ROCKET MOTOR TEST FACILITY BIYSK, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05929A002500050020-7
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 20, 2006
Sequence Number: 
20
Case Number: 
Publication Date: 
June 7, 1967
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05929A002500050020-7.pdf141.4 KB
Body: 
pproved For Release 2006/11/20: CIA-RDP78TO5929AO02500050020-7 TOP SECRET Attachment A 7 June 47L' Page 1 Copy 5 8 1. SIGNIFICANCE: 2. LOCATION: 3. REMARKS: ROCKET MOTOR TEST FACILITY BIYSK, USSR THE BIYSK TESTING & PRODUCTION FACILITY IS ONE OF SEVEN KNOWN INSTALLATIONS INVOLVED IN THE SOVIET SOLID PROPELLANT EFFORT, THE BIYSK FACILITIES INCLUDE A DOUBLE-BASE PROPELLANT PRODUCTION PLANT, A MODIFIED SOLID PROPELLANT PLANT, MAIN TEST FACILITY AND AN ISOLATED TEST POSITION, 01 These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. GROUP I E.c lud.d ~r d.~nyr.d~ny and d.c lo..alica~io~ TOP SECRET Approved For Release 2006/11/20: CIA-RDP78TO5929AO02500050020-7 I pproved For Release 2006/1100 - - T05929A002500050020-7 TOP SECRETI Attachment tol 25X1 7 June 19b7 Page 2 Copy SERVED THE MOSCOW MISSILE & SPACE DEVELOP- MENT COMPLEX KALININGRAD 88. THE FIRST KY-6 SOLID FIRING TOOK PLACE FROM THE PLESETSK FACILITY. 5. FIRST IDENTIFICATION: ISOLATED TEST AREA: 6. NEGATION DATE: NONE 7. SUBSEQUENT COVERAGE: 15 KH-4, 7 KH-7, 8. DIMENSIONS/ SPECIFICATIONS: 9. MISSION READOUT: ISOLATED TEST: ROCKET MOTOR, IN DIAMETER. MAIN TEST : ROCKET MOTOR, IN DIAMETER. A HIGH DEGREE OF ACTIVITY IS EVIDENT IN THE TEST FACILITIES AND IN THE ASSOCIATED MOTOR AND PROPELLANT PRODUCTION FACILITIES, A LARGE APPARENT SOLID ROCKET MOTOR, APPROXIMATELY I I POSITION. A WELL-DEFINED BLAST MARK APPROXIMATELY 15 FT WIDE AT THE MID- POINT IS ALSO OBSERVED. THE BLAST MARK IS LIGHT-TONED AND HAS A TOTAL These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. TOP SECRET 25X1 25X1 Approved For Release 2006/11/20: CIA-RDP78TO5929AO02500050020-7 IS MOUNTED IN A FIRING POSITION AT THE ISOLATED TEST proved For Release 2006/1 - R 7 8TO5929AO02500050020-7 25X1 TOP SECRET Attachrnent tol 7 June 19b7 Page 3 Copy LENGTH OF APPROXIMATELYI kT IS SEPARATED FROM THE END OF THE MOTOR, A SMALL POSSIBLE SOLID ROCKET MOTOR, APPROXIMATELY IS ON A RAIL SPUR IN THE MAIN TEST FACILITY WHERE THE PREVIOUSLY REPORTED CONSTRUCTION ADJACENT TO THE SMALLER OF THE 2 TEST POSITIONS CAN NOW BE IDENTIFIED AS 2 SMALL BUILDINGS OR LARGE HORIZONTAL TANKS WHICH ARE PROBABLY SUPPORT FOR THE SMALL TEST CELL, THE 2 ROCKET MOTORS HAVE DIMENSIONS THAT APPROXIMATE THE FIRST AND SECOND STAGES OF THE SAVAGE MISSILE, 25X1 25X1 25X1 These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For informal Division, NPIC. TOP SECRET Approved For Release 2006/11/20: CIA-RDP78TO5929AO02500050020-7 ApprouetEaiitI sl'easee200&/1'1'/20 : CIA-RDP78T0592 A IMTMMM Flmi/af MTEVADATDI WIID ROCKET MOTOR TEST FACILITY BIYSK, USSR 52-29N 85-07E HAI 25X1