.pdf | 864.55 KB |
Body:
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
0
0
0
0
0
El
0
a
ci
0
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
14.
STATUS REPORT
for Period
1 NOVEMBER through 30 NOVEMBER 1969
U S . Government
File No. 11038
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
STATI
n
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
This document is presented as the Monthly
Status Report under Contract to the U. S.
Government,
The report period represented herein covers
the period 1 November through 30 November 1969.
2
E
STAT
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
L
INDEX
'I
D
E
E
2
D
E
Page
Program
Task 1
Task 2
Task 5
Task 6
Task 11
Task 12
Task 13
Status Summary
Statements of Work, Specifications,
Scheduling and Planning
Meeting s
Facilities Requirements
Stage Drives
Film Drive and Transport System
Film Platen and Film Clamping
Tasks 16,
17 & 18
Task 22
Task 23
Task 24
Task 29
Task 32
Task 33
Task 34
Task 36
Task 37
Task 42
Task 43
Task 47
I
Report Preparation Tl 1
T2 - 1
T5-1
T6-1
TI1 1
T12- 1
T13-1
Optics
Interferometer Assembly
Optics Drive Assembly
Image Analysis System
Cabling
Computer
Electronic Racks and Control Cabinets
Utilities, Vacuum and Air Systems
Overall Assembly
Electrical Noise Suppression
Breadboards and Test Devices
Computer Programming and Services
Instruction Manual and Drawing Submittal
T16, 17&18-1
T22 - 1
T23 - 1
T24-I & 2
T29 - 1
T32-1
T33 I
T34 - 1
T36 - 1
T37 - 1
T42-1
T43-1
T47 - 1
t' Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
'J
0
r
7
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Outline - Operating Instructions Manual Appendix I
Progress Report - for period ending
October 31, 1969
Appendix II
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
PROGRAM SUMMARY
Scheduled Percentage of Completion 79.9%
Actual Percentage this Date 75.5%
The stage drive systems are complete. However,
the laser interferometer systems are still not available as the
lasers. failed in storage atndue to helium gas diffusion and
the repaired laser systems have not yet been received back from
the manufacturer
The electronic logic systems have been checked
out and are satisfactory.
The acceptance testing for Image Analysis Equipment,
manufactured slipped from 11/17/69 as
scheduled in October, to December 19, 1969. Howeyer, =is
presently reviewing test program and there is no possibility
that the tests can occur during December because of the time
required for mutual agreement between
procedures.
The January 12, 1970, schedule for optical acceptance
tests at the optical subcontractor's plant
has been deferred
from January 12, 1970, to a later date not yet established. This is
d,ue to technical difficulties with certain of the reticle and illumination
system subassemblies during their preacceptance testing by the
optical subcontractor.
An interim rough draft of the Operating Instructions
Manual has been prepared, and the outline appended (App. I).
STAT
STAT
STAT
STAT
STAT
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
TASK 1
STATEMENT OF WORK, SPECIFICATIONS,
REPORT PREPARATION
Scheduled percentage of completion
Actual percentage this date 87%
This Status Report has been prepared and submitted
In the future, if preparation and submittal of the
Monthly Status Report on schedule is the only activity under this
Task, the Task will be omitted.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
SCHEDULING AND. PLANNING
Scheduled percentage of completion 87%
Actual percentage this date 87%
Discussion of re-scheduling related to subcontractor
activity appears in this report under the appropriate Task heading.
The monitoring visit to~ remains
ESTAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
MEETINGS
Scheduled percentage of completion 87%
Actual percentage this date 87%
n
Technical presentations and status reports were
made to four groups of customers on the following dates:
November 4, 1969, a- different group on
November 5, 1969, and two groups on November 20, 19.69.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
is Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
FACILITIES REQUIREMENTS
Scheduled percentage of completion
Actual percentage this date
D
n
E
Report arrived atl during the report period. Tests of its effect STAT
on the temperature control, system and air flows are being conducted.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
TASK 11
Scheduled percentage of completion
100%
Actual percentage this date
90%
The stage drive rate loop design is essentially
complete. Both stages are operating under velocity control,
and the breakaway torque and running friction problem referred
to in the last Status Report appears to have been remedied.
