ZAGORSK ROCKET ENGINE TEST FACILITY KRASNOZAVODSK, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05929A002600010006-6
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 20, 2006
Sequence Number: 
6
Case Number: 
Publication Date: 
June 7, 1967
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05929A002600010006-6.pdf173.51 KB
Body: 
Approved For Release 2006/11/20: CIA-RDP78TO592 6869658 TOP SECRE Attachment tI Page 1 Copy 5 8 ZAGORSK ROCKET ENGINE TEST FACILITY KRASNOZAVODSK, USSR THE RECENTLY CONSTRUCTED SUSPECT LIQUID HY- DROGEN TEST AREA APPEARS OPERATIONAL. TEST ACTIVITY IS OBSERVED AT TEST STANDS 1-4 AND AT THE HORIZONTAL TEST BUILDING IN THE OLDER PORTION OF THE COMPLEX. THE ZAGORSK TEST COMPLEX IS BELIEVED TO BE A FIELD TESTING STATION UNDER THE SUBORDINA- TION OF THE SOVIET MISSILE AND SPACE HEAD- QUARTERS, OR AUTHORITY, WHICH IN TURN IS LOCATED IN KALININGRAD, A SUBURB OF MOSKVA. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC /20: ClA TROP SECRET Attachment tc~ 7 June 1967 Page 2 PLEX CONTAINS 4 VERTICAL TEST STANDS, A HORI- ZONTAL TEST BUILDING AND A HORIZONTAL TEST POSITION, THE MAJOR PORTION OF THE FACILITY WAS COMPLETE WHEN FIRST SEEN IN 1961; BUT EX- PANSION AND CONSTRUCTION HAS BEEN OBSERVED THROUGH CONTINUED COVERAGE. TEST STAND NO 1 IS THE LARGEST TEST STAND IN THE USSR AND THE ONLY STAND CAPABLE OF FULL DURATION TESTING OF THE TOTAL CLUSTER PROPULSION PACKAGE FOR THE TYURATAM AREA J BOOSTER STAGE. THE FIRST EVIDENCE OF THE CONSTRUCTION OF THE SUSPECT LIQUID KHDROGEN TEST AREA WAS OBSERVED IN JUN 64 AND THIS CONSTRUCTION HAS CONTINUED TO DATE. GOOD QUALITY PHOTOGRAPHY OF MAY 66 ALLOWED THE FIRST IDENTIFICATION OF THE SUSPECT LIQUID HYDROGEN PRODUCTION PLANT WHICH SERVES THIS TEST AREA. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. TOP SECRE Approved For Release 2006111/20: CIA-RDP78T0592 - I I Attachment t 7 June 19 7 Page 3 4, COLLATERAL: 5. FIRST IDENTIFICATION: 6. NEGATION DATE: 7. SUBSEQUENT COVERAGE: 8. DIMENSIONS SPECIFICATIONS: 9. MISSION READOUT: IN THE OLDER PART OF THE FACILITY, SOME SCARRING FROM TEST ACTIVITY IS APPARENT AT VERTICAL TEST STANDS 1-4 AND THE HORIZONTAL TEST BUILDING. TEST STAND NO 2 IS VERY SIMILAR TO TEST STAND NO 3 AT THE FEI-CITING MISSILE DEVELOPMENT AND PRODUCTION CENTER, CHANG-HSIN-TIEN, CHINA. THE RECENTLY CONSTRUCTED SUSPECT LIQUID HYDROGEN TEST AREA APPEARS OPERATIONAL, ALTHOUGH SOME SCATTERED CONSTRUCTION CONTINUES. THIS AREA CONTAINS TWO TEST BUILDINGS, THE EASTERNMOST IS A MULTIPLE POSITION TEST BUILDING CONTAINING AT LEAST 2 HORIZONTAL TEST CELLS WHICH FRONT ON A WIDE PAD, A CYLINDRICAL OBJECT =LONG OVERALL ANI I IN DIAMETER RESEMBLING A DIFFUSER IS 25 POSITIONED IN FRONT OF ONE OF THE TEST CELLS AND AN OBJECT APPROXIMATELY 25X5 FT IS IN FRONT OF ANOTHER CELL. THE SECOND TEST BUILDING CONTAINS A SINGLE TEST POSITION THAT HAS A TROUGH-SHAPED DEFLECTOR SITUATED AT ONE END OF THE BUILDING. NO EVIDENCE OF TEST ACTIVITY IS APPARENT AT THESE TEST These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC TOP SECRET Approved For Release 2006111/20: CIA-RDP78TO5929AP02600010006-6 TOP SECRE 0 Attachment to 7 June 1g 7 Page 4 BUILDINGS. NUMEROUS ROOF VENTS ARE VISIBLE ON THE SUSPECT LIQUID HYDROGEN PRODUCTION BUILDING. THE NEARBY SUBSTATION IS COMPLETE. CONSTRUCTION CONTINUES IN THE LARGE ASSOCIATED HOUSING AREA. NUMBEROUS VEHICLES AND RAIL CARS ARE VISIBLE THROUGHOUT THE FACILITY. 25 These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re porting period as indicated by the date of issue. For information concerning these notes contact Chief. Collateral Support Division, NPIC. TOP SECRET I Approved For Release 2006111/20: CIA-RDP78TO5929P )02600010006-6 AkOr NATIMAL & 2c iMrcr ~ T~ c ,t - PCIL117 929 KRASNOZAVODSK, USSR 56-25N 38-1OE SUSPECT LIQUID HYDROGEN TEST AREA APPEARS OPERATIONAL