SOLID PROPELLANT PRODUCTION FACILITY TAI-YUAN, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05929A002600010004-8
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 20, 2006
Sequence Number: 
4
Case Number: 
Publication Date: 
June 7, 1967
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05929A002600010004-8.pdf187.5 KB
Body: 
or a ease 2UU /11/20 : CIA-RD P.7ST,R5928A0 c) NATIONAL PH TATION CENTER II SOLID PROPELLANT PRODUCTION FACILITY TAI-YUAN, CHINA THIS FACILITY INCLUDES NITROGLYCERINE, NITROCELLULOSE AND DOUBLE BASE PROCESSING LINES SIMILAR TO THOSE AT THE SOLID PROPELLANT FACILITIES IN THE USSR LOCATED AT BIYSK, PERM, KRASNOYARSK, STERLITAMAK AND KAMENSK-SHAKHTINSKIY. THE NEARLY OPERATIONAL STATUS OF THE SECOND NITRATOR LINE WILL PRACTICALLY DOUBLE THE AMOUNT OF PROPELLANT THE PLANT CAN PRODUCE. THE NEW EXTRUSION AND GRAIN PROCESSING SITES WILL GREATLY EXPAND THE FACILITY'S FINAL PRODUCT CAPABILITY, These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division. NPIC. Approved For Release 2006/11/20: CIA-RD 78T05929A002600010004- 25X 25X 25 25X 6/11/20: CIA-RD wOS9 4-8 (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER 7 June 1967 Page 2 5. FIRST IDENTIFICATION: 6. NEGATION DATE: 7. SUBSEQUENT COVERAGE: 8. DIMENSIONS/ SPECIFICATIONS: 9. MISSION READOUT: II CLOSE TO BEING OPERATIONAL. CONSTRUCTION APPEARS TO BE AT A STANDSTILL ON THE THIRD NITRATOR LINE, POSSIBLY DUE TO THE HEAVY CONSTRUCTION GOING ON ELSEWHERE IN THE FACILITY. A NEW POSSIBLE NITROGLYCERINE RECOVERY UNIT OR SLUMP HOUSE HAS BEEN CONSTRUCTED DUE EAST OF THE SECOND NITRATOR LINE. DIRECTLY EAST OF THE THIRD NITRATOR LINE, 2 REVETTED PROBABLE EXTRUSION BUILDINGS APPEAR NEARLY COMPLETE. TWO MORE ARE IN THE MID-STAGE OF CONSTRUCTION. THE PREVIOUSLY COMPLETED REVETTED STRUCTURE IN THE NE CORNER OF THE FACILITY APPEARS TO BE FOR THE PURPOSE OF FINAL GRAIN PROCESSING (I.E. GRAIN TRIM, SOLVENT, AND INHIBITOR APPLICATION). TWO NEW REVETTED STRUCTURES HAVE BEEN COMPLETED DUE NORTH OF THE GRAIN PROCESSING BUILDING. THESE BUILDINGS MAY SERVE AS STORAGE/PROCESSING SITES. CONSTRUCTION ACTIVITY, GRADING, AND TRENCHING, POSSIBLY FOR STEAM These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division. NPIC. Approved For Release 2006/11/20: CIA-RD 4-8 Approve PI Fe - R-Iiiiiiii- RIP /11/20: CIA-RDP78T05929A00 04-8 I T TOP SFICSF ' (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Attachment to 7 June 1967 Page 3 These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. Approved For Release 2006/11/20: CIA-RD 78TO5929AO026000100 t M;m n 'COL ~~ SEE REVERSE SIDE FOR COPY HIJIDREI