As soon as the lasers are returned to=final position loop
design will be completed. When this is accomplished this Task
will be finished.
Til -1-
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
TASK 12
FILM DRIVE AND TRANSPORT SYSTEM
Scheduled percentage of completion 100%
Actual percentage this date 80%
Testing and adjustment of the film drive. and transport
system with the pneumatic liftoff and clamping apparatus is continuing.
Final compensation for the reel servo systems has been
completed and appears to be satisfactory.
Work is proceeding on the capstan rate loop compensation
in order to provide precise control of film motion. at low speeds. A
non-linear network is being designed which provides wide loop band-
width for small displacements of the film, (to allow precise film
positioning on the platen) with reduced bandwidth at higher velocities,
(to eliminate excess stresses on the film when slewing). This work
should be completed during December.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
FILM PLATEN AND FILM CLAMPING
Scheduled percentage of completion
Actual percentage this date 93%
Checkout of the film platen and film clamping system
is proceeding, in conjunction with the work mentioned under Task 34
in this report.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
TASKS 16, 17 & 18
VIEWING OPTICS, VIEWING ILLUMINATION
RETICLE PROJECTOR and ILLUMINATION
Scheduled percentage,of completion 91%
Actual percentage this date 90%
. 2
The optical fabricator has found technical discrepancies
during performance testing of certain of the optical subassemblies.
Included are the main illumination condenser zoom,
reticle lOX zoom, and reticle anamorph.
Preliminary information indicates the problem is due to
image wander during operation of the subassemblies. This problem is
presently being investigated by the optical subcontractor.
A delay is anticipated in theElacceptance tests STAT
presently scheduled for January 1970, until the problems are solved.
T16, 17&18-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Scheduled percentage of completion
Actual percentage this date 70%
The last status report stated that the laser assemblies
and power supplies were returned to
adjustment of the plasma tubes
equipment would be returned to
for replacement and STAT
report period, but it
was not. They now estimate that the equipment will react during
December, at which time work can commence on the measuring system.
_0
STAT
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Scheduled percentage of completion
98%
Actual percentage this date
90%
Checkout of the complete servo system is complete.
All components in the system appear to be performing satisfactorily.
This Task is essentially complete until the optics are received from
the .optical subcontractor.
a
T23-1
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
IMAGE ANALYSIS SYSTEM
Scheduled percentage of completion 95%
Actual percentage this date 95%
days a to discuss the progress of the image analysis system.
In lieu of a trip report, the results of that meeting are
included in this disucssion
During the meeting with it was found that the
image analysis system appears generally to perform satisfactorily.
Some of the minimum performance requirements, however, have not
been met. A particular area of difficulty lies in the correlation quality
signal which indicates to the computer system whether or not the imagery
is satisfactory for analysis by the system. Several methods of improving
the operation of.the equipment were suggested but the problem
is as yet unresolved.
A new and abbreviatedE] test procedure was given to
the nrepresentatives in a partially complete rough draft to be brought
back to I Ifor study. Such study by
personnel has led to the con-
STAT
STAT
STAT
STAT
STAT
STAT
STAT
clusion that in many areas the test procedure is unsatisfactory as written,
and a revised test procedure is being generated at nfor discussion with STAT
STAT
T24-l
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
was requested to make a formal rough draft submittal
Additionally, the five pairs of stereo slides for qualitative
greatly from the procedure originally submitted
of their modified test procedure because the rewritten procedure differed
testing of the instrument (to be furnished
for approval.
STAT
STAT
have not been submitted STAT
STAT
The predistorted slide pairs to be used for quantitative
testing of the instrument (also to be furnished
have been agreed
upon for image content, but the distortions introduced into the slides for
Delivery of the image analysis system was rescheduled
Specification No, 10. This matter is being discussed
impossible to test the single distortion cross-talk requirement per
test purposes are, inthe opinion of personnel, unsatisfactory in
several areas. The principal difficulty is that no slides have been pro-
vided which contain only single first-order distortions, thus making it
STAT
STAT
STAT
STAT
to December 19, 19 69 , but in view of the extensive changes STAT
r.
required in the test procedure and the possibility of having to make new
test slides, it appears doubtful that will be ready for acceptance
testing at that date.
