MINUTES OF THE GEOGRAPHIC AREA STAFF MEETING, 24 JANUARY 1955.

Document Type: 
Collection: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79-01096A000200050028-9
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
2
Document Creation Date: 
November 9, 2016
Document Release Date: 
July 21, 1998
Sequence Number: 
28
Case Number: 
Publication Date: 
January 24, 1955
Content Type: 
MIN
File: 
AttachmentSize
PDF icon CIA-RDP79-01096A000200050028-9.pdf121.98 KB
Body: 
Approved For Release 1999/09/21 : CIA-RDP79-01096AO00200050028-9 MINUTES Cr GEOGRAPHIC AREA STAFF MEETING, 24 JANUARY 1955. 25X1A9a 1. read to the group the Geographic Area production statistics for the calendar year 1954 from the St/PC Statistical Summary of CPR production. Comparisons were made of production in various categories of the Geographic Area and the Economic Area. It was agreed that the MR.production of five issues in 12 months was too low, and 25X1A9a plans to increase the MR effort as much as possible. 25X1A9a 2. commented on the recent memorandum sent 25X1A9a to ATIC, accompany ng a prepublication copy of report ER-11. 25X1A9a commiented that such correspondence requires the signature of e r Division Chief, Area Chief, or the AD/RR. 25X1A9a 3. read aloud a draft of a staff study on the Urban Area Research Program. DD/P, during the last year, has presented requirements for detailed maps and text studies of a large number of urban centers within the Soviet Orb. Possibilities of contracting with the Air Force or Army for the production of studies has been explored during the past year. Current DD/P requirements are for a total of 300 studies at a rate of 50 studies per year. The Air Force has estimated that it could produce 50 studies per year for $485,000 per year, while the Army has estimated $500,000 per year. The group discussed problems of meeting these DD/P requirements either through contract or by establishing an Urban Area facility within the Geographic Area. It was agreed that the studies could be produced more cheOs b the Geographic Area than under contract to the Air Force or Army. p wonted an estimate of $402,000 per 25X1A9a year for a separate on voted to Urban Area Research with a T/O of 58 persons, including $25,000 per year for cost of supplies and equipment. It was agreed that a CIA facility would be more adaptable to the needs of DD/P than a contract facility. It is anticipated that a production copy satisfactory to DD/P could only be developed over a long period and that this process of development would be made more difficult if an external contractor were involved. The desirability of proceeding at a medium pace during the shakedown period was agreed to by the group. It was decided that the best approach would be to first set up a small unit in Cartography and possibly a separate unit in Geography to concentrate on Urban Area research. This would be followed by recruiting and processing of new personnel to the gradually increased production of Urban Area studies as organizational needs and final criteria for the studies were developed. (7 V Iwo A'~S! F: _372044 Approved For Release 1999/09/21 : CIA-RDP79-01096A000200050028-9 Approved For Release 1999/09/21 : CIA-RDP79-01096AOO0200050028-9 that the Ms Library has had too many surveys k . t week with 25X1A9a felt that such outside surveys should be deterred puss . 25X1A9a 25X1A9a 5. - reported that Colonel Pettit of JCS will be in charge tion to the UN Cartographic Conference at Dehra Dun, India. 25X1C4a 25X1A9a 25X1A9a conferred last week with of NEA concerning ?5X1A9a schedule, and it appears that no ma or c es will be necessary. 25X1A9a 8. reported on his further bax Despatch 25X1A9a requesting of Northern La d met with Ar~r,and 25X1A9a Air representatives last week and d scussed the situation with plans to send an CM to the 25X1A9a the State Department Desk Officer_"iso Embassy in Laos saying that the matter is now under consideration. 25X1A9a 10. 25X1A9aof M I commented that D/GL, Charge Desk, has not been notified departure, as it should have been. 25X1A9a 11. commented that he received a request from TSS for construction of a City Plan. The request apparently was transmitted out of normal channels. 25X1A9a advised that the Inter Agency Group on Ground 12. Intelligence Photograp will have another meeting this Thursday, MMW January 27, in "N" Building. W f yy. 17J Approved For Release 1999/09/21 : GIA-RDP79-01 96AOOD200050028-9