RAIL BRIDGE BY-PASS DAI LOI NORTH VIETNAM

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP79-00849A000100060006-1
Release Decision: 
RIPPUB
Original Classification: 
C
Document Page Count: 
3
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 7, 2008
Sequence Number: 
6
Case Number: 
Publication Date: 
July 5, 1966
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP79-00849A000100060006-1.pdf118.52 KB
Body: 
Approved For Release 2008/02/07 : CIA-RDP79-00849A000100060006-1 LUNrIUtN I IAL (c) ATIONAL PHOTOGRAPHIC INTERPRETATION CENTER RAIL BRIDGE BY-PASS DAI LOI, NORTH VIETNAM 2115N 10541E ATTACHMENT TO L-1112 05 JULY 1966 PAGE 1 1. SIGNIFICANCE: THIS BRIEFING BOARD REVEALS A NEW RAIL BRIDGE BY-PASS ADJACENT TO THE HA NOI/LAO CAI RAIL LINE AND THE DAI LOI RAIL BRIDGE OVER SONG CA LO (RIVER) 2. LOCATION: THE NEW BRIDGE BY-PASS IS LOCATED IN CENTRAL NORTH VIETNAM, BETWEEN PHUC YEN AND VIET TRI, SEVENTEEN NM NORTHWEST OF HA NOI. 3. REMARKS: THE HA NOI/LAO CAI RAILROAD IS AN IMPORTANT LINK BETWEEN HA NOI AND WESTERN CHINA, AND THE NORTH VIETNAMESE HAVE EXPENDED CONSIDERABLE EFFORT TO KEEP THE LINE OPEN. REVEALS A METER GAUGE RAIL LINE BY-PASS BRIDGE ADJACENT TO THE DAI LOI RAILROAD BRIDGE OVER THE SONG CA LO (RIVER). THE BY-PASS BRIDGE RUNS PARALLEL TO THE HA NOI/LAO CAI RAIL LINE AND TERMINATES ON EITHER SIDE OF THE SONG CA LO (RIVER) IN TWO 2-TRACK These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re. porting period as indicated by the date of issue. For information concerning these notes contact Chief Collateral Support Division, NPIC. POIIP I I.....,,,..1. H~nP~dlnP mJ I~vls~~Il~~e~len CONFIDENTIAL Approved For Release 2008/02/07 : CIA-RDP79-00849A000100060006-1 Approved For Release 2008/02/07 : CIA-RDP79-00849A000100060006-1 CONFIDENTIAL (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER REFERENCES: ATTACHMENT TO L-1112 05 JULY 1966 PAGE 2 TRANSLOADING YARDS AT UTMs WJ715509 AND WJ722505. THE BY-PASS BRIDGE APPEARS TO BE OF TEMPORARY CONSTRUCTION, HAVING MINIMAL RAIL SUPPORTS, AND PROBABLY IS CAPABLE OF HANDLING SINGLE AND/OR LIGHTER RAIL CARS WITH TRANSLOADING OPERATIONS REQUIRED AT EACH END. BOTH BRIDGES ARE SERVICEABLE. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only far the re porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. CONFIDENTIAL Approved For Release 2008/02/07 : CIA-RDP79-00849A000100060006-1 r"Approved For Release 2008/02/07 : CIA-RDP79-00849A000100060006-1 KAIL DKIL Ut D i -rA33 DAI LOI, NORTH VIETNAM 21-15N 105-41E dESSICASM wnm k ME JX Wl~ 7X ENLARGEMENT 25X1 i