KUN-MING/KUEI-YANG RAILROAD UNDER CONSRTUCTION, CHINA

Document Type: 
Document Number (FOIA) /ESDN (CREST): 
CIA-RDP78T05929A001800020012-7
Release Decision: 
RIPPUB
Original Classification: 
T
Document Page Count: 
6
Document Creation Date: 
December 28, 2016
Document Release Date: 
February 9, 2007
Sequence Number: 
12
Case Number: 
Publication Date: 
June 9, 1966
Content Type: 
REPORT
File: 
AttachmentSize
PDF icon CIA-RDP78T05929A001800020012-7.pdf345.51 KB
Body: 
roved For Release 2007/02109 : - 8T05929A001800020012-7 TOP SECRE (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER te':?~:~ Attachment to 9 June 7.gU~ Page 1 Copy ~ KUN-MING/KUEI-YANG RAILROAD UNDER CONSTRUCTION, CHINA Cni~TGr~: HIGH LEVEL OF CONSTRUCTION ACTIVITY ON TI-~ KUN-MING~KUEI-YANG RAILROAD. 2. tip!"_~RiiS: WHEN COMPLETED, THIS RAIL LINE WILL CON- NECT YUN-PdAN PROVINCE WITH THE REST OF CHINA'S RAIL NETWORK. THIS WILL ELIMINATE THE NECES- SITY OF SUPPLYING SOUTHWEST CHINA BY THE MORr WLNERABLE~ SOUTHERN ROUTE (SOUTHWEST FROM Nlru'~T- NING, CHINA, THROUGH NTORTH VIETNAM TO HA NOI, AND THEN NORTHWEST TO KUN-~'lING~. MOREOVER, CHINA'S CAPABILITY FOR DELIVERING GOODS TO NORTH VIETNAM WILL BE INCREASED, SHIPPING BY RAIL VIA K[TN-MING AS WELL AS VIA NAN-NING. CONSTRUCTION OF THIS RAIL LINE WAS STARTED DURING 1959, BUT WAS STOPPED OR SLOWED DURING 19x,0-7.962. KH PHOTOGRAPHY Or AUG, NOV, AND DEC 65 REVEALED THAT IT WAS ACTIVELY UNDER CCN- These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Su ort Division, NPIC. TOP SECRET pproved For Release 2007/02109 - P78T05929A001800020012-7 TOP SECRET (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER 3. LOCATION: 5. FIRST IDENTIFICATION: 6. NEGATION DATE: 7. SUBSEQUENT COVERAGE: g June 1866 Page 2 STRUCmrOI\T, AS OF (THE LAST COVERAGE PRIOR TO HE RAIL- ROAD WAS COMPLETE FROM KUN-MING NORTHEASTWARD FOR APPROXIMATELY 135 NM AND FROM KUEI-YANG SOUTHWESTWARD FOR APPROXIMATELY 70 NM. COMPLETED RAIL LINE WILL EXTEND FROM KUN-MING (2504N -- 102!!-lE) TO KUEI-YANG (2635N - 10642E~, A DISTANCE OF APPROXIMATELY 300 NM. 11 KH-4, AT LEAST ONEI I ONE TALENTS AND ONE These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For informa'ion Division, NPIC. T ,4pproved For Release 2007/02109 ;SJAB.QP78T05929AO018o0020012-7 TOP SECRET (c) NATIONAL PHOTOGRAPHIC: INTERPRETATION CENTER Attachment to 9 June 19 Page 3 8. DIMENSIONS SPECIFICATIONS: 9. MISSION READOUT: KUN-MING~KUEI-YANG RAIL LINE TO BE VERY ACTIVE, WITH NUMEROUS CONSTRUCTION CAMPS AND SMALL QUARRIES AND PITS (FOR BALLAST) OBSERVED ALONG THE ROUTE. THE LINE APPEARS TO BE FULLY OPERATIONAL FROM KUN-MING TO 2634N - 10425E. FROM THIS POINT TO THE SOUTHWESTERN END OF THE TUNNEL COMPLEX (264oN - 1o436E) GRADING APPEARS TO BE NEAR COMPLETION; EXTENSIVE TUN- NELLING IS U1~'DERWAY; AND AT FEAST 1+ SETS OF BRIDGE PIERS ARE AS YET UN- DECKED. FROM KUEI-YANG THE LINE IS FULLY OPERATIONAL TO 2613N - 10521E .. IT IS POSSIBLY OPERATIONAL TO APPROXIMATELY 7 NM SOUTHEAST OF SHUI-CHENG AT 2633N - 10457E WHERE POSSIBLE ROLLING STOCK IS OBSERVED. FROM THIS POINT TO THE NORTHEASTERN END OF 2643N - 1o438E), GRADING APPEARS TO BE NEAR COMPLETION AND AT LEAST 11 SETS OF BRIDGE PIERS 10. ~ .O TENT PHOTOr AP : CIA~IAD OUT CABLE 58138, APR 2,66: "ANALYSIS REVEALS CONTINUED RAPID CONSTRUCTION ON THIS RAIL LINE. ON THE KUN-MING SIDE, THE LINE IS NOW POSSIBLY COMPLETE FROM KUN-MING NORTHEASTWARD TO 2640N - 10438E, APPROXIMATELY 17 NM NORTH- These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information concerning these notes contact Chief, Collateral Support Division, NPIC. n ~--_~,..,,,.-< r=nr ~aia~~o ~nn7moma (`IIl_RflP7RTfiFA7QOft(1~Rft(1ft7ft(1~7_7 Approved For Release 2007/02109 :CIA-RDP78T05929A001800020012-7 TOP SECRET (c) NATIONAL PHOTOGRAPHIC INTERPRETATION CENTER Attachment t g June lg Page 4 WEST OF SHUI-CHENG. ... THE VISIBLE BRIDGES ALONG THIS SECTION HAVE BEEN COMPLETED AND A POS- SIBLE WORK TRAIN WAS OBSERVED AT 2640N - 10438E .... AT THE WESTERN END OF THE TUNNEI~COMPLEX BRIDGE PIERS WITH DECKING ARE VISIBLE ...." REVEALS (ON POOR QUALITY PHOTOGRAPHY THAT ADDITIONAL BRIDGE PIERS HAVE BEEN DECKID IN THE SHUI-CHENG AREA. These notes have been prepared for briefing purposes only and should not be used for detailed analytical work. Their use should be restricted to the particular briefing board(s) they were prepared for and must be considered valid only for the re- porting period as indicated by the date of issue. For information c Division, NPIC. T 2 Annrnvarl Fnr RPIPa_ _ TrlSG~GAf1C11 RflCifl~f1C11 ~-7 Approved For Release 2007r~~~Q KUN-MING/KUEI-YANG RAILROAD UNDER CONSTRUCTION CHINA - OPERATIONAL - POSSIBLY OPERATIONAL - UNDER CONSTRUCTION Approved For Release 2007/02109 :CIA-RDP78T05929A001800020012- ` `"`"""""`"' "x?26-33N 104-57Eti .. ~. '' Approved For Release 2007/02109 :CIA-RDP78T05929A001800020012-7 Approved For Release 2007/02109 :CIA-RDP78T05929A001800020012-7