NEW CONSTRUCTION LAUNCH COMPLEX B, SHUANG-CHENG-TZU MISSILE TEST CENTER, CHINA
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05929A002700070002-3
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
4
Document Creation Date:
December 28, 2016
Document Release Date:
November 20, 2006
Sequence Number:
2
Case Number:
Publication Date:
August 21, 1967
Content Type:
REPORT
File:
Attachment | Size |
---|---|
![]() | 120.84 KB |
Body:
TOP SECRET I I
21 August 1967
Page 1.
Copy 65
REFERENCE T0: NEW CONSTRUCTION
LAUNCH COMPLE B, S HUANG- CHENG-TZU MISSILE TEST CENTER, CHINA
SHUANG-CHENG-TZU MISSILE TEST CENTER IS LOCATED
APPROXIMATELY 50 NM NE OF SHUANG-CHENG-TZU AT
4107N - 10020E.
LAUNCH COMPLEX B IS THE LARGEST RESEARCH AND
DEVELOPMENT TYPE LAUNCH FACILITY IN CHINA, IT
WAS CONSTRUCTED IN APPROXIMATELY 16 MONTHS:
AUGUST 1965 - DECEMBER 1966.
These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use
should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re-
porting period as indicated by the date of issue For information concerning these notes contact Chief, Collateral Support
Division, NPIC.
TOP SECRETIrzreeeroecrrs
Approved For Release 2006/11/20: CIA-RDP78T05929A
.; ; TOP SECRET
Attachment to
21 Auo st 19 7
Page 2
8. DIMENSIONS/
SPECIFICATIONS: NONE
9. MISSION READOUT: A PORTION OF THE RAIL SPUR SERVING LAUNCH COMPLEX B
HAS BEEN REMOVED JUST NORTHEAST OF THE RAIL-TO-GANTRY TRANSFER POINT AND
A LARGE EXCAVATION, APPROXIMATELY 200 X 100 FT, HAS BEEN DUG AT THIS
OFF THE EXISTING SPUR AND IS PARTIALLY COMPLETE TO THE AREA NORTHWEST OF
THE EXCAVATION. PRELIMINARY GRADING IS VISIBLE TO A POINT WEST OF THE
CONTROL BUNKER. A NEW UNIDENTIFIED LINEAR SCAR RUNS NORTHWEST FROM
THE AREA OF THE EXCAVATION FOR APPROXIMATELY 0.5 NM, NEW TRENCHING
POSSIBLY FOR CONDUITS OR BURIED PIPELINES IS VISIBLE EAST OF THE LAUNCH
FACILITY.
26
25
These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use
should be restricted to the particular briefing boar (s) they were prepared for and must be considered valid only for the re-
porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support
Division, NPIC.
TOP SECRET
Approved For Release 2006/11/20 : CIA-RDP78T05929A
NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER
LAUNCH CUMPLEX B, SHUANG-CHENU-TZU MISSILE TEST CENTER, CHINA
41-15N 100-18E
25X1
2 ?x1
L-,;=- - --EHE3] iml