POSSIBLE SOLID PROPELLANT ROCKET MOTOR COMPLEX HU-HO-HAO-TE, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05929A002200020001-4
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
4
Document Creation Date: 
December 28, 2016
Document Release Date: 
January 16, 2007
Sequence Number: 
1
Case Number: 
Publication Date: 
October 27, 1966
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05929A002200020001-4.pdf215.36 KB
Body: 
Approved For Release2007/01/16 : CIA-RDP78T05929A002200020001-4 TOP SECRET (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Attachment to 27 October 1966 Page 1 Copy 1 REFERENCE: 1. SIGNIFICANCE: POSSIBLE SOLID PROPELLANT ROCKET MOTOR COMPLEX HU-HO-HAO-TE, CHINA A RAPID RATE OF CONSTRUCTION IS OBSERVED AT THESE FACILITIES. 2. LOCATION: 16 NM ESE OF HU-HO-HAO-TE AT 4045N - 11158E. 3. REMARKS: ONE OF THE MOST STRIKING FEATURES OF THIS COM- PLEX IS THE RATE OF PROGRESS OBSERVED BETWEEN SEP 63, WEEN NO CONSTRUCTION ACTIVITY WAS DIS- CERNIBIR, AND APR 66, WHEN THE COMPLEX WAS BE- TWEEN 65 AND 95 PERCENT COMPLETE. 4. COLLATERAL: NONE 5. FIRST IDENTIFICATION: 6. NEGATION DATE: 7. SUBSEQUENT COVERAGE: 5 KH-7 MISSIONS. 4 KH-4, AND 8. DIMENSIONS/ SPECIFICATIONS: NONE These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concernin: these notes contact Chief, Collateral Support Division, NPIC. Escluditdfrom?outprnot,c downprod., e.c,assil.ca?ion TOP SECRE Approved For Release 2007/01/16: CIA-RDP78T05929A002200020001-4 Approved For Release2007/01/16 : CIA-RDP78T05929A002200020001-4 TOP SECRET (,) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Attachment tc 27 October lyob Page 2 9. MISSION READOUT: THE POSSIBLE PROPELLANT PROCESSING/HANDLING FACILITY CONTAINS AT LEAST 9 HEAVILY PROTECTED BUILDINGS, 8 OF WHICH ARE LARGE STRUCTURES. IT NOW APPEARS TO RE A POSSIBLE PROPELLANT PROCESSING/ HANDLING FACILITY RATHER THAN A POSSIBLE STORAGE/TEST FACILITY. NO EV- IDENCE OF AN OVERALL SECURITY SYSTEM OR DEFENSES OBSERVED. THE POSSIBLE PROPELLANT PLANT WHICH HAS APPROXIMATELY 10 RE VETTED OR DUG-IN STRUCTURES, APPEARS TO HAVE MOST OF THE MAJOR BUILDINGS COMPLETED, HOWEVER, MINOR CONSTRUCTION IS EVIDENT THROUGHOUT THE PLANT AREA. SEVERAL SMALL BUILDINGS ARE UNDER CONSTRUCTION AT THE WEST EDGE OF THE PLANT. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. TOP SECRET Approved For Release 2007/01/16 ? C A-R DP /8 I 05929A002200020001-4 moerporfi Approved For Release 2fflrig11Agic:TPIRrPort78T05929A002200020001-4 POSSIBLE SOLID PROPELLANT ROCKET MOTOR COMPLEX HU-HO-HAO-TE, CHINA 40-45N 111-58E POSSIBLE PROPELLANT PROCESSING HANDLING FACILITY FABRICATION PLANT VIO: ' POSSIBLE PROPELLANT PLANT FOSS TEST FACILITY ACPOSSIBLE PROPELLANT PLANT BLDGS COMPLETED OR U/C SINCE APRIL 1966 POSSIBLE PROPELLANT PROCESSING/HANDLING FACILITY ? .r: FACILITY CONSTRUCTED SINCE APRIL 1966 50X ENLARGEMENT 40% ENLARGEMENT .-"4- BUILDING COMPLETED SINCE APRIL 1966 11.111.W111./11 SEE REVERSE SIDE FOR COPY NUMBER Approved For Release 2007/01/16: CIA-RDP78T05929A002200020001-4 FRI REPRODUCTION OF THIS DOCUMENT IN WHOLE OR IN PART IS PROHIBITED EXCEPT WITH THE PERMISSION OF THE OFFICE OF ORIGIN.