LAUNCH COMPLEX B SHUANG-CHENG-TZU MISSILE TEST CENTER, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05929A002200010001-5
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
November 7, 2006
Sequence Number: 
1
Case Number: 
Publication Date: 
October 26, 1966
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05929A002200010001-5.pdf421.5 KB
Body: 
Approved For Release 2006/11/08: CIA-RDP78TO5929AO02200010001-5 TOP SECREJ NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER 26 October 1966 Page 1 REFERENCE: Mission 4033, LAUNCH COMPLEX B SHUANG-CHENG-TZU MISSILE TEST CENTER, CHINA 1. SIGNIFICANCE: THE LARGE GANTRY AT LAUNCH COMPLEX "B" APPEARS EXTERNALLY COMPLETE. 2. LOCATION: SHUANG-CHENG-TZU MISSILE TEST CENTER IS APPROX- IMATELY 50 NM NE OF SHUANG-CHENG-TZU AT 4107N - 10020E. LAUNCH COMPLEX "B": 4115N - 10018E. ORIGINAL CONSTRUCTION DID NOT PROGRESS PAST THE LAYOUT AND EXCAVATION STAGE AND THE SITE REMAINED DORMANT FROM 1962 TO MID 1965. WITH THE RESUMP- TION OF CONSTRUCTION IN AUG 65, THE SITE IS TAKING ON AN ENTIRELY NEW CONFIGURATION. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. TOP SECRET I Approved For Release 2006/11/08: CIA-RDP78TO5929AO02200010001-5 TOP SECRET NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Attachment to 25X 26 October 1966 Page 2 5. FIRST IDENTIFICATION: 6. NEGATION DATE: 7. SUBSEQUENT COVERAGE: 8. DIMENSIONS/ SPECIFICATIONS: II 40 KH-4, 8 KH-7, AND THE GANTRY IS 195 FT HIGH, WITH A MAXIMUM WIDTH OVER THE DRIVE MECHANISM, AND A WIDTH OF AT THE TOP. THE OPEN WORK SPACE BETWEEN THE UPRIGHT IS 25 FT WIDE AND HAS A HEIGHT OF 140 FT. THIS OPENING DOES NOT APPEAR TO EXTEND THE FULL These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief. Collateral Ciinnnrt Division, NPIC. r TOP SECRET Approved For Release 2006/11/08: CIA-RDP78TO5929A TOP SECRET (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER DEPTH OF THE GANTRY. 9? MISSION READOUT: CONSTRUCTION CONTINUES AT A RAPID RATE AT LAUNCH COMPLEX "B". THE GANTRY APPEARS EXTERNALLY COMPLETE AND IS CONSTRUCTED OF STEEL GIRDERS IN AN OPEN LATTICEWORK PATTERN. SERVICE ROADS HAVE BEEN CONSTRUCTED BETWEEN THE SECOND RAIL SPUR AND THE LAUNCH POSITION. CONCRETE HAS BEEN POURED ON THE APPROACH TO THE LAUNCH THE LAUNCH COMPLEX. CONSTRUCTION, AND CONSIDERABLE GRADING ACTIVITY ARE VISIBLE THROUGHOUT WALLS HAVE NOT BEEN BACK-FILLED. SEVERAL OPEN TRENCHES, BUILDINGS UNDER POSITION AND THE FLAME PIT NOW APPEARS TO BE COVERED OVER, BUT THE SIDE These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, CoHate Division, NPIC. TOP SECRET Approved For Release 2006/11?/08: CIA-RDP78TO5929AO02200010001-5 VA VA N SECRET =2m V 0 19 Figure 45. SECRET) Mobile Gantry Crane (U) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Approved For Reba ~(EC G%Y08 . fj)MPFkFff 0F29AO02200010001-5 SHUANG-CHENG-TZU MISSILE TEST CENTER, CHINA 41-15N 100-18E I 25X1 25X1 PC Approved For Release 2006/11/08: CIA-RDP78T05929A002200010001-5 Approved For Release 2006/11/08: CIA-RDP78TO5929AO02200010001-5 'IJ