Progress Report for the period appears in
Appendix II.
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
CABLING
Scheduled percentage of completion 98%
Actual percentage this date 97%
A few cables associated with the illumination system
0
G
. 2
remain to be fabricated. This work should be accomplished during
December.
One extra cable between Rack 3 and the control
console was added in order to implement the multiple light level
system incorporated in the data recording pushbuttons.
It is expected that this task will be completed during
December.
d Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
No further systematic difficulties have been found
in the machine, technicians are continuing to keep the operation
log mentioned in the last status report.
It was found necessary, during this report period, to
replace the type box in the ASR 35 teleprinter. Additionally, a new
set of punches and. dies have been ordered for the high speed paper
tape punch, since the volume usage of this equipment during the
programming effort has caused it to wear out.
Scheduled percentage of completion 100%
Actual percentage this. date 100%
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
U Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
ELECTRONIC RACKS AND CONTROL CABINETS
. Scheduled percentage of completion 98%
Actual percentage this date 98%
E4
Noise and transmission losses in the digital logic
system continue to be decreased by appropriate adjustments in the
electronics cabinet #3 wiring.
This Task is substantially complete.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
UTILITIES, VACUUM AND AIR SYSTEMS
Scheduled percentage of completion
.95%
Actual percentage this date
93%
Testing of valves, pressure switches, and air control
solenoids is nearly complete. The installation of larger compressed
air lines mentioned in the previous report has been. completed.
The adjustment of the trip points for the alarm failure
sensors is essentially complete.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Scheduled percentage of completion
.85%
Actual percentage this date
57%.
Systematic testing of the digital logic interface is
nearly complete. All of the digital logic associated with manual modes
of operation of the Stereocomparator has been tested and found to be
satisfactory. Also, the digital logic associated with computer operation
of the machine has been tested and is 1ow operational.
The remaining work to be done on this area consists of
reducing noise levels in a few logic lines, and it is expected that this
work will be completed in the next report period.
It was found necessary to move the current driver circuit
boards for the IBM 526 Card Punch out of the output interface logic drawer
into the punch control chassis proper. This move, combined with a
reharnessing of the punch control chassis, has reduced electrical noise
interference from the card punch system to acceptable levels. A small
amount of electrical noise suppression is being performed on the IBM
Card Punch itself, and it is contemplated that all of this work will be
finished within the next report period.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
E~ Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
ELECTRICAL NOISE SUPPRESSION
Scheduled percentage of completion
75%
Actual percentage this date
65%
Systematic elimination of internally generated cross-
talk and spurious switching signals continues. The specific steps
being taken are described under other Tasks in this report (Tasks 32,
33, etc.).
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
Ll Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
TASK 42
BREADBOARDS AND TEST DEVICES
Scheduled percentage of completion 920/,
Actual percentage this date 80%
The test panel to be used in the optical acceptance
-test at Sopelem, and described in the last status report, is complete.
The switching panel mentioned in the previous report
has been constructed and tested.
These two major assemblies, plus a dual voltage high
current servo amplifier and associated cable, have all been shipped
to Sopelem. With this equipment it will be possible to test the optical.
system under rate loop control which will allow precise setting of the
optical elements during the acceptance test.
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
L Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
COMPUTER PROGRAMMING AND SERVICES
a
U
Scheduled percentage of completion 80%
Actual percentage this date
80%
No further work has been performed by the STAT
programmer due to the fact that a point has been reached in the pro-
gramming effort at which further software preparation is dependent
on completion of the measuring system,
is continuing to evaluate the transfer function of
the^correlator outputs through the computer processing to the
optics drives. The results obtained thus far are not conclusive, but
indicate that a software automatic gain control subroutine may be
required to maintain optical servo loop stability over the entire range
of optics parameters. The variable-gain characteristics of the
rectangular-to-polar-coordinate conversion required to change the first-
order scale and skew signals, from the correlator into corresponding
magnification, rotation, and anamorph corrections appear in the optics
drive loops. It is necessary to be'certain that at low gains sufficient
accuracy is maintained, while at high gains, servo overshoots and
inability are avoided through proper software control,
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
TASK 47
INSTRUCTION MANUAL AND DRAWING SUBMITTAL
Scheduled percentage of completion
40%
Actual percentage this date
410%
During this report period, an interim rough draft
of the.Operating Instructions Manual was prepared. An outline is
appended (Appendix I).
