POSSIBLE ABM SUPPORT FACILITY BOROVSK, USSR
Document Type:
Collection:
Document Number (FOIA) /ESDN (CREST):
CIA-RDP78T05929A002600030005-5
Release Decision:
RIPPUB
Original Classification:
T
Document Page Count:
6
Document Creation Date:
December 28, 2016
Document Release Date:
November 20, 2006
Sequence Number:
5
Case Number:
Publication Date:
June 16, 1967
Content Type:
REPORT
File:
Attachment | Size |
---|---|
CIA-RDP78T05929A002600030005-5.pdf | 143.1 KB |
Body:
Approved I I 6/11/20: CIA-RDP78TO5929A00 5-5
TOP SECRET
2X
Attachment t 25X
1 June 19 7
Page 1
Copy
1. SI^NIFICANCE:
2. LOCATION:
3. REMARKS:
4. COLLATERAL:
5. FIRST IDENTIFICATION:
6. NEGATION DATE:
CONSTRUCTION BEGAN ON THE ABM LAUNCH COMPLEXES.
CONSTRUCTION OF THE FACILITY CONTINUED AT A STEADY
PACE UNTIL LATE 1964/EARLY 1965, WHEN CONSTRUCTION
ACTIVITY DECREASED AND APPEARED TO STOP. IN 1966,
CONSTRUCTION WAS RENEWED ON THE FACILITY AND CON-
SIDERABLE PROGRESS IS NOTED ON THIS MISSION.
POSSIBLE ABM SUPPORT FACILITY
BOROVSK, USSR
These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use
should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re-
porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support
Division, NPIC.
I-Ea TOP SECRETS
Approved For Release 2006/11/20 : CIA-RDP78TO5929A0( 2
Approv T 6/11/20 : CIA-RDP78T05929A0 0005-5
TOP SECRET
Attachment to 25X
1 June 19
Page 2
8. DIMENSIONS
SPECIFICATIONS: ALL DIMENSIONS ARE APPROXIMATE.
25X
These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use
should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re-
porting period as indicated by the date of issue. For information
Division, NPIC
TOP SECREl
Approved For Release 2006111(20: CIA-RDP78T05929A0 2
9A0
Approved Eor Release 6/11/20 : CIA-RDP78T05929A00 05-5
TOP SECRET[
Attachment to 25X
1 June 19 7
Page 3
BUILDING MEASURING APPROXIMATELY 560 IGH, A MISSILE RECEIVING/ 25X
ASSEMBLY/CHECKOUT BUILDING MEASURING APPROXIMATELY 185 X IGH, 25X
II
10 ADDITIONAL BUILDINGS, A STEAM PLANT, AND 2 PROBABLE EARTH-MOUNDED TANKS
ARE ALSO LOCATED WITHIN THE SECURED AREA. EARTH SCARRING AND CONSTRUCTION
ACTIVITY ARE UNDERWAY AT VARIOUS LOCATIONS THROUGHOUT THE FACILITY. TWO
POSSIBLE GALOSH MISSILE CANISTERS, PROBABLY WITHOUT THEIR PRIME MOVERS, ARE
PARKED ON THE WEST SIDE OF THE MISSILE STORAGE BUILDING. THE POSSIBLE CAN-
ISTERS MEASURE APPROXIMATELY I N LENGTH AND 10 FEET IN WIDTH. THE 25X
SUPPORT AREA APPEARS TO BE DIVIDED INTO 3 AREAS. THE FIRST, WHICH APPEARS
PREDOMINANTLY RESIDENTIAL, CONTAINS 4 COMPLETED MULTISTORY APARTMENT-TYPE BUILD-
INGS, 3 MORE IN VARIOUS STAGES OF CONSTRUCTION, ONE ADDITIONAL BUILDING, AND A
PROBABLE SEWAGE TREATMENT FACILITY. A SECOND AREA, WHICH APPEARS TO BE AN
ADMINISTRATIVE AREA, WITH POSSIBLY SOME MECHANICAL OPERATIONS TAKING PLACE,
CONTAINS 2 MULTISTORY APARTMENT-TYPE BUILDINGS, A U-SHAPED PROBABLE ADMIN-
ISTRATION BUILDING UNDER CONSTRUCTION, AND 6 ADDITIONAL MAJOR BUILDINGS. THE
THIRD AREA CONTAINS 16 GABLE-ROOFED BUILDINGS AND SEVERAL SMALLER BUILDINGS/
STRUCTURES.
These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use
should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re-
porting period as indicated by the date of issue. For information concerning these notes contact Chief. Collateral Support
Division, NPIC.
TOP SECREA0
IbuuU0IIUQ55
Approved For Release 2006111/20: CIA-RDP78T05929
25X
Attachment to 7 25X
June 9
Page 4
TOP SECRETI
Approved For Release 2 00611 1 12 0 : CIA-RDP78T05929AOd
These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use
should be restricted to the particular briefing hoard(s) they were prepared for and must be considered valid only for the re-
porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support
Division, NPIC.
POSSIBLE ABM SUPPORT FACILITY
BOROVSK, USSR
55-18N 36-33E
0