POSSIBLE ABM SUPPORT FACILITY BOROVSK, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05929A002600030005-5
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 20, 2006
Sequence Number: 
5
Case Number: 
Publication Date: 
June 16, 1967
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05929A002600030005-5.pdf143.1 KB
Body: 
Approved I I 6/11/20: CIA-RDP78TO5929A00 5-5 TOP SECRET 2X Attachment t 25X 1 June 19 7 Page 1 Copy 1. SI^NIFICANCE: 2. LOCATION: 3. REMARKS: 4. COLLATERAL: 5. FIRST IDENTIFICATION: 6. NEGATION DATE: CONSTRUCTION BEGAN ON THE ABM LAUNCH COMPLEXES. CONSTRUCTION OF THE FACILITY CONTINUED AT A STEADY PACE UNTIL LATE 1964/EARLY 1965, WHEN CONSTRUCTION ACTIVITY DECREASED AND APPEARED TO STOP. IN 1966, CONSTRUCTION WAS RENEWED ON THE FACILITY AND CON- SIDERABLE PROGRESS IS NOTED ON THIS MISSION. POSSIBLE ABM SUPPORT FACILITY BOROVSK, USSR These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. I-Ea TOP SECRETS Approved For Release 2006/11/20 : CIA-RDP78TO5929A0( 2 Approv T 6/11/20 : CIA-RDP78T05929A0 0005-5 TOP SECRET Attachment to 25X 1 June 19 Page 2 8. DIMENSIONS SPECIFICATIONS: ALL DIMENSIONS ARE APPROXIMATE. 25X These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information Division, NPIC TOP SECREl Approved For Release 2006111(20: CIA-RDP78T05929A0 2 9A0 Approved Eor Release 6/11/20 : CIA-RDP78T05929A00 05-5 TOP SECRET[ Attachment to 25X 1 June 19 7 Page 3 BUILDING MEASURING APPROXIMATELY 560 IGH, A MISSILE RECEIVING/ 25X ASSEMBLY/CHECKOUT BUILDING MEASURING APPROXIMATELY 185 X IGH, 25X II 10 ADDITIONAL BUILDINGS, A STEAM PLANT, AND 2 PROBABLE EARTH-MOUNDED TANKS ARE ALSO LOCATED WITHIN THE SECURED AREA. EARTH SCARRING AND CONSTRUCTION ACTIVITY ARE UNDERWAY AT VARIOUS LOCATIONS THROUGHOUT THE FACILITY. TWO POSSIBLE GALOSH MISSILE CANISTERS, PROBABLY WITHOUT THEIR PRIME MOVERS, ARE PARKED ON THE WEST SIDE OF THE MISSILE STORAGE BUILDING. THE POSSIBLE CAN- ISTERS MEASURE APPROXIMATELY I N LENGTH AND 10 FEET IN WIDTH. THE 25X SUPPORT AREA APPEARS TO BE DIVIDED INTO 3 AREAS. THE FIRST, WHICH APPEARS PREDOMINANTLY RESIDENTIAL, CONTAINS 4 COMPLETED MULTISTORY APARTMENT-TYPE BUILD- INGS, 3 MORE IN VARIOUS STAGES OF CONSTRUCTION, ONE ADDITIONAL BUILDING, AND A PROBABLE SEWAGE TREATMENT FACILITY. A SECOND AREA, WHICH APPEARS TO BE AN ADMINISTRATIVE AREA, WITH POSSIBLY SOME MECHANICAL OPERATIONS TAKING PLACE, CONTAINS 2 MULTISTORY APARTMENT-TYPE BUILDINGS, A U-SHAPED PROBABLE ADMIN- ISTRATION BUILDING UNDER CONSTRUCTION, AND 6 ADDITIONAL MAJOR BUILDINGS. THE THIRD AREA CONTAINS 16 GABLE-ROOFED BUILDINGS AND SEVERAL SMALLER BUILDINGS/ STRUCTURES. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief. Collateral Support Division, NPIC. TOP SECREA0 IbuuU0IIUQ55 Approved For Release 2006111/20: CIA-RDP78T05929 25X Attachment to 7 25X June 9 Page 4 TOP SECRETI Approved For Release 2 00611 1 12 0 : CIA-RDP78T05929AOd These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing hoard(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. POSSIBLE ABM SUPPORT FACILITY BOROVSK, USSR 55-18N 36-33E 0