PROBABLE TACTICAL SSM SUPPORT FACILITY SYZRAN, USSR

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05929A002300100006-9
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
5
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 20, 2006
Sequence Number: 
6
Case Number: 
Publication Date: 
February 21, 1967
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05929A002300100006-9.pdf204.55 KB
Body: 
Approved For Release 2006/11/20: CIA-RDP78TO5929AO02300100006-9 TOP SECRET t) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER I Page 1 Copy 1 PROBABLE TACTICAL SSM SUPPORT FACILITY SYZRAN, USSR THE SYZRAN STORAGE SITE, WHICH INCLUDES AN ORDINANCE PLANT, A TRANSSHIPMENT POINT, AND VENTILATED WAREHOUSES, These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. 1. SIGNIFICANCE: PHOTOGRAPHIC EVIDENCE OF AN UNUSUALLY HEAVY- SECURED, LARGER ARCH-ROOFED BUILDING WHICH MAY SERVE AS A WARHEAD BUNKER, 2. LOCATION: HEAVILY SECURED, THE SYZRAN PROBABLE CW DE- POT IS LOCATED ON THE WEST EDGE OF SYZRAN. GR OU E .c lud>d Iron o da wngrad~np and dwe le>a(~c e~~~ TOP SECRET Anne. rid For Release 2006/11/20: CIA-RDP78TO5929AO02300100006-9 TOP SECRE~ (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER 5. FIRST IDENTIFICATION: THE FOUR ARCH-ROOFED BUILDINGS: BE ENTIRE SYZRAN INSTALLATION: 6. NEGATION DATE: 7? SUBSEQUENT COVERAGE: 15 KH-)+, 2 KH-7, AND JJ . MISSION READOUT: THE BUNKER IN THE SE CORNER OF THE SYZRAN STORAGE DEPOT IS AN ENLARGED ARCH-ROOFED PROBABLE DRIVE-THROUGH BUILDING. IT MEASURES 275 FT X 225 FT INCLUDING EARTH-COVERING AND IS SEPARATED FROM THE These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief. Collateral Support Division, NPIC. TOP SECRET Approved For Release 2006/11/20: CIA-RDP78TO5929AO02300100006-9 TOP SECRET (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER D Page 3 21 February 1967 REST OF THE DEPOT BY DOUBLE FENCING. THE BUNKER IS POSSIBLY FOR STORAGE OF WARHEADS IN CONJUNCTION WITH TACTICAL MISSILE AIRFRAMES IN THE OTHER THREE EARTH-COVERED ARCH-ROOFED BUILDINGS. THERE ARE APPROXIMATELY 120 MISSILE DOLLIES PRESENT NEARBY. A HEAVILY SECURED TRANSLOADING POINT CONTAINING TWO POSSIBLE EARTH-COVERED BUILDINGS IS IMMEDIATELY SOUTH OF THE SECURED BUNKER. NPIC POSITION AT PRESENT IS THAT THIS SUPPORT INSTALLA- TION WILL PROBABLY BECOME ONE OF A SERIES OF TACTICAL SSM SUPPORT FACILITIES FOUND IN THE USSR, AS CONSTRUCTION IS COMPLETED. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief Collateral Division, NPIC. TOP SECRET Ar)oroved For Release 2006/11/2 - Approved For Release 2006/11/20: CIA-RDP78T05929AO02300100006-9 MMK PUTINVI WOPItTInIM OM PROBABLE TACTICAL SSM SUPPORT FACILITY SYZRAN, USSR 53-09N 48-22E IBS 60X ENLARGEMENT 001 Approved For Release 2006/11/20: CIA-RDP78T05929A002300100006-9 Approved For Release 2006/11/20: CIA-RDP78TO5929AO02300100006-9 Q Approved For Release 2006/11/20: CIA-RDP78T05929A002300100006-9