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
G
0
a
.0
0 Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
11/13/69
OUTLINE
OPERATING INSTRUCTIONS MANUAL
JOB 342
ji
..Introduction
Purpose of the , Manua 1
Scope of the Manual
C. Organization of the Manual
II .. Summary of Ste.reocomparator System Operation
A. Capabilities
1. Achieved by three component groups
a. Measuring engines
Optica 1 train
Control elements
.Discussion of measuring engines
1. Monolithic granite block
Granite tee
Top stage
4. Threadless leadscrew
5. Imagery drive units
6. Film, platen and vacuum-clamping system
7. Light table
8. Laser-interferometer
9. Summary
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
0 1
Discussion of optical train
1. Optical. bridge
a. Viewing zoom tens
Ana morph
d'. Image rotator
-2. Binocular Eyepiece
a. High-speed safety shutters
a
0
3. Reticle dot
4. Additional components
5. Summary
Discussion of the control group
STEREOC'OMPARATOR Specifications
U
0
a
0
F. Glossary of terms
III. Operation Controls
A. Control console
1. Nixie tubes
2. Read-out windows
3.. Nixie tube pushbuttons
4. Correlator parallax potentiometers and meters
Platen illumination
Anamorphic
Zoom
Objective changeover
Control knobs
Page 2
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
U Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
Page 3
f
Focus
Joystick
Tra ckba l is
a
a
0
Specific Operations with the STEREOCOMPARATOR
A'. Power on sequence
Main control pushbuttons
8. Imagery drive lever
Image
Reticle
Warning/Indicator buttons (8)
Operator communication with computer (28)
Mechanical adjustments (18)
Mode selection (3)
:. Customer mensuration programs (16)'
Cabinets,- computer, teletypewriter '
Binocular. eyepiece
1. Parallax
2. Tilt
Up-loading the imagery '
C. Up-loading the computer
D. Establishing stereo Auto. with Electronic Correlator mode
E Establishing stereo -. Auto without Electronic Correlator mode
F. Auto stereo scanning
Mensuration
Stage control summary
I. . Optics control.summary
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873A001300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
J
G
PROGRESS REPORT FOR PERIOD ENDING 31 OCTOBER 1969
PROGRESS DURING REPORTING PERIOD
The wiring clean up and a workmanship inspection were completed on the
Image Dissector assemblies, the chassis and a number of the printed
circuit boards.
Drawings were updated to include all.changes that were made to the
E
system after the sub-assembly test. I
The system was tested to determine its essential characteristics.
The coefficients of the first order outputs required readjustments and
were set to their previously established values. The parallax error
scale factors were changed to 3.33 volts/mm. A change in the dimension
of the scanning pattern from a 12mm to a 16mm diagonal to derive more
information from the slides necessitated a change in the coefficient -
determining resistors. The above setting is intended to enlarge the
pull in range and did not appear to be inconsistent with the minimum
callout of item 1OE1 ofn Specification No. 10.
PLANS FOR NEXT PERIOD
During the remainder of November the procedural aspects of the acceptance
tests should be resolved and the test procedure resubmitted for
.approval. The procedures will be revised to reflect the. new correspondence-
test for multiple errors and notations relative to image quality.
Testing will be continued to check out procedures as well as to'avoid
test problems associated with orientation and content of imagery on the
test slides.
STAT
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8
RI
0
0
0
0
e
visited
on November 13 and 14. They were given a general
briefing on the equipment and its performance. On both days they
inspected and operated the equipment to obtain a private assessment of
its operation and the problems inherent in testing the equipment. They
were shown the results of the preacceptance testing, and the equipment
performance was discussed relative to the performance of theElequip-
ment. The proposed alternation to the test procedures.was reviewed and
the resubmission suggested.
STAT
STAT
STAT
STAT
Declassified in Part - Sanitized Copy Approved for Release 2012/08/29: CIA-RDP79B00873AO01300010020-8